STATEMENT OF WORK
Replace HVAC System
Dated: 04/02/2012
DISCUSSION:
Location: FEMA New Jersey Close-out Office NWSC (Naval Weapon Station Earle): Bldg C-54. 201 Highway, 34 South
Colts Neck, NJ 07722
Current Condition:
Building C54 (Office Space 22,490 SF) is Heated and Air Conditioned with 2 HVAC Units located on the Roof of the
Building. Both units are over 25 years old with one unit missing the condenser and other parts. These parts are no longer available. The second unit is functioning at 20% capacity and an analysis concluded major parts needing replacement with parts required no longer available.
REQUIREMENTS:
1. Disconnect and remove of the two existing HVAC Units located on the roof of Building C54. Dispose in accordance with local and state requirements. Remove any electrical piping, duct and etc. as required. Repair any roof damage were units were removed.
2. Provide and install two new HVAC Units on the roof of the building and Condensers on the Ground next to the building.
Units are required to be sufficient and efficient to Heat and Air Condition 22,490 SF of Office Space.
a. Pour New Concrete Pad for the Condensing Units
b. Make new electrical, piping, duct and etc connections
c. Test, training, startup of units
3. Repair roof after removals. Repair and close any other penetrations.
4. Design, layout, shop drawings, approval design coordination.
5. 2 new HVAC units roof mounted.
6. 2 new condensing units.
7. HVAC units install on roof with all connection and materials.
8. Manufacture and install new ductwork to facilitate new units tying into existing.
9. Condensing units install next to building with all connections and materials.
10. Provide tonnage and vibration isolators for units on roof.
11. Verify structural condition of rood structure.
12. Use prefab unit for condensers.
13. All work shall be done in accordance with local, State and Federal requirements and regulations.