Amended_FY18_-_FY22_Ratemaking_Memorandum_of_Understanding.pdf
PDF 248 KB Posted
- Solicitation number
- HTC711-18-R-CC04
About this file
This memorandum of understanding establishes ratemaking methodologies for pricing international airlift services provided by air carriers participating in the Civil Reserve Air Fleet program administered by the United States Transportation Command from October 2018 through September 2022. The pricing methodologies include calculations for profit using weighted guidelines from the Defense Federal Acquisition Regulation, depreciation of aircraft, aircraft utilization rates, weighting of rates by aircraft type, carrier participation incentives, and biennial escalation of rates. Carriers providing the services must agree to the ratemaking methodologies and furnish required financial and operational data to enable determination of fair and reasonable pricing.
Amended FY18-FY22 Ratemaking Memorandum of Understanding
View the file
Other files
Show 40 more
Latest 50 of 94 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RATEMAKING
MEMORANDUM OF UNDERSTANDING
BETWEEN
(CARRIER)
AND
UNITED STATES TRANSPORTATION COMMAND
Effective 1 October 2017 through 30 September 2022
1. The purpose of this Memorandum of Understanding (MOU) is to establish guidelines to facilitate the establishment of rates for passenger, cargo, and combi airlift services with certificated air carriers willing to participate in the Civil Reserve Air Fleet (CRAF) program.
Objectives of the CRAF program include augmenting the airlift capability of United States
Transportation Command (USTRANSCOM) and assuring a mobilization base of aircraft available to the Department of Defense (DOD) for use in the event of any level of national security contingency.
2. The origins of the CRAF program can be traced to Executive Order No. 10219, 2 March 1951, 16 F. R. 1983. In the Executive Order, the Secretary of Commerce was directed to formulate plans and programs to meet the requirements for civil air transportation to include plans for the transfer or assignment of aircraft from civil air carriers to the DOD to meet defense mobilization needs. By joint agreement on 15 December 1951, the Secretaries of Commerce and
Defense established the CRAF program to augment military airlift capability in times of emergency. Several years later, Executive Order 10999, 20 February 1962, 27 F.R. 1527, directed the Secretary of Commerce to prepare plans with respect to all degrees of national emergency. As a result, the 15 December 1951 joint agreement was rescinded by an interagency memorandum of understanding dated
8 August 1963 in which the Secretaries of Commerce and Defense jointly recognized “the requirement for incremental activation of the CRAF to meet varying defense emergency needs for the civil airlift augmentation to the military airlift capability.” To meet this requirement, USTRANSCOM structures award of aircraft service contracts to insure a mobilization base of aircraft is capable of responding to any level of defense emergency. Executive Order 11490, 30
October 1969, 34 F.R. 17567 rescinded Executive Order 10999 and designated the Secretary of
Transportation responsible for developing plans to utilize civil air transportation resources to meet civil and military needs during national and defense-oriented emergencies. Executive
Order 12656, 18 November 1988, 53 F.R. 47491 rescinded Executive Order 11490 and further defined emergency preparedness functions of various government departments and agencies.
The 8 August 1963 interagency memorandum of understanding was rescinded by a later agreement between the Secretaries of Transportation and Defense dated 7 May 1981. The 7 May
1981 agreement defined responsibilities of both secretaries and established a five-year review cycle for the document. The 7 May 1981 interagency memorandum was rescinded by a later agreement dated 15 September 1987. The current interagency memorandum of understanding between the Secretaries of Transportation and Defense, dated 10 November 1998, concerns departmental cooperation on the CRAF program and remains in effect indefinitely, unless amended by mutual agreement or terminated.
3. The history of ratemaking to price DOD airlift service is nearly as long as the history of
CRAF. Between 1955 and 1962, the DOD relied upon price competition to meet its commercial airlift needs. Congressional Subcommittee hearings held at the time determined price competition to be non-compensatory and destructive to the industry. As a result, the ratemaking process was implemented under the regulatory authority of the Civil Aeronautics Board (CAB).
