Prototype Milestones Prototype Unit Development Milestones
| Directions: Complete the proposed schedule for the indicated milestones for the CAT Prototype Unit in days after award of a Delivery Order | |
| CLIN 0001 - CAT Prototype Unit Milestone Schedule | |
| Milestone | Days After Award |
| Preliminary Design Review (PDR) | |
| Critical Design Review (CDR) | |
| Delivery of Prototype Unit for testing |
LRIP Delivery Capability Low Rate Initial Production Schedule
Directions: Complete the proposed schedule for delivery of the CAT LRIP-1 and LRIP-2 efforts as indicated by days after award of a Delivery Order
| LRIP-1 should demonstrate the proposed schedule to deliver 12 units for abbreviated testing, when 12 total units has been reached the remaining cells should be left blank |
| LRIP-2 should demonstrate the proposed schedule to deliver 11 units for full testing, when 11 total units has been reached the remaining cells should be left blank |
| LRIP-2 effort includes the CAT prototype unit to reach 12 total units for testing, but do not include the prototype in the schedule below |
| CLIN 0002A - Non-STIP CAT LRIP-1 | CLIN 0002 - CAT LRIP-2 | ||||
| Days After Award | Delivery Capability | ||||
| (# of Units) | Days After Award | Number of Units Delivered | |||
| 15 | 15 | ||||
| 30 | 30 | ||||
| 45 | 45 | ||||
| 60 | 60 | ||||
| 75 | 75 | ||||
| 90 | 90 | ||||
| Total Units | 0 | Total Units | 0 |
Full Rate Production Capability Full Rate Production Schedule
Directions: Complete the maximum production capability for delivery of the CAT Production and Non-STIP CAT Production Units as indicated by months after award of a Delivery Order
| The production schedules proposed below are per delivery order, it is assumed that maximum production capability is unaffected by the size of a given Delivery Order | |||
| CAT Production Units should demonstrate the proposed schedule to deliver a maximum of 2400 units, when 2400 total units is reached the remaining months should be left blank | |||
| Non-STIP CAT Production Units should demonstrate the proposed schedule to deliver a maximum of 500 units, when 500 total units is reached the remaining months should be left blank | |||
| CLIN 0003 - CAT Production Units | CLIN 0003A - Non-STIP CAT Production Units | ||
| Months After Award | Maximum Production Capability (# of Units) | Months After Award | Maximum Production Capability (# of Units) |
| 1 | 1 | ||
| 2 | 2 | ||
| 3 | 3 | ||
| 4 | 4 | ||
| 5 | 5 | ||
| 6 | 6 | ||
| 7 | 7 | ||
| 8 | 8 | ||
| 9 | 9 | ||
| 10 | 10 | ||
| 11 | 11 | ||
| 12 | 12 | ||
| 13 | Total Units | 0 | |
| 14 | |||
| 15 | |||
| 16 | |||
| 17 | |||
| 18 | |||
| 19 | |||
| 20 | |||
| 21 | |||
| 22 | |||
| 23 | |||
| 24 | |||
| Total Units | 0 |