QUESTIONS AND ANSWERS FOR GENERATOR & HVAC PROJECT
1) Size of the gas pipe line in bldg C-54?
2” Feed at building, according the NJ Gas Company representative the pipe is sufficient base on a 250-400 KW Generator. But final determination will be made once we supply them with
Generator Size.
2) Where is the main gas valve located?
Main Gas Valve is located next to Boiler Room, on side of building.
3) Who is running the feed?
GC is responsible to run feed to Generator from Supply and can tap into line.
4) How do you obtain an Air Permit?
PWD Environmental Officer can help us as well as the GC. We are responsible to submit application and pay for the permit.
5) What permits are actually necessary for the generator?
Just an Air Permit.
6) Is this going to be a design- build project?
This is going to be somewhat of a design-build project. You will design the layout, at your own cost
(for your technical proposal), and FEMA is going to be evaluating your design.
7) What kind of controls are in there now?
VAV
8) Do you have As-builts of HVAC system?
Provided by PWD electronically
9) Are all the ducts, pipe being changed out?
The GC is responsible to make those determinations.
10) The old HVAC unit- what is happening to that?
The NAVY wants the old HVAC units. They will provide a dumpster for this. Piping’s will be left up to the GC.
11) Do you have floor plans (heights, ceiling, actual scaled drawings)?
PWD Supplied Drawings
12) Any better drawings?
No there are no better drawings
13) Can you provide the number of VAV’s and their locations?
PWD Supplied Drawings shows locations.
14) Any mechanical designs?
PWD Supplied Drawings
15) Where will the staging area be?
Outside of the warehouse (the rear parking lot).
16) Badges, who pays for them? Cost of the background investigation?
Contractor bears all of these costs. All information can be found at www.rapidgate.com (this will be uploaded in FBO).
17) What are the work hours?
7 am to 4:30 pm.
18) Is the gov’t providing the gas meter or the gas meter monitor?
The NJ Natural Gas Company will install a new Gas Meter and Monitor at no cost to
Government.