DID_OAPM-ILS-007b_TSE_Maintenance_Data_Reports.doc
DOC document 49 KB Posted
- Attached to
- Transportation Security Equipment Data Analysis and Maintenance Database Federal contract opportunity
- Solicitation number
- HSTS04-17-R-CT3017
About this file
updated DID 007b
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
| 1. TITLE |
| 2. IDENTIFICATION NUMBER |
| TSE Maintenance Data Reports |
| OAPM-ILS-007b |
3. DESCRIPTION/PURPOSE
3. 1 The TSE Maintenance Data Reports support the OAPM, other TSA, and U.S. Government offices.
3.2 This Data Item Description (DID) provides the format and content for the data product generated by the specific and discrete task requirements as delineated in the contract.
| 4. APPROVAL DATE (YYMMDD) |
| 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) |
| 6a. DTC APPLICABLE |
| 6b. GIDEP APPLICABLE |
OAPM
7. APPLICATION/INTERRELATIONSHIP
7.1 The TSE Maintenance Data Reports are closely related to and is harmonious with the TSE Data Analysis Plan (TDAP).
| 8. APPROVAL LIMITATION |
| 9a. REFERENCES |
| 9b. AMSC NUMBER |
10. PREPARATION INSTRUCTIONS
10.1 GENERAL. The Maintenance Data Reports supports the data requests from OAPM, other TSA and U.S. Government offices. These reports are either monthly, quarterly, or annual reports. The contractors shall utilize Attachment 2 TSE Metrics Terms and Definitions & Reliability, Maintainability, and Availability (RMA) Metrics to accurately calculate the performance metrics.
10.2 CONTENT. The contractor shall generate the reports using the raw TSE maintenance data. Most of the reports are combinations of performance metrics either by technology, by airport, by models, and/or by region. Below are some of the current reports that are generated. This list is not complete and is subject to change by Government at any time. The reports can be in contractor’s format approved the Government. Government will provide specific guidelines for each report.
a.
PSP and EBSP quarterly ranking report b.
Measure of Effectiveness (MOE) report c.
Region 7 reports d.
DIVE tool data
e. Area Based Metrics data
f. Monthly RMA data
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
File details come from the government source that posted it. Updated .