Ratemaking continued under the CAB until deregulation in 1980. At that time, civil air carriers and DOD’s contracting agency for long-term international airlift, Military Airlift Command
(MAC), agreed by MOU, that CAB methodologies by which rates for DOD airlift were established produced fair and reasonable rates and furthered the objectives of the CRAF program; and, therefore, the parties agreed to continue to use CAB methodologies for establishing MAC uniform negotiated rates under a MOU renewed every five years. MAC became Air Mobility Command (AMC) on 1 June 1992. Ratemaking continued under AMC until 1 January 2007 when DOD’s contracting authority for long-term international airlift was transferred from AMC to USTRANSCOM. On 31 December 2011 the FY12 National Defense
Authorization Act (FY12 NDAA) was signed into law. The law authorizes the Secretary of
Defense to establish fair and reasonable rates for payments made to participants in the CRAF program. The FY12 NDAA states in Section 366, “Chapter 931 of title 10, United States Code is amended by inserting after section 9511, the following new section” 9511a. “The Secretary of
Defense shall determine a fair and reasonable rate of payment for airlift services provided to the
Department of Defense by air carriers who are participants in the Civil Reserve Air Fleet
Program.” In addition, the FY12 NDAA adds “the Secretary of Defense shall prescribe regulations for purposes of subsection (a.)” The DAR Council communicated to
USTRANSCOM that it believes it is appropriate for USTRANSCOM to implement Section 366 into the USTRANSCOM Supplement as it relates only to the USTRANSCOM CRAF contracts.
Title 32, Code of Federal Regulations was amended on 28 May 2015 by adding part 243, Department of Defense Ratemaking Procedures for Civil Reserve Air Fleet Contracts.
4. USTRANSCOM is required to contract with U.S. certificated air carriers certificated by the
Department of Transportation (DOT) under Title 49 U.S. Code Chapter 411, including former
Section 401 of the Federal Aviation Act of 1958, as amended. Air carriers holding authority to engage in air transportation pursuant to former Section 401 are required by 14 CFR, Part 241 to comply with a Uniform System of Accounts and Reports (USAR). This comprehensive system of accounts and reports was established to provide uniformity and consistency in a regulated industry. With the demise of the CAB, the responsibility for accounts and reports was transferred to the DOT. What was the USAR under the CAB became the Research & Special
Programs Administration (RSPA) reports under DOT. USAR was the foundation for the CAB’s economic regulations and policy statements. USTRANSCOM continues to use RSPA reports, formerly USAR, in the development of the annual uniform negotiated rates.
5. The DOD augments its airlift capacity by using commercial airlift in a manner designed to contribute to sound economic development of an increased, modern civil airlift capability and to enhance the ability of U.S. air carriers to support the military forces in time of war with maximum effectiveness. USTRANSCOM accomplishes this through the negotiation and award of DOD airlift service contracts to U.S. air carriers which own or otherwise control aircraft suitable for allocation to the CRAF. These contracts are awarded using uniform rates to promote the objectives of the CRAF program.
6. USTRANSCOM uses ratemaking methodologies found in Attachment 1 for establishing pricing of airlift services. The parties to this MOU agree that these methodologies are effective means of establishing fair and reasonable rates and furthering the objectives of the CRAF program. The parties, therefore, agree to these ratemaking methodologies in negotiating rates for future DOD airlift services for the term of this agreement. In furtherance of this agreement, and as a condition of its continued participation in the CRAF program, the Carrier agrees to furnish
USTRANSCOM with the financial and operational information required by USTRANSCOM to adequately make a determination of fairness and reasonableness of price. USTRANSCOM also agrees to conduct an annual review of this information and to negotiate with the U.S. air carriers participating in the CRAF program to determine its projected cost that would properly be allocable to applicable future DOD airlift service contracts. To facilitate negotiation between the parties, USTRANSCOM may issue proposed rates for carrier comments. USTRANSCOM will consider all carrier comments before issuing final rates. In case of any disagreement about the fairness or reasonableness of the final rates issued by USTRANSCOM, the Carrier shall first address their concerns to the ratemaking team for resolution. Ratemaking issues not resolved to a Carrier’s satisfaction through discussions with the ratemaking team may be directed to the contracting officer. If resolution cannot be made by the contracting officer, concerned parties may contact the ombudsman appointed to hear and facilitate the resolution of such concerns.
The Carrier shall refer to its USTRANSCOM contract for the contact information of the ombudsman. In the event a ratemaking issue is not resolved through the ombudsman process, the issue will be forwarded to the Director of Acquisition, USTRANSCOM, for the final agency resolution.
7. This MOU will be effective for applicable contracts from 1 October 2018 through 30
September 2022. Either party may terminate this MOU by giving the other party 90-days written notice, subject to continuation of any obligations of the carrier pursuant to the terms of a contract or separate agreement that references, incorporates, or otherwise relies on the terms of this
MOU.
8. USTRANSCOM will allocate appropriate military peacetime airlift among participating
CRAF carriers. Carrier participation in the USTRANSCOM Peacetime Airlift Program will be wholly voluntary. Any properly certified and DOD-approved carrier may participate in the
CRAF program if it offers aircraft useful to CRAF, agrees to and complies with the conditions of this MOU, and executes a USTRANSCOM contract.
