Attch_2 _CDRL_A001-A022.pdf
PDF 583 KB Posted
- Solicitation number
- HSTS04-13-R-CT3025
About this file
Attachment 2 Contract Data Requirements Lists (CDRLs)
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of 1 A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A001
2. Title of Data Item
Program Management Plan
3. Subtitle
N/A
4. Authority
OSC-ILS-001
5. Contract Reference
PWS – C.7.1, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A See Block 14
9. Distribution Statement Required
A
10. Frequency
ONE/R
11. As of Date (AOD)
12. Date of First Submission
60 DAC See Block 14
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The Program Management Plan (PMP) shall be prepared in accordance with the referenced Data Item Description.
For requested information that is described in detail in other CDRL deliverables (Quality Management system, etc.), the appropriate paragraph in the PMP shall include sufficient detail to indicate a full understanding of the requirement.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 10 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 12 The initial PMP shall be submitted to the Government with the Contractor’s technical proposal (E.2.7.1, Volume 1: Technical Approach, of Part E).
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The PMP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the PWS. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
16. Total 2 G. Prepared By: H. Date I. Approved By J. Date
OSC 03/08/2013
17. Price Group 18. Estimated Total Price
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) A. Contract Line Item No. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions) QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award “N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion NLT No later than EOC End of contract EOM End of month EOQ End of quarter See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approval criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.).
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used. 18. Estimated Total Price. Not used.
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A002
2. Title of Data Item
Program Status Report
3. Subtitle
N/A
4. Authority
OSC-ILS-002
5. Contact Reference
PWS - C.7.2, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT N/A A MTHLY 0
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
10 DARP
15. Distribution
See Block 14
14. REMARKS:
Block 4 The Program Status Report (PSR) shall be prepared in accordance with the referenced Data Item Description.
Block 13 Monthly submissions delivered the 10th calendar day of each month. If the 10th falls on a non-workday, the submission is due the next Contractor work day.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The PSR shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
a. b. c. Final Copies
Addressee Copies Reg. Repro
CO
COR
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A003
2. Title of Data Item
Requirements Traceability Report
3. Subtitle
N/A
4. Authority
OSC-ILS-003
5. Contact Reference
PWS – C.7.2, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT N/A A Monthly 0
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
PMR or 10 DARP
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Requirements Traceability Report (RTR) shall be prepared in accordance with the referenced Data Item Description.
Block 13 Monthly submission as part of the monthly Program Management Review (PMR), with report delivered the 10th calendar day of the month if no PMR.
If the 10th falls on a non-workday, the submission is due the next Contractor work day.
Block 15 An electronic version of the submittal shall also be submitted on a secure, password-protected Web site. The RTR shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement (PWS). E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A004
2. Title of Data Item
Transportation Security Equipment Database
3. Subtitle
N/A
4. Authority
OSC-ILS-004
5. Contract Reference
C.7.5, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A MTHLY 0
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
5 DARP
15. Distribution
a. b. Draft c. Final Copies
The Transportation Security Equipment (TSE) Database shall be prepared in accordance with the referenced Data Item Description.
Block 13 Monthly submissions are due by the 5th caledar day of the month following the monthly reporting period. If the due day falls on a non-workday, the submission is due the next Contractor work day.
Block 15 The TSE Database shall be delivered by CD or DVD via overnight delivery with a Letter of Transmittal signed by the Contractor’s authorized approving official. E-mail notification of CD or DVD delivery will be sent to the CO, COR, and the COR designated recipients as directed. The TSE Database shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with C.3, of Part C, Performance Work Statement.
The Contractor shall also maintain a secure, password protected web-based TSE Database accessible by designated Government personnel as specified in the contract.
Addressee Copies Reg. Repro
CO
COR
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one) TDP TM Other
D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A005
2. Title of Data Item
Program Document Library Index
3. Subtitle
N/A
4. Authority
OSC-ILS-005
5. Contact Reference
PWS – C.7.6, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT N/A A MTHLY 0
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
10 DARP
15. Distribution
a. b. c. Final Copies
The Program Document Library Index (PDLI) shall be prepared in accordance with the referenced Data Item Description.
