HSFE20-15-R-0012_Questions_and_Answers.docx

DOCX document 36 KB Posted

Attached to
Medical Support Services for the Center for Domestic Preparedness
Solicitation number
HSFE20-15-R-0012
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
HSFE20-15-R-0012_A00004.pdf PDF
HSFE20-15-R-0012_A00003.pdf PDF
HSFE20-15-R-0012_B.2_Cost_Price_Schedule.docx DOCX document
Attach_35_Proficiency_Testing.pdf PDF
HSFE20-15-R-0012_A00002.pdf PDF
HSFE20-15-R-0012_A00001.docx DOCX document
Attach_11_COBRATF_Incident_Management_Manual.pdf PDF
Attach_30_Quality_Assurance_Program.pdf PDF
Attach_9_List_of_Reports_or_Deliverables.pdf PDF
Attach_6_Workplace_Attire_Policy.pdf PDF
Attach_29_Operation_of_Model_445_and_555_PH_Meter.pdf PDF
Attach_8_Accident-Incident_Reporting_Procedures.pdf PDF
Attach_36_Occupational_Health_Procedures.pdf PDF
Attach_12_GFP-GFE.pdf PDF
Attach_26_Operation_of_Dual_Syringe_Diluter.pdf PDF
Attach_39_Student_Medical_Notification.pdf PDF
Attach_37_CERP_Guidelines.pdf PDF
Attach_34_Data_Entry_Into_the_CRL_Database.pdf PDF
Attach_18_Course_Schedule_Exhibit_for_Non-COBRATF_Training.pdf PDF
Attach_19_Course_Schedule_Exhibit_COBRATF_Training.pdf PDF
HSFE20-15-R-0012_(Solicitation).pdf PDF
Attach_23_Transportation_of_Biohazardous_Trash.pdf PDF
Attach_1_Performance_Work_Statement.pdf PDF
Attach_28_Operation_of_Precision_Circulating_Water_Bath.pdf PDF
Attach_3_SCA_Wage_Determination.pdf PDF
Attach_20_Chem_Surety_Program_Standards_Document.pdf PDF
Attach_16_Student_Medical_Forms.pdf PDF
Attach_35_Proficiency_Testing.pdf PDF
Attach_17_FY_2015_Training_Calendar_Exhibit.pdf PDF
Attach_22_DuoDote_Auto_Injector.pdf PDF
Attach_21_Decon_of_Patient_in_Training_Building_Medical_Room.pdf PDF
Attach_7_Workplace_Safety_and_Health_Policy.pdf PDF
Attach_38_Consumables_Exhibit.pdf PDF
Attach_10_EOP_COOP_Plan.pdf PDF
Attach_25_Seventeen_Minute_Red_Blood_Cell_Acetylcholineste.pdf PDF
Attach_33_Preparation_of_QC-QA_Controls.pdf PDF
Attach_5_Visitor_Access_Policy.pdf PDF
Attach_15_Medical_Forms_and_Screening_Information.pdf PDF
Attach_4_Statement_of_Equivalent_Hires.pdf PDF
Attach_14_Government_Facilities_Layout.pdf PDF
Attach_40_CDP_IT_Security_Awareness_and_Training.pdf PDF
Attach_13_Vehicle_Management_Procedures.pdf PDF
Attach_32_Bloodborne_Pathogen_Exposure_Control.pdf PDF
Attach_24_USAPHC_Red_Blood_Cell-Cholinesterase_Testing_and_Quality_Assurance.pdf PDF
Attach_2_Quality_Assurance_Surveillance_Plan.pdf PDF
Attach_31_Sample_Collection_Processing_Shipping.pdf PDF
Attach_27_Calibration_of_Substrate_Repipet.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSFE20-15-R-0012 Question and Answers Medical Support Services for the CDP

1. Reference: RFP page L-5 states: “Front matter, resumes of proposed key personnel (limited to 3 pages each) under section 3, the experience (limited to 5 pages each) under section 4, and past performance (limited to 5 pages each) under section 5 will not be counted towards the 100 page limitation of the Technical Proposal.”

Question: Section L.6 lists Section 4 as Quality Control Plan, Section 5 as Experience, and Section 6 as Past Performance. But the statement above has differing information. Please confirm which is correct.

Answer: It should state: Front matter, resumes of proposed key personnel (limited to 3 pages each) under section 3, the experience (limited to 5 pages each) under section 5, and past performance (limited to 5 pages each) under section 6 will not be counted towards the 100 page limitation of the Technical Proposal.

2. Reference: RFP page L-5 states: “Front matter, resumes of proposed key personnel (limited to 3 pages each) under section 3, the experience (limited to 5 pages each) under section 4, and past performance (limited to 5 pages each) under section 5 will not be counted towards the 100 page limitation of the Technical Proposal.”

Question: May resumes be submitted in an Appendix to the Technical Proposal?

Answer: Yes, can be submitted in an Appendix, but are limited to 3 pages each.

3. Reference: RFP page L9 to L11, Section L.6.C has a breakdown of what is to be covered in Volume 2. However, page L5, Section L.6.A also has a breakdown of what should be included in Volume 2.

Question: Are we to organize the Business Proposal based on the outline in L.6.A, or L.6.C?

Answer: See the revised sections attached. Now both listings match.

