Attachment 2 PWS.pdf
PDF 162 KB Posted
- Attached to
- Medical-Grade Reverse Osmosis (RO) Water Purification Systems Preventative / Wright Patterson AFB
- Solicitation number
- HT940726QE003
- Issued by
-
Defense Health Agency
About this file
This is a Performance Work Statement (PWS) for preventative maintenance services of medical-grade Reverse Osmosis (RO) water purification systems at the 88th Medical Group at Wright-Patterson Air Force Base, Ohio.
The contractor shall provide comprehensive preventative maintenance on four RO systems: two main systems (US Water Systems Defender HD for Central Sterile and Mar Cor Purification RO for Hemodialysis) and two portable AmeriWater Centurion systems for Hemodialysis mobile use. The systems produce medical-grade water for the Hemodialysis Clinic and Sterile Processing Department and must comply with strict AAMI (Association for the Advancement of Medical Instrumentation) healthcare water quality standards. The contract period begins July 31, 2026, through July 30, 2027 (base year), with four optional one-year extensions through July 30, 2031. Work is performed at 4881 Sugar Maple Drive, Rooms BR19 & 3D04, Wright-Patterson AFB, Ohio 45433, Monday through Friday excluding federal holidays during standard operating hours.
Maintenance requirements include an initial system assessment within 30 days; monthly visual inspections, flow rate verification, and comprehensive sanitation per AAMI standards; quarterly inlet filter replacement; annual UV bulb replacement with intensity verification and endotoxin/carbon filter replacement; and bi-annual product water trace elemental analyses. The contractor must provide all routine consumables (including salt for water softening), repair parts with minimum 90-day warranties, and system monitoring via audible and visual alarms. The contractor is responsible for infection control procedures and is not liable for repairs from catastrophic accidents, neglect, misuse, or facility-related failures. Contractors must be technically qualified with demonstrated corporate experience maintaining medical-grade RO systems under AAMI standards, maintain OEM warranties and software licensing compliance, and personnel must wear identification badges clearly identifying themselves as contractor support personnel.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Defense Defense Health Agency
Performance Work Statement
Medical-Grade Reverse Osmosis (RO) Water Purification Systems Preventative
Maintenance Services
88th Medical Group at Wright-Patterson AFB, OH
31 July 2026
Part 1: General Information
1.1. Introduction & Background: This is a non-personal services contract to provide comprehensive preventative maintenance for the Reverse Osmosis (RO) water purification systems at the Wright-Patterson AFB Medical Treatment Facility. This effort includes all tasks and activities necessary to provide water purification equipment support services.
1.2. Scope of Work: The contractor shall provide preventative maintenance on two (2) main and two (2) portable Reverse Osmosis (RO) systems. These systems produce medical-grade water utilized directly in the Hemodialysis Clinic and the Sterile Processing Department (SPD), requiring strict adherence to healthcare water quality standards.
• Central Sterile RO (Main): Make: US Water Systems | Model: Defender HD Multi-use | SN: None
• Hemodialysis RO (Main): Make: Mar Cor Purification | Model:
RO,CWP,13LPM,101 | SN: 1379351
• Hemodialysis Mobile RO (Portable): Make: AmeriWater | Model: Centurion |
SN: CEN190004
• Hemodialysis Mobile RO (Portable): Make: AmeriWater | Model: Centurion |
SN: CEN190011
Key systems include UV Disinfection Systems, Filtration Components, and the core RO Systems located in the Hemodialysis Clinic and Sterile Processing Department. The contractor shall ensure the operational integrity of the equipment in accordance with this
PWS.
1.3. Period of Performance
• Base Year: 31 July 2026 to 30 July 2027
• Option Year 1: 31 July 2027 – 30 July 2028
• Option Year 2: 31 July 2028 – 30 July 2029
• Option Year 3: 31 July 2029 – 30 July 2030
• Option Year 4: 31 July 2030 – 30 July 2031
1.4. Place of Performance: 4881 Sugar Maple Dr, Rooms BR19 & 3D04 Wright- Patterson AFB, Ohio 45433
1.5. Hours of Operation: The contractor shall conduct business Monday through Friday, except for federal holidays. The contractor must maintain an adequate workforce for the uninterrupted performance of all tasks during standard operating hours.