Block 13 Monthly submissions shall be delivered the 10th calendar day of the month following the reporting period. If the 10th falls on a non-workday, the submission is due the next Contractor work day.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The PDLI shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A006
2. Title of Data Item
Subcontractor Management Report
3. Subtitle
N/A
4. Authority
OSC-ILS-006
5. Contact Reference
PWS - C.7.8, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R 0
12. Date of First Submission 13. Date of Subsequent Submission 15. Distribution
30 DAC ASREQ See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Subcontractor Management Report shall be prepared in accordance with the referenced Data Item Description.
Block 12 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 13 Inform Government of agreements during Project Management Reviews.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The Subcontractor Management Report and copies of Subcontractor/Partnering Agreements shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated
OSC O3/08/2013
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A007A
2. Title of Data Item
Meeting Agenda and Presentation Mat.
3. Subtitle
N/A
4. Authority
OSC-ILS-007A
5. Contact Reference
PWS - C.7.9, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
See Block 14
9. Distribution Statement Required
A
10. Frequency
ASREQ
11. As of Date (AOD)
12. Date of First Submission
See Block 14
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Meeting Agenda and Presentation Materials shall be prepared in accordance with the referenced Data Item Description.
Block 8 The agenda and presentation materials shall be submitted 5 working days prior to the scheduled meeting.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. Meeting Agenda and Presentation Materials shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement.
E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
G. Prepared By:
OSC
H. Date
03/08/2013 I. Approved By
J. Date
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A007B
2. Title of Data Item
Meeting Minutes
3. Subtitle
N/A
4. Authority
OSC-ILS-007B
5. Contact Reference
PWS - C.7.9, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
See Block 14
9. Distribution Statement Required
A
10. Frequency
ASREQ
11. As of Date (AOD)
12. Date of First Submission
See Block 14
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Meeting Minutes shall be prepared in accordance with the referenced Data Item Description.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within five (5) working days.
Block 13 Minutes shall be submitted within 10 working days after a meeting.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. Meeting Minutes shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated
OSC
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other
D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A008
2. Title of Data Item
Continuity of Operations Plan
3. Subtitle
N/A
4. Authority
OSC-ILS-008
5. Contract Reference
PWS - C.7.1, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R 0
12. Date of First Submission 13. Date of Subsequent Submission 15. Distribution
30 DAC See Block 14 See Block 14 See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The Continuity of Operations Plan (COOP) shall be prepared in accordance with the referenced Data Item Description.
Block 12 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 13 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The COOP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of Part C. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A009
2. Title of Data Item
Integrated Support Plan
3. Subtitle
N/A
4. Authority
OSC-ILS-009
5. Contract Reference
PWS - C.7.11, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R 0
12. Date of First Submission 13. Date of Subsequent Submission 15. Distribution
See Block 14 ASREQ See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The Integrated Support Plan (ISP) shall be prepared in accordance with the referenced DID. For requested information that is described in detail in other CDRL deliverables (TSE Database, etc.), the appropriate paragraph in the ISP shall include sufficient detail to indicate a full understanding of the requirement.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 10 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 12 The initial ISP shall be submitted to the Government with the Contractor’s technical proposal E.2.7.1, Volume 1: Technical Approach, of Part E.
Block 13 The ISP shall be reviewed and updated semi-annually if necessary to reflect up-to-date information and plans depicting the current maintenance activities and implementation. If the ISP is updated, the revised data item shall be submitted within 15 working days from end of review.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The ISP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A010
2. Title of Data Item
Quality Assurance Surveillance Plan
3. Subtitle
N/A
4. Authority
OSC-ILS-010
5. Contract Reference
PWS - C.7.12, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT Blank A ONE/R 0
12. Date of First Submission 13. Date of Subsequent Submission 15. Distribution
30 DAC ASREQ See Block 14
a. b. c. Final Copies
The Quality Management Plan (QMP) shall be prepared in accordance with the referenced Data Item Description.