9. The parties understand that this MOU imposes no financial or contractual obligation upon either party. Placement and pricing of DOD airlift services and commitment of aircraft to the
CRAF program will be accomplished via contracts awarded after solicitation and negotiation in compliance with applicable laws and regulations.
10. This MOU supersedes any prior ratemaking MOUs between DOD and the Carrier.
United States Transportation Command
(Carrier Name)
By By
(Signature) (Signature)
(Name/Title) (Name/Title)
(Date) (Date)
Attachment:
International USTRANSCOM Ratemaking Methodology
ATTACHMENT
INTERNATIONAL USTRANSCOM RATEMAKING METHODOLOGY
Subject Paragraph
Profit 1
Depreciation 2
Utilization 3
Weighting of Rate 4
Participation 5
Biennial Escalation 6
1. PROFIT. USTRANSCOM will calculate profit based on the weighted guidelines methodology established in Defense Federal Acquisition Regulations 215.404. For purposes of determining total operating cost in calculating profit, fuel cost will be the carrier’s fuel burn rate multiplied by the fuel cap amount, as indicated in paragraph 1.1.2.1 below.
1.1. WEIGHTED GUIDELINES. The weighted guidelines will be applied separately to operating costs less fuel and then to fuel costs.
The weighted guidelines method focuses on four profit factors based upon a structured approach.
The four profit factors include performance risk, contract type risk, facilities capital employed, and cost efficiency factor.
1.1.1 APPLICATION TO OPERATING COSTS LESS FUEL.
1.1.1.1. PERFORMANCE RISK. Performance risk is broken down into two categories, technical and management/cost control.
1.1.1.1.1. TECHNICAL. All non-fuel cost will consist of a 60% weighting. Assigned rates will range between 3% and 7% dependent on carrier input along with TCAQ-P analysis.
1.1.1.1.2. MANAGEMENT/COST CONTROL. All non-fuel cost will consist of a 40% weighting. Assigned rates will range between 3% and 7% dependent on carrier input along with
TCAQ-P analysis.
1.1.1.2. CONTRACT TYPE RISK. Operating cost less fuel will be assigned 5% for contract type risk.
1.1.1.3. FACILITIES CAPITAL EMPLOYED. The assigned range for equipment will be dependent on the carrier’s average age of the fleet, which may consider modern equipment upgrades, and based upon the table below:
A/C
Age
<5YR 5 to <10Yr 10 to <15Yr 15 to <20 Yr 20 to <25 Yr ≥ 25 Yrs
25% 20% 17.5% 15% 12.5% 10%
1.1.1.4. COST EFFICIENCY FACTOR. A cost efficiency factor will be assigned based upon the individual carrier’s percentage decrease in total operating cost less fuel compared to the carrier’s total operating cost less fuel used in the immediately preceding final published Uniform
Rates and Rules. Any percentage decrease in total operating cost less fuel greater than one percentage will receive a cost efficiency factor equal to one half of the decrease. The maximum cost efficiency to be assigned is four percent. If this calculation does not adequately predict cost efficiency such as when a carrier’s year-over-year increase is a result of operations to high cost locations or a carrier has introduced a fuel efficient aircraft with no prior year’s comparisons, carriers are encouraged to provide a narrative explaining justification for a higher cost efficiency rating. Supporting documentation of the proposed cost efficiency factor must be included. Any narrative provided is limited to 5 pages in length.
1.1.2 APPLICATION TO FUEL COST.
1.1.2.1 MAXIMUM FUEL PROFIT. Profit on fuel will be applied up to a maximum amount per gallon, or cap. The cap will be calculated as a five-year rolling average of fuel paid by
CRAF carriers as reported on fuel reconciliation summary reports, from April through March for the previous 5 years, and tracked in the TCAQ-P fuel database. Significant incidents of abnormally low or high fuel cost through DESC will be evaluated and adjusted as necessary.
In the event the fuel pegged rate is greater than the cap amount, the cap will be used in determining fuel profit. If the fuel pegged rate is less than the cap, the actual fuel pegged rate will be used to determine fuel profit.
