Prototype Milestones Prototype Unit Development Milestones

Directions: Complete the proposed schedule for the indicated milestones for the CAT Prototype Unit in days after award of a Delivery Order
CLIN 0001 - CAT Prototype Unit Milestone Schedule
MilestoneDays After Award
Preliminary Design Review (PDR)
Critical Design Review (CDR)
Delivery of Prototype Unit for testing

LRIP Delivery Capability Low Rate Initial Production Schedule

Directions: Complete the proposed schedule for delivery of the CAT LRIP-1 and LRIP-2 efforts as indicated by days after award of a Delivery Order

LRIP-1 should demonstrate the proposed schedule to deliver 12 units for abbreviated testing, when 12 total units has been reached the remaining cells should be left blank
LRIP-2 should demonstrate the proposed schedule to deliver 11 units for full testing, when 11 total units has been reached the remaining cells should be left blank
LRIP-2 effort includes the CAT prototype unit to reach 12 total units for testing, but do not include the prototype in the schedule below
CLIN 0002A - Non-STIP CAT LRIP-1CLIN 0002 - CAT LRIP-2
Days After AwardDelivery Capability
(# of Units)Days After AwardNumber of Units Delivered
1515
3030
4545
6060
7575
9090
Total Units0Total Units0

Full Rate Production Capability Full Rate Production Schedule

Directions: Complete the maximum production capability for delivery of the CAT Production and Non-STIP CAT Production Units as indicated by months after award of a Delivery Order

The production schedules proposed below are per delivery order, it is assumed that maximum production capability is unaffected by the size of a given Delivery Order
CAT Production Units should demonstrate the proposed schedule to deliver a maximum of 2400 units, when 2400 total units is reached the remaining months should be left blank
Non-STIP CAT Production Units should demonstrate the proposed schedule to deliver a maximum of 500 units, when 500 total units is reached the remaining months should be left blank
CLIN 0003 - CAT Production UnitsCLIN 0003A - Non-STIP CAT Production Units
Months After AwardMaximum Production Capability (# of Units)Months After AwardMaximum Production Capability (# of Units)
11
22
33
44
55
66
77
88
99
1010
1111
1212
13Total Units0
14
15
16
17
18
19
20
21
22
23
24
Total Units0