Block 10 Once approved by the COTR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 12 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The QMP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A011
2. Title of Data Item
Security Authorization Package
3. Subtitle
N/A
4. Authority
OSC-ILS-011
5. Contract Reference
PWS – C.7.13, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A See Block 14 A ONE/R 0
12. Date of First Submission 13. Date of Subsequent Submission 15. Distribution
60 DAC ASREQ See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The Security Authorization Package (SAP) shall be prepared in accordance with the referenced Data Item Description and C.7.13, of Part C.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within 30 working DARC.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The SCP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR-designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
OSC O3/08/2013
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A012
2. Title of Data Item
Radiation Survey Submittal
3. Subtitle
N/A
4. Authority
OSC-ILS-012
5. Contract Reference
PWS - C.8.1.1, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
A
10. Frequency
MTHLY
11. As of Date (AOD)
12. Date of First Submission
ASREQ
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Block 4 The submissions of Radiation Surveys shall be in accordance with the referenced DID.
Block 12 Radiation survey submissions shall include all radiation surveys collected during the current reporting period for each individual end item
Block 13 Monthly submissions shall be delivered by the 15th calendar day of each month. If the 15th falls on a non-workday, the submission is due the next Contractor work day.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The Radiation Surveys shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients, as directed.
OSC
H. Date
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A013
2. Title of Data Item
Parts Obsolescence Report
3. Subtitle
N/A
4. Authority
OSC-ILS-013
5. Contract Reference
PWS - C.8.4.1, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
A
10. Frequency
ONE/R
11. As of Date (AOD)
12. Date of First Submission
30DAC
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The Parts Obsolescence Report shall be prepared in accordance with the referenced Data Item Description.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 10 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The Parts Obsolescence Report shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
OSC
H. Date
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A014
2. Title of Data Item
Consumables Cost and Consumption R t
3. Subtitle
N/A
4. Authority
OSC-ILS-014
5. Contact Reference
PWS - C.8.4.2, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
A
10. Frequency
MTHLY
11. As of Date (AOD)
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
5 DARP
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Consumables Cost and Consumption Report shall be prepared in accordance with the referenced Data Item Description.
Block 13 Monthly submissions shall be delivered the 5th calendar day of each month.
If the 5th falls on a non-workday, the submission is due the next Contractor work day.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The Consumables Cost and Consumption Report shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
OSC
H. Date
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A015
2. Title of Data Item
Failure Mode Indicator Codes
3. Subtitle
N/A
4. Authority
OSC-ILS-015
5. Contract Reference
PWS - C.8.5, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
A
10. Frequency
ASREQ
11. As of Date (AOD)
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Block 4 The submission of the Failure Mode Indicator (FMI) Codes shall be prepared in accordance with the referenced Data Item Description.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The FMI codes shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
OSC
H. Date
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A017
2. Title of Data Item
Field Data Reporting System Data
3. Subtitle
N/A
4. Authority
OSC-ILS-017
5. Contract Reference
PWS - C.8.7, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
C
10. Frequency
MTHLY
11. As of Date (AOD)
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
10 DARP
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The Contractor shall provide the Field Data Reporting System (FDRS) data in accordance with applicable requirements. The Contractor shall collect data from each individual system installation, as available.
Block 12 FDRS submissions shall include all FDRS data collected during the current reporting period for each individual end item
Block 13 Monthly submissions shall be delivered by the 10th calendar day of the month following the reporting period. If the 10th falls on a non-workday, the submission is due the next Contractor work day.
Blocks 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The FDRS data shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
H. Date
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A018
2. Title of Data Item
TSE Reliability Maintainability Availability Metrics
3. Subtitle
N/A
4. Authority
OSC-ILS-018
5. Contract Reference
C.8.10, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A MTHLY 0
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
10 DARP
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The monthly submissions of the TSE Reliability Maintainability Availability Metrics (RMA) report shall be prepared in accordance with the referenced Data Item Description.
Block 13 The report will be submitted monthly. Monthly submissions are due by the 10th calendar day of the month following the monthly reporting period. If the due day falls on a non-workday, the submission is due the next Contractor work day.