1.1.2.2. PERFORMANCE RISK. Performance risk is broken down into two categories, technical and management/cost control.
1.1.2.2.1 TECHNICAL. Fuel cost will consist of a 30% weighting with an assigned rate of 4%.
1.1.2.2.2 MANAGEMENT/COST CONTROL. Fuel cost will consist of a 70% weighting with an assigned rate of 5.5%.
1.1.2.3. CONTRACT TYPE RISK. Fuel cost will be assigned 0% rate for contract type risk.
2. DEPRECIATION. USTRANSCOM will apply economic life standards for new aircraft at
14 years, 2 percent residual (narrowbody) and 16 years and 10 percent residual (widebody) aircraft. USTRANSCOM will apply economic life standards for used aircraft at 10 years and 5 percent residual (narrowbody and widebody aircraft). USTRANSCOM’s definition of used older aircraft is aircraft that exceed the 14 years (narrowbody) and 16 years (widebody) from aircraft’s production date. USTRANSCOM will also consider a shorter depreciation cycle supported by carrier’s actual accounting system. USTRANSCOM will apply economic life standards for rotables at 10 years and zero percent residual.
3. UTILIZATION. The carrier’s system average aircraft utilization by aircraft type as reflected on Schedule B-1, “All Services” of the request for cost data package, will be used to compute unit costs per plane mile for fixed costs and investment. USTRANSCOM will also accept utilization in USTRANSCOM service if the carrier provides support for USTRANSCOM utilization. Any carrier proposing USTRANSCOM utilization versus system utilization will be required to provide documentation on how utilization is tracked, to include the carrier’s methodology for allocating down time to various customers. Carriers proposing utilization in
USTRANSCOM service which is accepted in the rate due to sufficient supporting documentation will be required to consistently propose and support utilization derived from USTRANSCOM service from the year it is proposed to the end of the MOU period. Where applicable, the traffic data shown on Schedule B-1 must coincide with those statistics reported on Form 41 reports and monthly USTRANSCOM worksheets for round-trips and one-ways. In the event a carrier’s average system utilization for a particular aircraft type is below the lower limit of 5 hours per day, then the minimum limit of 5 hours shall apply for ratemaking purposes.
4. WEIGHTING OF RATE. Forecast rates will be weighted on current fiscal year dollars plus prior fiscal year dollars of the aircraft included in the participation threshold defined in paragraph
5.
5. PARTICIPATION. Carriers participating in the USTRANSCOM forecast year business shall provide cost and pricing data for USTRANSCOM rate reviews. However, carriers may submit cost and pricing data under any circumstances.
Data is required for carriers with revenues equating to five percent (5%) or greater of the class weighting (Large, Medium, Small) for one aircraft type (i.e., B-747-400, MD11, etc.) in charter passenger or cargo service. USTRANSCOM/TCAQ-C’s COINS database will be used to determine carrier business level as of 30 days after the close of the base period. For example, Fiscal Year 2016 rate review participation was determined by fiscal year-to-date dollar levels as of 31 July 2014.
USTRANSCOM will allow 60 days for carriers to prepare data, and USTRANSCOM will not make this request until 30 days after the close of the base period for which data is being requested. For each day the cost package is late (for determination of lateness, the provisions of the solicitation which deals with late receipt of offers will be used), the carriers’ entitlement will be reduced by one percentage point per day up to a maximum of 30 percent for forecast year business. Where a carrier is a passive member of a teaming arrangement and not providing air transportation services for USTRANSCOM, they will not be required to provide cost and pricing data. For active members of a teaming arrangement providing air transportation service for
USTRANSCOM, cost and pricing data will be required when the above conditions are met.
6. BIENNIAL COST ESCALATION. A general cost escalation factor will be computed each year using a weighted factor comprised of the following indices (all rounded to the nearest tenth of a percentage point).
GENERAL:
In order to protect the Contractor and the Government against significant market fluctuations, the
Uniform Rate shall be adjusted by escalation of the prior year’s rates vs. a full cost package submission at the start of the second year of each contract period of performance (i.e. 1 Oct 2019 of the Base Period, 1 Oct 2021 of Option Period 1 (if exercised), and 1 Oct 2023 of Option
Period 2 (if exercised). In order to eliminate potential gaps in cost information, cost packages shall be prepared using at least 24 months of data as depicted in the following table:
FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
Methodology Cost
Package Escalation
Cost
Package Escalation
Cost
Package Escalation
Cost
Package
Base Period
Jul 2016 –
Jun 2017 N/A
Jul 2017 –
Sep 2019* N/A
Oct 2019 –
Sep 2021 N/A
* In an effort to compress the time lapse between the Cost Package Base Period and the establishment of the Uniform Rates, the parties will review the cost package process (e.g.
auditing process, condensing timelines, etc.) for possible efficiencies with the goal of sliding the
Base Periods to the right by an additional three months.
