6_143-164_-Final_Ref_Dwgs.pdf

PDF 10 MB Posted

Attached to
HANGAR RECONFIGURATION - CG BASE CAPE COD, BOURNE, MA Federal contract opportunity
Solicitation number
HSCGG1-16-B-PRV171
Issued by
Department of Homeland Security US Coast Guard

About this file

REFERENCE DRAWING FILE 1 OF 1

View the file

Other files for this federal contract opportunity

Other files attached to HANGAR RECONFIGURATION - CG BASE CAPE COD, BOURNE, MA, newest first.
File Type Posted
Abstract_of_Bids.pdf PDF
AMENDMENT007.pdf PDF
AMENDMENT006.pdf PDF
AMENDMENT005.pdf PDF
AMENDMENT004.pdf PDF
AMENDMENT003.pdf PDF
AMENDMENT002.pdf PDF
AMENDMENT001.pdf PDF
1_01-30_-Final.pdf PDF
HSCGG116BPRV171.pdf PDF
WAGERATEPRV171.pdf PDF
4_91-120_-Final.pdf PDF
5_121-142_-Final.pdf PDF
2_31-60_-Final.pdf PDF
3_61-90_-Final.pdf PDF
FINAL_Specs_1_14_16.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HANGAR

M A

TC

H

L

IN

E S

H E

E T

C I1

RECORD DRAWINGS

JANUARY 31, 2013

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

RD-1

KBSpangler Typewritten Text

FIRE PROTECTION LEGEND

CHECK DETAIL

WET-PIPE RISER

LEGEND

FIRE PROTECTION SYSTEM PIPING DIAGRAM

SPRINKLER SYSTEM DESIGN DATA

PUMP SCHEDULE

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

RD-2

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

SEQUENCE OF OPERATION

OPERATIONS MATRIX FOR FIRE ALARM/MASS NOTIFICATION SYSTEM

MODES

FIRE ALARM/MASS NOTIFICATION SYSTEM RISER DIAGRAM

FIRE ALARM RISER NOTES

RECORD DRAWINGS

JANUARY 31, 2013

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-3

DN

BLADDER TANK ELEVATION VIEW

GRAPHIC SCALE

MEZZANINE PLAN - AREA E

A

B C D F G E

ROOM SCHEDULE - FIRST FLOOR AND MEZZANINE - AREA E

FIRE SUPPRESSION SYSTEM RISER

END VIEW

PARTIAL FIRST FLOOR PLAN - AREA E

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-4

D N

D N

KEY PLAN

A

B C D F G E

GRAPHIC SCALE

SECOND FLOOR PLAN - AREA B

ROOM SCHEDULE - SECOND FOOR AREA B

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-5

ENLARGED FIRE PUMP BUILDING

KEY PLAN

A

B C D F G E

GRAPHIC SCALE

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-6

R ef er en ce D ra w in g

D is cl ai m er

Th is d ra w in g is a re fe re nc e dr aw in g” a nd i s fr om p ri or pr oj ec t(

s) n ot a ss oc ia te d w it h th is p ro je ct

Th is d ra w in g is o nl y be in g pr ov id ed t o sh ow e xi st in g co nd it io ns w hi ch ar e be lie ve d to b e ge ne ra lly a cc ur at e, b ut s ha ll be f ie ld ve fi ed by t he c on tr ac to r) p ri or t o st ar t of co ns tr uc ti on a nd r ou gh -in o f sy st em s.

-7

KBSpangler

RD-7

er en ce D ra w in g

D is cl ai d ra w in g is a re fe re nc e dr aw in g” a nd i s fr om p ec t(

s) n ot a ss oc ia te d w it h th is p ro je ct

Th is d ra w in g is o nl y be in g pr ov id ed t o sh ow e xi st in g co nd it io ns w be lie ve d to b e ge ne ra lly a cc ur at e, b ut s ha ll be f fi ed by t he c on tr ac to r) p ri or t o st ar tr uc ti on a nd r ou gh -in o f sy st

-8

KBSpangler

RD-8

er en ce D ra w in g

D is cl ai d ra w in g is a re fe re nc e dr aw in g” a nd i s fr om p ec t(

s) n ot a ss oc ia te d w it h th is p ro je ct

Th is d ra w in g is o nl y be in g pr ov id ed t o sh ow e xi st in g co nd it io ns w be lie ve d to b e ge ne ra lly a cc ur at e, b ut s ha ll be f fi ed by t he c on tr ac to r) p ri or t o st ar tr uc ti on a nd r ou gh -in o f sy st

-9

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler

RD-9

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

RD-10

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of

RD-11

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler

RD-11

This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

RD-12

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text

RD-13

KBSpangler Typewritten Text

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-14

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-15

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-16

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-17

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-18

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler

RD-19

Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

RD-20

SPRINKLER REFERENCE DRAWING 21

KBSpangler Typewritten Text

KBSpangler Typewritten Text

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

RD-21

SPRINKLER REFERENCE DRAWING 22

KBSpangler Typewritten Text Reference Drawing Disclaimer This drawing is a “reference drawing” and is from prior project(s) not associated with this project. This drawing is only being provided to show existing conditions which are believed to be generally accurate, but shall be field verified (by the contractor) prior to start of construction and rough-in of systems.

KBSpangler Typewritten Text

RD-22

File details come from the government source that posted it. Updated .