Amendment 2_Attachment 2 Performance Work Statement (PWS).pdf

PDF 161 KB Posted

Attached to
Medical-Grade Reverse Osmosis (RO) Water Purification Systems Preventative / Wright Patterson AFB
Solicitation number
HT940726QE003
Issued by

About this file

This is a Performance Work Statement (PWS) for preventative maintenance services on medical-grade Reverse Osmosis (RO) water purification systems at the 88th Medical Group at Wright-Patterson AFB, Ohio. The contract covers four RO systems: two main units (US Water Systems Defender HD Multi-use for Central Sterile and Mar Cor Purification RO for Hemodialysis) and two portable AmeriWater Centurion units for Hemodialysis. Services are required Monday through Friday, excluding 13 designated federal holidays, with performance at 4881 Sugar Maple Dr, Rooms BR19 & 3D04.

The base contract period runs from July 31, 2026 through July 30, 2027, with four option years extending through July 30, 2031. Key maintenance tasks include an initial system assessment within 30 days, sanitization and cleaning at specified intervals (nightly heat-disinfection and weekly chemical sanitization for Mar Cor; quarterly for Defender; semi-annual for portable units), annual UV bulb replacement and UV intensity meter calibration, and bi-annual product water trace elemental analyses to verify compliance with AAMI medical-grade specifications. The contractor must provide all routine consumables including water softening salt, supply new standard parts with 90-day minimum warranties, and perform system monitoring via audible and visual alarms. Contractor personnel must be technically qualified, possess demonstrated corporate experience maintaining healthcare-facility RO systems under AAMI standards, maintain OEM warranties and software licensing compliance, wear identification badges, and adhere strictly to AAMI standards for all maintenance, sanitation, and water quality testing.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Defense Defense Health Agency

Performance Work Statement

Medical-Grade Reverse Osmosis (RO) Water Purification Systems Preventative

Maintenance Services

88th Medical Group at Wright-Patterson AFB, OH

31 July 2026

Part 1: General Information

1.1. Introduction & Background: This is a non-personal services contract to provide comprehensive preventative maintenance for the Reverse Osmosis (RO) water purification systems at the Wright-Patterson AFB Medical Treatment Facility. This effort includes all tasks and activities necessary to provide water purification equipment support services.

1.2. Scope of Work: The contractor shall provide preventative maintenance on two (2) main and two (2) portable Reverse Osmosis (RO) systems. These systems produce medical-grade water utilized directly in the Hemodialysis Clinic and the Sterile Processing Department (SPD), requiring strict adherence to healthcare water quality standards.

• Central Sterile RO (Main): Make: US Water Systems | Model: Defender HD Multi-use | SN: None

• Hemodialysis RO (Main): Make: Mar Cor Purification | Model:

RO,CWP,13LPM,101 | SN: 1379351

• Hemodialysis Mobile RO (Portable): Make: AmeriWater | Model: Centurion |

SN: CEN190004

• Hemodialysis Mobile RO (Portable): Make: AmeriWater | Model: Centurion |

SN: CEN190011

Key systems include UV Disinfection Systems, Filtration Components, and the core RO Systems located in the Hemodialysis Clinic and Sterile Processing Department. The contractor shall ensure the operational integrity of the equipment in accordance with this

PWS.

1.3. Period of Performance

• Base Year: 31 July 2026 to 30 July 2027

• Option Year 1: 31 July 2027 – 30 July 2028

• Option Year 2: 31 July 2028 – 30 July 2029

• Option Year 3: 31 July 2029 – 30 July 2030

• Option Year 4: 31 July 2030 – 30 July 2031

1.4. Place of Performance: 4881 Sugar Maple Dr, Rooms BR19 & 3D04 Wright- Patterson AFB, Ohio 45433

1.5. Hours of Operation: The contractor shall conduct business Monday through Friday, except for federal holidays. The contractor must maintain an adequate workforce for the uninterrupted performance of all tasks during standard operating hours.

1.6 Federal Holidays: Contractor services are not required on the following Federal holidays.

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth National Independence Day

Independence Day

Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

Part 2: Specific Tasks

2.1. Initial System Assessment

• Within thirty (30) calendar days of the start of on-site contract work, the contractor shall conduct a complete assessment and inspection of all RO equipment and systems included under this contract to establish a baseline of system health.

2.2. Sanitization and Cleaning: The contractor shall perform comprehensive system and loop sanitization on all four (4) Reverse Osmosis (RO) systems in accordance with the manufacturer's specified intervals and hospital safety standards. The required frequencies are as follows:

• The Mar Cor system loop shall be heat-disinfected nightly and chemically sanitized weekly.

• The Central Sterile (Defender) RO shall be cleaned and sanitized every three (3) months, according to the certified installer's recommendation.

• The portable AmeriWater Centurion units shall be chemically sanitized every six

(6) months.

2.3. Annual Requirements

UV Bulb Replacement:

• Replacement of UV disinfection bulbs (for the Pulsar UV system on the Defender HD and the UV systems on the Mar Cor/AmeriWater units).

• Annual system-wide calibration and verification of UV intensity meters.

2.4. Bi-Annual Requirements

Complete two (2) product water trace elemental analyses per year. The analysis must verify that the water quality meets or exceeds AAMI medical-grade specifications for patient care.2.6. General Maintenance & Consumables,

• System Monitoring: Monitor the system via audible and visual alarms to detect any malfunctioning status during scheduled maintenance.

• Preventative Services: Contractor technicians are responsible for routine preventative maintenance, including flushing and system disinfection, using appropriate infection control procedures to prevent cross-contamination.

• Consumables & Parts: The contractor shall provide all routine consumables required for operation, including salt required for water softening. All repair parts and replacements for the RO products/components utilized during preventative maintenance shall match existing materials and fixtures, and be new, standard parts with at least a 90-day warranty.

• Liability: The contractor is not liable for repairs resulting from catastrophic accidents, neglect, misuse, or facility-related failures (e.g., electrical power, humidity control) not caused by the contractor.

Part 3: Contractor Qualifications & Standards

3.1. Technical Qualifications

• All services must be performed by technically qualified and authorized service personnel.

• Personnel must have experience performing scheduled preventative maintenance and demonstrate a thorough knowledge of the system hardware.

3.2. Company Qualifications

Any qualified company capable of maintaining the systems listed in Section 1.2 may bid on this service contract, provided they meet the following minimum qualifications:

• Medical-Grade Experience: The company and its service personnel must possess demonstrated corporate experience maintaining medical-grade or healthcare-facility Reverse Osmosis systems, specifically those operating under AAMI (Association for the Advancement of Medical Instrumentation) standards.

• Warranty Preservation: All software licensing, warranties, and service must be provided and maintained in strict accordance with Original Equipment Manufacturer (OEM) terms and conditions to avoid voiding any existing warranties on the equipment.

3.3. Contractor Identification

Contractor personnel must possess and wear an identification badge displaying their name and company. They must ensure all Government personnel understand they are contractor support personnel in all interactions.

3.4. Applicable Standards

All maintenance, sanitation, and water quality testing shall be performed in strict accordance with the Association for the Advancement of Medical Instrumentation (AAMI) standards for water treatment equipment used in hemodialysis and medical device reprocessing.

Part 1: General Information
Part 2: Specific Tasks
Part 3: Contractor Qualifications & Standards

File details come from the government source that posted it. Updated .