Blocks 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The TSE RMA Metrics shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with C.3, of Part C, Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
OSC
H. Date
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A019
2. Title of Data Item
TSA Service Response Center Plan
3. Subtitle
N/A
4. Authority
OSC-ILS-019
5. Contract Reference
PWS - C.8.11.4, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R 0
12. Date of First Submission
See Block 14
13. Date of Subsequent Submission
ASREQ
15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The TSA Service Response Center (TSRC) Plan shall be prepared in accordance with the referenced Data Item Description.
Block 8 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 10 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 12 The initial TSRC Plan shall be submitted to the Government with the Contractor’s technical proposal E.2.7.1, Volume 1: Technical Approach, of Part E.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The TSRC Plan shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A020
2. Title of Data Item
TSA Service Response Center SOPs
3. Subtitle
N/A
4. Authority
OSC-ILS-020
5. Contact Reference
PWS - 8.11.5, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R See Block 14
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
See Block 14
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The TSA Service Response Center Standard Operating Procedures (SOPs) shall be prepared in accordance with the referenced Data Item Description.
Block 12 If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Block 13 Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The SOP shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
17. Price Group
18. Estimated Total Price
A. Contract line Item No.
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A021
2. Title of Data Item
TSA Service Response Center Metrics Report
3. Subtitle
N/A
4. Authority
OSC-ILS-021
5. Contact Reference
PWS - 8.11.6, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A See Block 14 See Block 14
12. Date of First Submission
30 DAC
13. Date of Subsequent Submission
See Block 14
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 The monthly, quarterly and annual submissions of the Service Response Center Metrics report shall be prepared in accordance with the referenced
DID.
Block 13 Monthly, quarterly and annual submissions shall be delivered by the 10th calendar day of the month following the reporting period. If the 10th falls on a non-workday, the submission is due the next Contractor work day.
Blocks 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. The TSA Service Response Center Metrics Report shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO, COR, and the COR designated recipients as directed. The CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
17. Price Group
18. Estimated Total Price
TBD
B. Exhibit
A C. Category (Check appropriate one)
TDP TM Other D. System/Item
TSE ILS Services E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A022
2. Title of Data Item
Training Materials
3. Subtitle
N/A
4. Authority
OSC-ILS-022
5. Contact Reference
PWS – C.9.13, of Part C
6. Requiring Office
OSC
7. DD 250 Req’d
LT
8. APP Code
A
9. Distribution Statement Required
A
10. Frequeny
ASREQ
11. As of Date (AOD)
12. Date of First Submission
ASREQ
13. Date of Subsequent Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Block 4 Training materials shall be provided in accordance with the referenced Data Item Description
Block 15 An electronic version of the submittal shall be submitted on a secure, password-protected Web site. Training Materials shall be submitted in electronic format compatible with Microsoft Office Suite in accordance with Paragraph C.3 of the Performance Work Statement. E-mail notification of CDRL posting will be sent to the CO , COR, and the COR designated
OSC
H. Date
| CDRL A001_Program Management Plan_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A002_ Program Status Report_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A003_Requirements Traceability Report_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A004_TSE Database_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A005_Program Document Library Index_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS:Block 13 |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A006_Subcontractor Management Report_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A007A_Meeting Agenda and Presentation Materials_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A007B_Meeting Minutes_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A008_Continuity of Operations Plan_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A009_Integrated Support Plan_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A010_Quality Management Plan_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A011_Security Authorization Package_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A012_Radiation Survey Submittal_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A013_Parts Obsolescence Report_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A014_Consumables Cost and Consumption Report_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contact Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A015_Failure Mode Indicator Codes_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract Line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A017_Field Data Reporting System data_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A018_TSE RMA Metrics_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
| CDRL A019_TSA Service Response Center Plan_03082013 |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
| A. Contract line Item No. |
| B. Exhibit |
| C. Category (Check appropriate one) |
| D. System/Item |
| E. Contract/PR No. |
| F. Contractor |
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle |
| 4. Authority |
| 5. Contract Reference |
| 6. Requiring Office |
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| 12. Date of First Submission |
| 13. Date of Subsequent Submission |
| 15. Distribution |
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
| Addressee |
| Copies |
| Reg. |
| Repro |
| 16. Total |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .