Attachment B - Self-Certification Matrix.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Credential Authentication Technology (CAT)
- Solicitation number
- HSTS04-14-R-ST4000
About this file
Self-Certification Matrix
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CAT Self-Certification Matrix | ||
| Key Requirements | Requirement Language | Substantiation Level |
Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Meets Requirement?
(Y/N/E)
| 1 | Detection capabilities must go beyond evaluating the magnetic stripe/barcode on the ID | B | |
| 2 | Develop the CAT solution in 120 calendar days or less. | B | |
| 3 | The CAT unit must be a fixed location unit (like a Kiosk), not a handheld. | A | LEGEND: |
A = Contractor certification of compliance (substantiation not required) B = Contractor certification of compliance (substantiation required) NA = Not Applicable to this procurement E = Exceeds quantitative requirement/SPC (substantiation required)
| 4 | The CAT unit must use Windows 7 Professional. | A |
| IT Security | Requirement Language | Substantiation Level |
Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Meets Requirement?
(Y/N)
| 1 | Adherance to the requirements set forth in 13.1 IT Security | A |
| Shall /SPC # | Section Number | Substantiation Level |
Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Meets Requirement?
(Y/N/E)
| Shall 1 | 3.1.1 | B |
| Shall 2 | 3.1.1 | B |
| Shall 3 | 3.1.1 | B |
| Shall 4 | 3.1.1 | B |
| Shall 5 | 3.1.1 | A |
| Shall 6 | 3.1.2 | A |
| Shall 7 | 3.1.2 | A |
| Shall 8 | 3.1.2 | A |
| Shall 9 | 3.1.2 | A |
| Shall 10 | 3.1.2 | A |
| Shall 11 | 3.1.2 | A |
| SPC 1 | 3.1.3.1 | B |
| SPC 2 | 3.1.3.2 | B |
| SPC 3 | 3.1.3.2 | A |
| SPC 4 | 3.1.3.2 | A |
| SPC 5 | 3.1.3.2 | A |
| SPC 6 | 3.1.3.2 | NA |
| Shall 12 | 3.1.3.3 | A |
| SPC 7 | 3.1.3.3 | B |
| SPC 8 | 3.1.3.3 | B |
| SPC 9 | 3.1.3.3 | A |
| SPC 10 | 3.1.3.3 | B |
| SPC 11 | 3.1.3.3 | A |
| Shall 13 | 3.1.3.4 | A |
| Shall 14 | 3.1.3.5 | A |
| Shall 15 | 3.1.3.5 | A |
| Shall 16 | 3.1.3.5 | A |
| Shall 17 | 3.1.3.5 | A |
| Shall 18 | 3.1.3.5 | A |
| Shall 19 | 3.2.1.1 | B |
| Shall 20 | 3.2.1.2 | A |
| SPC 12 | 3.2.1.2 | A |
| Shall 21 | 3.2.2.1 | B |
| SPC 13 | 3.2.2.1 | A |
| SPC 14 | 3.2.2.1 | A |
| Shall 22 | 3.2.3.1 | B |
| Shall 23 | 3.3.1 | A |
| Shall 24 | 3.3.2 | A |
| SPC 15 | 3.3.3 | A |
| SPC 16 | 3.3.4.1 | A |
| Shall 25 | 3.3.4.2 | A |
| Shall 26 | 3.3.4.2 | A |
| Shall 27 | 3.3.4.2 | A |
| Shall 28 | 3.3.4.2 | A |
| Shall 29 | 3.3.4.2 | A |
| Shall 30 | 3.3.4.2 | A |
| Shall 31 | 3.3.4.2 | A |
| Shall 32 | 3.3.4.2 | A |
| Shall 33 | 3.3.4.2 | A |
| Shall 34 | 3.3.4.2 | A |
| Shall 35 | 3.3.4.2.1 | A |
| Shall 36 | 3.3.4.2.1 | A |
| Shall 37 | 3.3.4.2.1 | A |
| Shall 38 | 3.3.4.2.1 | A |
| Shall 39 | 3.3.4.2.1 | A |
| Shall 40 | 3.3.4.2.1 | A |
| SPC 17 | 3.3.4.2.1 | A |
| Shall 41 | 3.3.4.2.1 | A |
| Shall 42 | 3.3.4.2.1 | A |
| Shall 43 | 3.3.4.2.1 | A |
| Shall 44 | 3.3.4.2.2 | A |
| Shall 45 | 3.3.4.2.2 | A |
| Shall 46 | 3.3.4.2.2 | A |
| Shall 47 | 3.3.4.3 | A |
| Shall 48 | 3.3.4.3 | A |
| SPC 18 | 3.3.4.3 | A |
| SPC 19 | 3.3.4.3 | A |
| SPC 20 | 3.3.4.3 | A |
| SPC 21 | 3.3.4.3 | A |
| SPC 22 | 3.3.4.3 | A |
| SPC 23 | 3.3.4.3 | A |
| SPC 24 | 3.3.4.3 | A |
| Shall 49 | 3.3.5.1 | A |
| Shall 50 | 3.3.5.2 | A |
| Shall 51 | 3.3.5.2 | A |
| Shall 52 | 3.3.5.2 | A |
| Shall 53 | 3.3.5.3 | A |
| Shall 54 | 3.3.5.3 | A |
| Shall 55 | 3.3.5.3 | A |
| Shall 56 | 3.3.5.3 | A |
| Shall 57 | 3.3.5.3 | A |
| Shall 58 | 3.3.5.3 | A |
| Shall 59 | 3.3.5.4 | A |
| Shall 60 | 3.4.1 | A |
| SPC 25 | 3.4.2 | A |
| SPC 26 | 3.4.3 | A |
| SPC 27 | 3.4.3 | A |
| SPC 28 | 3.4.3 | A |
| SPC 29 | 3.4.3 | A |
| Shall 61 | 3.4.4 | B |
| SPC 30 | 3.5.1 | A |
| SPC 31 | 3.5.2 | A |
| Shall 62 | 3.5.3 | A |
| Shall 63 | 3.5.3 | A |
| Shall 64 | 3.5.4 | A |
| Shall 65 | 3.5.5 | A |
| Shall 66 | 3.5.5 | A |
| SPC 32 | B.1 | A |
| SPC 33 | B.1 | A |
| SPC 34 | B.1 | A |
| SPC 35 | B.1 | A |
| SPC 36 | B.1 | A |
| SPC 37 | B.2 | A |
| SPC 38 | B.2 | A |
| SPC 39 | B.2 | A |
| SPC 40 | B.2 | A |
| SPC 41 | B.2 | A |
| Battery and Charger SPC | Requirement Language | Substantiation Level |
Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Polly Hall: LEGEND:
A= Contractor certification of compliance (substantiation not required) B= Contractor certification of compliance (substantiation required) C=Independent/Accredited 3rd Party Certification of Complicance with Certification Meets Requirement?
(Y/N/E)
| Having the ability to operate continuously for at least 4 hours. | B |
| Having the ability to fully recharge the battery in less than the amount of time that it takes to deplete the battery using the battery charger. | A |
| The battery(ies) and the battery charger being non-proprietary and commercially available. | A |
| Designing the battery(ies) to allow for the 5th percentile female through the 95th percentile male (as defined in MIL-STD-1472G) to replace the batteries as needed for operation, without the need for tools. Consideration should be given to battery size and weight. | A |
| The battery charger having the capability of charging one or more batteries at once. | A |
| The battery charger operating on commercially available 120 Volts Alternating Current (VAC) power at 60 hertz (Hz) with up to ± 5% voltage tolerance and ± 3% frequency tolerance, at no more than 20 ampere service. | B |
| Designing of the battery or battery charger shall not expose operators, passengers, or maintenance personnel to hot surfaces over the appropriate temperatures listed in Table XXXI Temperature Exposure Limits in MIL-STD-1472G. | A |
File details come from the government source that posted it. Updated .