Preproposal_Slides.pdf
PDF 1 MB Posted
- Solicitation number
- HSTS04-13-R-CT3025
About this file
Pre-Proposal Slide Presentation
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integrated Logistics Support (ILS)
Pre-Proposal Conference May 1, 2013
Agenda
• Welcome
• Purpose
• Proposal Requirements
• Proposal Reminders
• Clarifications to Questions
• Closing
Purpose
• Facilitate a clear understanding of the Request for Proposal (RFP) requirements
• Give potential Offerors an opportunity to obtain clarification about any aspect of the Request for Proposal
Proposal Requirements
Section E.2.7.1, Volume I: Technical Approach (150 page limit)
• Part 1: Technical Approach
• Tab 1 – Integrated Support Plan (CDRL A009)
• Tab 2 – TSA Service Response Center Plan (CDRL
A019)
• Part 2: Management Approach
• Tab 3 – Program Management Plan (CDRL A001)
Proposal Requirements
• Section E.2.7.2, Volume II: Price and Other Price Proposal Information (27 page limit)
• Tab 1 – Cover Page
• Certification hardcopy and electronic proposal are the same
• Acknowledgement of any Amendments
• Exceptions to RFP, if any
• Tab 2 – Past Performance
• Tab 3 – Socio Economic Considerations
• Tab 4 – Representations and Certifications
• Tab 5 – Price Proposal
• Attachment D: working excel spreadsheet
Proposal Reminders
• No company marketing pages
• Any pages that exceed the page limitations specified in the RFP will not be evaluated
• Do not include price specific data in Volume I of the proposal
• Submitted proposals shall be valid for 180 calendar days from the proposal due date
• Clarity and completeness
• Key points should be easily found, or may be presumed to be lacking
• Restatement of requirements is not responsive
Clarifications to Questions
Section E.2.7.2.5, Tab 5 – Price Proposal − Other than cost and pricing data provided for prices proposed in Attachment D (Price Evaluation Template) may be submitted in a separate Price Proposal Narrative.
CDRL A010, Quality Management Plan
− CDRL A010 title should be “Quality Management Plan” not “Quality Assurance Surveillance Plan”
Section E.2.7.1.2, Part 2 – Management Approach − Correct reference is Section C.7.1 of Part C; not C.7.11
Section C.8.11, TSA Service Response Center
− Single point of contact for all maintenance service requests
− Includes Checked Baggage maintenance tickets
Section E.2.8, Wage Determination Information − Occupation Classification Code (OCC) 23530
“Machinery Maintenance Mechanic” − Other OCCs should be proposed to TSA
Section E.3.3.1, Factor 4: Socio-Economic Considerations
− “Participating in DHS Mentor-Protégé Program shall be favorably considered during evaluation” - does not include other unaffiliated mentor-protégé programs
− Vendors interested in the DHS Mentor Protégé Program should contact Sharon Davis (202-447-0104;
sharon.davis@hq.dhs.gov)
Section C.4, Government Furnished Information − Maintenance manuals must be obtained from the system manufacturer; not provided by TSA − TSA does not own sufficient technical data packages to provide to vendors
Section B.3.5.10, Suitability Determination for Contract Employees
− contractor personnel have to complete suitability determination processing and required site access credentials before being permitted access TSE
Transition period - awardee will not be performing sustainment services
− Ramp up to full service by February 1, 2014
Proposals are due June 3, 2013 at 4pm Eastern Time − The e-mail copy will constitute the official copy for timely receipt (Section E.2.5.3 of RFP)
Deadline for questions is 9am Eastern Time May 8, 2013 − ILSTeamMail@tsa.dhs.gov mailto:ILSTeamMail@tsa.dhs.gov
Closing
• Anticipated Milestones:
− Deadline for Questions: May 8, 3013 − Proposals Due: June 3, 2013 − Exchanges with Offerors (as appropriate): August 2013 − Contract Award: September 2013
• This presentation, along with answers to other previously submitted questions not addressed herein, will be provided in an amendment on FBO
| Slide Number 1 |
| Agenda |
| Purpose |
| Proposal Requirements |
| Proposal Requirements |
| Proposal Reminders |
| Clarifications to Questions |
| Clarifications to Questions |
| Clarifications to Questions |
| Clarifications to Questions |
| Clarifications to Questions |
| Closing |
File details come from the government source that posted it. Updated .