1.6 Federal Holidays: Contractor services are not required on the following Federal holidays.
New Year’s Day Birthday of Martin Luther King, Jr.
Washington’s Birthday Memorial Day Juneteenth National Independence Day
Independence Day
Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
Part 2: Specific Tasks
2.1. Initial System Assessment
• Within thirty (30) calendar days of the start of on-site contract work, the contractor shall conduct a complete assessment and inspection of all RO equipment and systems included under this contract to establish a baseline of system health.
2.2. Monthly Requirements
• Visual Inspection: Visually inspect RO membranes for any signs of fouling, scaling, or damage.
• Flow Rate Verification: Check and verify that the flow rate within the RO system is within specified operating parameters.
• Comprehensive Monthly Sanitation: In accordance with AAMI standards, perform a full preventative sanitation of the entire water purification system, to include the RO membranes, storage tank, and the distribution loop/piping. The process must be followed by a complete freshwater rinse to ensure system readiness
2.3. Quarterly Requirements
• Inlet Filter Replacement: Replace the Twin System Inlet Filters and the main RO System Inlet Filter.
2.4. Annual Requirements
UV Bulb Replacement:
• Change the UV bulb in the Recirculation Line UV Disinfection System.
• Change the UV bulb in the Main Supply Line UV Disinfection System.
• Verify UV intensity to confirm proper disinfection performance after bulb replacement.
Filter Replacement: Replace the Endotoxin Filter and the Carbon Filters.
2.5. Bi-Annual Requirements
Complete two (2) product water trace elemental analyses per year. The analysis must verify that the water quality meets or exceeds AAMI medical-grade specifications for patient care.2.6. General Maintenance & Consumables,
• System Monitoring: Monitor the system via audible and visual alarms to detect any malfunctioning status during scheduled maintenance.
• Preventative Services: Contractor technicians are responsible for routine preventative maintenance, including flushing and system disinfection, using appropriate infection control procedures to prevent cross-contamination.
• Consumables & Parts: The contractor shall provide all routine consumables required for operation, including salt required for water softening. All repair parts and replacements for the RO products/components utilized during preventative maintenance shall match existing materials and fixtures, and be new, standard parts with at least a 90-day warranty.
• Liability: The contractor is not liable for repairs resulting from catastrophic accidents, neglect, misuse, or facility-related failures (e.g., electrical power, humidity control) not caused by the contractor.
Part 3: Contractor Qualifications & Standards
3.1. Technical Qualifications
• All services must be performed by technically qualified and authorized service personnel.
• Personnel must have experience performing scheduled preventative maintenance and demonstrate a thorough knowledge of the system hardware.
3.2. Company Qualifications
Any qualified company capable of maintaining the systems listed in Section 1.2 may bid on this service contract, provided they meet the following minimum qualifications:
• Medical-Grade Experience: The company and its service personnel must possess demonstrated corporate experience maintaining medical-grade or healthcare-facility Reverse Osmosis systems, specifically those operating under AAMI (Association for the Advancement of Medical Instrumentation) standards.
• Warranty Preservation: All software licensing, warranties, and service must be provided and maintained in strict accordance with Original Equipment Manufacturer (OEM) terms and conditions to avoid voiding any existing warranties on the equipment.
3.3. Contractor Identification
Contractor personnel must possess and wear an identification badge displaying their name and company. They must ensure all Government personnel understand they are contractor support personnel in all interactions.
3.4. Applicable Standards
All maintenance, sanitation, and water quality testing shall be performed in strict accordance with the Association for the Advancement of Medical Instrumentation (AAMI) standards for water treatment equipment used in hemodialysis and medical device reprocessing.
| Part 1: General Information |
| Part 2: Specific Tasks |
| Part 3: Contractor Qualifications & Standards |
File details come from the government source that posted it. Updated .