On the escalation years, if the adjustment varies by more than 0%, categories other than fuel and labor will receive a general escalation adjustment ranging from -1% (lower) and 4% (upper) based on indices agreed between the parties from time to time. Initially, the adjustment shall be based on the GII Pricing and Purchasing Industry Forecasting for North American Industrial
Classification System (NAICS) 481112, Scheduled Freight Air Transportation (70%) and
Airlines for America (A4A) Passenger Airline Cost Index (PACI) (30%). Annual fuel and labor escalations will not be subject to this range band.
SPECIFIC APPROACH:
1. Cost packages were submitted for development of the Uniform Rates for Base Period year 1. The rate development for Base Period year 2 will be calculated by escalating year 1 cost data by 12-months. This process will repeat for Option Period 1 and
Option Period 2. Updates will only be applicable to the following escalation categories and will be applied to costs currently established in the CRAF Ratemaking process:
- General Cost Escalation shall be applied to the following elements of cost:
o Direct Variable
Non-labor cost elements of Crew
Oil and Aircraft Supplies
Non-labor cost elements of Aircraft Maintenance o Direct Fixed
Miscellaneous o Indirect:
Maintenance - General Ground Property
Aircraft & Traffic Servicing
Non-labor cost elements of Passenger Service
- Labor (Crew, Maintenance, and Flight Attendants) Escalation and FICA escalation shall be applied to the following elements of cost o Direct Variable
Labor cost for Crew
Labor cost for Maintenance o Indirect
Passenger Service - Labor cost for Flight Attendants
- The Margin or Profit calculations will be applied in accordance with the
Weighted Guidelines Method based on the updated and revised costs for the
Base and Option Periods Year 2.
2. General Cost & FICA Escalation: As stated in the Instructions For Uniform Rates
And Rules Cost Package For International Service, once historical costs have been allocated between commercial and USTRANSCOM services, USTRANSCOM costs shall be adjusted for cost level changes. The Cost Package auto-populates to incorporate the 27-month general escalation and FICA escalation provided on the
Cost Package’s cover page. The 27-month general escalation and FICA escalation will be utilized for fiscal years in which the rate is developed, year one of Base Period
1. In year two of Base Period 1, in which escalation will be applied, a 12-month general escalation and FICA escalation will be combined to the previous year’s 27-month escalation for a total 39-month escalation.
6.1 CARRIER COST ESCALATION – Labor (Crew, Maintenance, and Flight Attendants)
Escalation: Carriers shall propose an escalation rate (percentage) in order to adjust for cost level changes imposed by labor contracts. Recommended change shall be based on actual labor cost increases, such as those in the applicable CBA. If a labor contract has expired and is no longer in effect, the carrier must provide sufficient documentation and data to support its proposed labor escalation. Failure to support and adequately defend proposed labor escalation may result in the application of general escalation or no escalation if DoT Form 41 data does not support labor escalation. Labor adjustments may be requested annually for claims of past incurred cost in excess to the general escalation. Any proposed adjustment must include sufficient supporting documentation (e.g. new and old CBAs) in order calculate actual net costs to the carriers in excess to general escalation.
Index figure subsequently revised by GII or A4A (e.g. amending formerly released indices by removing or replacing components within the index, describing revisions by footnote or appendix, significantly altering the method of calculating the index, or any other method) shall not warrant a retroactive price adjustment under the terms and conditions of the contract. All updates to each escalation category will be performed on an annual basis that is requested by the Government in the development of the next fiscal year’s Uniform Rate.
In the event publication for the above index is discontinued, the parties shall agree upon an appropriate substitute index.
The GII and A4A index takes into account the following categories in determining the General
Cost Escalation:
GII - Scheduled Freight Air Transportation (70%)
PPI 481112
Input Costs
Direct Materials
Other Support Activities For Air Transport (70.78%)
Supplies for Manufacturing Industries (18.40%)
Indirect Costs
All Items, All Urban (0.68%)
Aerospace Product and Parts (10.14%)
Adjusted to remove costs not associated with a government charter operation or otherwise accounted for elsewhere: service labor costs, and jet fuels.
A4A (30%)
PACI
Input Costs
Aircraft Rents & Ownership (16.83%)
Professional Services (19.77%)
Food & Beverage (3.84%)
Landing Fees (4.42%)
Maintenance Material (3.82%)
Aircraft Insurance (0.12%)
Non-Aircraft Insurance (0.24%)
Communication (1.69%)
Utilities & Office Supplies (1.57%)
Transport-Related Expenses (28.06%)
Other Operating Expenses (19.64%)
Adjusted to remove costs not associated with a government charter operation or otherwise accounted for elsewhere: passenger commissions, labor, fuel, interest, advertising, & promotions, and terminal rent.
File details come from the government source that posted it. Updated .