DID_OAPM-ILS-001_TDAP.DOC

DOC document 60 KB Posted

Attached to
Transportation Security Equipment Data Analysis and Maintenance Database Federal contract opportunity
Solicitation number
HSTS04-17-R-CT3017
Issued by
Department of Homeland Security Transportation Security Administration

About this file

updated DID 001 - TDAP

View the file

Other files for this federal contract opportunity

Other files attached to Transportation Security Equipment Data Analysis and Maintenance Database, newest first.
File Type Posted
TSEMD_Solicitation_HSTS04-17-R-CT3017_Amendment_001_(conformed).docx DOCX document
TSEMD_Solicitation_HSTS04-17-R-CT3017_Amendment_001_(redline).docx DOCX document
CDRL_A010_Program_Management_Plan.doc DOC document
DID_OAPM-ILS-007a_TSE_Monthly_Performance_Metrics_Validation.doc DOC document
DID_OAPM-ILS-007b_TSE_Maintenance_Data_Reports.doc DOC document
DID_OAPM-ILS-010_PMP.DOC DOC document
TSEMD_Questions_and_Responses.docx DOCX document
Attachment_A_-_TSE_Maintenance_Database_revised.xlsx XLSX spreadsheet
DID_OAPM-ILS-009_TSE_Database_BI_Tool_Plan.doc DOC document
DID_OAPM-ILS-008_TSE_Maintenance_Data_Ad_Hoc_Reports.doc DOC document
Attachment_A_RMA_Calculation_Assessment_Questions.docx DOCX document
HSTS04-17-R-CT3014_ILS_RFP_SF_1449.pdf PDF
Attachment_A_-_TSE_Maintenance_Database.xlsx XLSX spreadsheet
Attch_C,_PP_Questionnaire.docx DOCX document
Attch_D,_Price_Template.xls XLS spreadsheet
HSTS04-17-R-CT3014_CDRLs_and_DID.zip ZIP file
Attachment_A.docx DOCX document
TSEMD_Solicitation_HSTS04-17-R-CT3017.docx DOCX document
Attch_B,_PP_Data.docx DOCX document
Attachment_2_-_TSE_Metrics_Terms_and_Definitions_and_RMA_Metrics_072017_v5.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

1. TITLE
2. IDENTIFICATION NUMBER
TSE Data Analysis Plan
OAPM-ILS-001

3. DESCRIPTION/PURPOSE

3.1 The TSE Data Analysis Plan (TDAP) describes the plans and procedures that will be employed to accomplish the contract TSE Maintenance Data Analysis Program. The TDAP describes plans, activities and schedules necessary to accomplish contract tasks and meet contract requirements.

4. APPROVAL DATE (YYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
6a. DTC APPLICABLE
6b. GIDEP APPLICABLE

OAPM

7. APPLICATION/INTERRELATIONSHIP

7.1 This Data Item Description (DID) provides the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.

7.2 The MDAP Plan is closely related to and must be harmonious with other program plans such as the TSE Maintenance Database and BI Tool Development Plan.

8. APPROVAL LIMITATION
9a. REFERENCES
9b. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

10.1 FORMAT. Contractor format is acceptable.

10.2 CONTENT. The TDAP consists of the following sections:

a. Introduction

b. TDAP Organization, Implementation, and Execution

c. TDAP Functions

10.2.1 Introduction. This section summarizes the TDAP support architecture, presents an overview of the schedule, and describes how the TDAP will be monitored and updated to remain current.

10.2.2 TDAP Organization, Implementation, and Execution.

a. Contractor's Organizational Structure. Describe the organizational structure that will be used to accomplish the contract TDAP effort.

b. Subcontractor and Vendor Interface Management. List the subcontractors involved in the TDAP program and describe the scope of the work assigned to each, the method of controlling the accomplishment of this work, and the organizational interfaces established with each subcontractor. Include a general description of the method of specifying TDAP requirements and controlling the accomplishment of specific work and deliverables.

10.2.3 TDAP Functions.

10.2.3.1 TSE Maintenance Data Analysis Program Planning and Management.

a. Describe the Contractor’s approach and methodology employed to identify, control, and manage contract requirements. Describe the established, in-place elements available to perform contract tasks, as well as what needs to be established or supplemented and the schedule to complete it.

DATA ITEM DESCRIPTION

OAPM-ILS-001

10. PREPARATION INSTRUCTIONS (CONTINUED)

b. Describe internal and external interfaces and processes to collect customer feedback, document lessons learned, and implement process improvements.

10.2.3.2 Maintenance Data Analysis Program Procedures

a. Describe the Contractor’s approach and methodology employed to evaluate the procedures and assumptions used by the Maintenance Service Providers (MSP)s to calculate performance metrics calculations, and confirm whether the assumptions used by the MSP meet contract requirements and maintenance data can be accurately audited.

b. Describe the Contractor’s approach and methodology employed to generate ad hoc reports; and analyze TSE maintenance data to identify trends and perform additional analysis on specific equipment subsystems.

c. Describe the Contractor’s approach and methodology employed to store and retain accumulated raw maintenance data submitted by all MSP/OEMs for analysis and reporting

10.2.3.3 Manpower, Personnel and Training. Describe training and certification requirements, and the approach for initial and refresher training. All Contractor personnel must complete Government required training within the following periodicity and report completion.

a. SSI training – annual

b. OLC training – as required by OLC for white packages

c. Other as directed by the CO

11. DISTRIBUTION STATEMENT

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

File details come from the government source that posted it. Updated .