4. Question: May electronic copies of the proposal on CDs be submitted in PDF format?

Answer: The price/cost proposal worksheets shall be in excel format. All other proposal elements may be submitted in PDF.

5. Reference: RFP page L66, Section L.6.A states the font should be Courier 12 point or equivalent.

Question: May we use Times New Roman or Arial font in size 12 or 13 instead of Courier?

Answer: Times New Roman or Arial in font size 12 is acceptable.

6. Reference: Page 16 of the PWS states: “Quality Control Plan (QCP): The plan developed and provided by the Contractor with the proposal or bid or within 10 days of contract award which provide the method in which the contractor will control the performance and quality of the contract requirements.” However page 27 states: “6.1.1.1 The contractor shall submit the final written Quality Control Program for COR approval within 30 days after contract award.”

Question: If we are providing a QCP with the proposal, are we to provide the final QCP within 30 days after award?

Answer: Yes, you should provide a QCP with the proposal and the awardee will be expected to provide the final QCP within 30 days of award.

7. Reference: Page 5 of the solicitation, Section B.3 6 G&A Rate or Handling Fee for Other Direct Costs Question: Regarding the table supplied in this section, does the government request that the three separate rates for “G&A Rate / Handling Fee / Mark-up” be listed by the bidder within the table, as it is listed within the header of the column? (ie: X% / Y% / Z%) Answer: The Government is only looking for one rate to be proposed. Contractor’s use various terms for this rate, thus the Government listed the 3 commonly used terms, however are only looking for one rate.

8. Reference: Page 48 of the solicitation, Section C.3 states: “3. The offeror shall provide a schedule of labor rates, including health and welfare (fringe) benefits, for those non-exempt labor categories that are subject to the Service Contract Act. The schedule of labor rates shall include the applicable labor rates for the base period and each option period.” Question: Please define the term “labor rates” used in this section.

Answer: The Government is not looking for the fully burdened rate. The Government is looking for the actual hourly rate being paid to the employee and the health and welfare (fringe) amount to ensure they meet the SCA wage determination requirements.

9. Reference: Page 48 of the solicitation, Section C.3 states: “3. The offeror shall provide a schedule of labor rates, including health and welfare (fringe) benefits, for those non-exempt labor categories that are subject to the Service Contract Act. The schedule of labor rates shall include the applicable labor rates for the base period and each option period.” Question: For those non-exempt labor categories that are subject to the Service Contract Act, does the government request that the vendor supply a schedule of Wage Determination (hourly pay rate) rates, as the “labor rate,” OR does the government request that the vendor supply a schedule of fully burdened rates as the “labor rate”?

Answer: The offeror shall provide the fully burdened rates, however, the Government requires the proposed hourly rate and health and welfare (fringe) as a separate numbers to ensure they meet the SCA wage determination requirements.

10. Reference: Page 43 of the solicitation, Section L.6.A.2, Volume 2 Business Proposal states: “2. Price/Cost breakdown based on work breakdown structure (WBS) provided in Section 1 Work Plan of Technical Proposal, including, Overhead G&A Rate or Handling Fee for Cost Reimbursement CLINs” Question: Please provide all of the elements that the government requests the vendors to detail, as part of the Price/Cost breakdown.

Answer: The requirement for a WBS has been removed, please see updated RFP section attached.

11. Reference: RFP pages B1-B2, Section B.2 Cost/Price Schedule Question: May the government please provide the tables in Section B.2 Cost/Price schedule in MS Word format?

Answer: Yes, see attached.

12. Reference: RFP page L9, Section L.6.A mentions we are to provide an indirect rate agreement.

Question: What exactly is meant by the term “indirect rate agreement?”

Answer: The requirement for indirect rate agreement has been removed.

13. Question: It is our understanding that the current contract requires a license issued by the Alabama State Board of Health. Will the new contract require the same?

Answer: Yes.

14. Question: It is our understanding that the current contract requires a Clinical Laboratory Improvement Amendments Certificate of Compliance. Will the new contract require the same?

Answer: Yes.

15. Question: It is our understanding that the current contract requires the Medical Laboratory Technicians to have Positive Education and Experience Requirements plus 40 hours training course CRL, certification to perform testing and require annual recertification. Will the new contract require the same?

Answer: The requirements for Medical Laboratory technicians are listed in PWS section 7.4

16. Question: It is our understanding that the current contract requires a medical liability insurance policy. Will the new contract require the same?

Answer: See RFP Section I.14 52.237-7 Indemnification and Medical Liability Insurance, page I-10 . The costs for medical liability insurance may be billed under ODCs. See the updated CLIN schedule.

17. Question: Currently the Project Manager is the only designated “Key Personnel” and therefore is the only resume required for inclusion in the offeror’s proposal.

Answer: While the Government may specify at least the PM as key personnel in the RFP, it is up to the contractor to specify the personnel they deem to be key personnel for their proposal purposes.

18. Question: Attachment 35 uses the pagination # of 6 pages but it appears the 6th page did not upload.

Answer: There is an updated version of this document that is 10 pages. It is attached.

19. Question: Attachment 21 consists of 2 documents. One was Exhibit of Medical Procedures and DECON of Patient COBRATF Training Medical Room.

Answer: The Government reviewed what was posted on www.fbo.gov and there is only one document in Attachment 21.

File details come from the government source that posted it. Updated .