Invitation For Bid Number: HSCG88-11-B-PQQ017/Amendment A0003
SECTION B
SCHEDULE OF PRICES
CLIN
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
100000
Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard in accordance with specifications and drawings for the Base Period from DATE OF AWARD to November 30, 2011
110000 IMPROPER CHARACTERISTIC TASK ORDER
111000 MOBILIZATION / DEMOBILIZATION
111001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $
111002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $
111003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
111004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
111005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
111006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
111007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 113000 Removals Shore Construction and 114200 Shore Construction 1 EACH $ $
111008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 113000 Removals Shore Construction and 114200 Shore Construction 1 EACH $ $
111009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 113000 Removals Shore Construction and 114200 Shore Construction 1 EACH $ $
112000 REMOVALS – IN WATER CONSTRUCTION
112001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
STD 02. 8 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
112002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON
STD 04. 3 EACH $ $
112003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and
ATON STD 08. 3 EACH $ $
112004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $
112005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $
112006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 2 EACH $ $
112007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
Contractor shall dispose of all other materials. 4 EACH $ $
112008 Remove and dispose of one NON ATON piling using vibratory method 1 EACH $ $
113000 Removals - Shore Construction
113001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $
113002
Remove sectional tower assembly and disassemble.
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
113003 Remove concrete foundation up to 6 Cubic Yards.
Contractor shall dispose of all other materials. 2 EACH $ $
113004 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials. 2
CUBIC
YARD $ $
114000 INSTALLATIONS
114100 IN WATER CONSTRUCTION -
INSTALLATIONS
114101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $
114102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $
114103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $
114104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $
114105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06.
Remove and return temporary buoy. 4 EACH $ $
114106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON
STD 08. 4 EACH $ $
114107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON
STD 08. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
114108 Install a concrete pedestal foundation on a break wall.
Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05. 1 EACH $ $
114109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05. 1
CUBIC
YARD $ $
114110
Install a submerged obstruction concrete foundation.
Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 . 1 EACH $ $
114111
Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD
05. 1 EACH $ $
114112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $
114113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $
114114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON
STD 03, ATON STD 04, ATON STD 05, ATON STD
06, ATON STD 09, ATON STD 10 and ATON STD
11. 16 EACH $ $
114115 Install one (1) NON ATON steel pile using the vibratory method 1 EACH $ $
114200 SHORE CONSTRUCTION - INSTALLATION
114201 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 1 EACH $ $
114202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON
STD 07. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
114203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing
ATON STD 07. 3 EACH $ $
114204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $
114205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON
STD 03, ATON STD 04, ATON STD 05 ATON STD
06, ATON STD 09, ATON STD 10 and ATON STD
11. 16 EACH $ $
114206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $
114207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $
120000 EMERGENCY TASK ORDERS
121000 EMERGENCY MOBILIZATION /
DEMOBILIZATION:
121001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $
121002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
121003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $
122000 REMOVALS
122001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 1 EACH $ $
122002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 1 EACH $ $
122003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
Contractor shall dispose of all other materials. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
122004
Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $
122005
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $
130000 TRANSIT COSTS
130001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM). 600 NM $ $
140000 REPAIRS
140001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14. 1 EACH $ $
140002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD
14. 1 EACH $ $
140003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON
STD 02, ATON STD 03, ATON STD 04, ATON STD
05, ATON STD 06, and ATON STD 11. 1 EACH $ $
150000 MATERIALS
150001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640
LINEAR
FEET $ $
150002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $
150003
Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item 150001. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
150004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing
ATON STD 05. 3 EACH $ $
150005
Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet 100
PER 10
LINEAR
FEET $ $
150006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09. 5 EACH $ $
150007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10. 3 EACH $ $
150008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11. 16 EACH $ $
150009
Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1.
Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11. 16 SET $ $
150010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06. 2 EACH $ $
150011
Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
STD 08. 3 EACH $ $
150012
Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
STD 08. 3 EACH $ $
150013
Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
STD 08. 3 EACH $ $
150014
Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
ATON STD 08. 3 EACH $ $
150015
Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
ATON STD 10. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
150016
Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
ATON STD 10. 3 EACH $ $
150017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08. 3 SET $ $
150018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08. 3 SET $ $
150019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $
150020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $
150021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $
150022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $
150023 Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14. 10 EACH $ $
160000 RETURN OF GOVERNMENT MATERIALS
160001
At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order. 1 EACH $ $
170000 AS-BUILT PHOTOGRAPHS
170001
Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)
NOTE: All photos taken under one Task Order may be combined on one CD.) 16 EACH $ $
180000 DIVING SERVICES
180001
Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line. 5 EACH $ $
180002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings. 5 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
190000 FIELD ENGINEERING
190001 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “B”. 1 EACH $ $
190002 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “C”. 1 EACH $ $
190003 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “D”. 5 EACH $ $
191000 Labor and Materials to secure all required local, state and federal permits. 5 EACH $ $
BASE YEAR - TOTAL EVALUATED
PRICE (Line Items 100000 through 191000) $
200000 First Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the First Option Period from 1 December 2011 to 30 November 2012
210000 IMPROPER CHARACTERISTIC TASK ORDER
211000 MOBILIZATION / DEMOBILIZATION
211001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $
211002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $
211003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
211004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
211005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
211006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
211007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 213000 Removals Shore Construction and 214200 Shore Construction 1 EACH $ $
211008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 213000 Removals Shore Construction and 2142000 Shore Construction 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
211009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 213000 Removals Shore Construction and 214200 Shore Construction 1 EACH $ $
212000 REMOVALS – IN WATER CONSTRUCTION
212001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 8 EACH $ $
212002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 3 EACH $ $
212003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08. 3 EACH $ $
212004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $
212005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $
212006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components.
Contractor shall dispose of all other materials. 2 EACH $ $
212007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
Contractor shall dispose of all other materials. 4 EACH $ $
212008 Remove and dispose of one NON ATON piling using vibratory method 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
213000 Removals - Shore Construction
213001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $
213002
Remove sectional tower assembly and disassemble. Return all ATON hardware and reusable sectional tower components.
Contractor shall dispose of all other materials. See drawings
ATON STD 08. 3 EACH $ $
213003 Remove concrete foundation up to 6 Cubic Yards. Contractor shall dispose of all other materials. 2 EACH $ $
213004 Remove an additional 1 Cubic Yard of concrete foundation.
Contractor shall dispose of all other materials. 2
CUBIC
YARD $ $
214000 INSTALLATIONS
214100 IN WATER CONSTRUCTION - INSTALLATIONS
214101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $
214102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $
214103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13.
Remove and return temporary buoy. 8 EACH $ $
214104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board.
In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $
214105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy. 4 EACH $ $
214106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08. 4 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
214107 Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08. 3 EACH $ $
214108 Install a concrete pedestal foundation on a break wall. Using up to 5 Cubic Yards of concrete in accordance with drawing
ATON STD 05. 1 EACH $ $
214109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing
ATON STD 05. 1
CUBIC
YARD $ $
214110
Install a submerged obstruction concrete foundation. Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing
ATON STD 05 . 1 EACH $ $
214111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05. 1 EACH $ $
214112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $
214113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation.
Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $
214114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON
STD 01, ATON STD 02,ATON STD 03, ATON STD 04,
ATON STD 05, ATON STD 06, ATON STD 09, ATON STD
10 and ATON STD 11. 16 EACH $ $
214115 Install one (1) NON ATON steel pile using the vibratory method 1 EACH $ $
214200 SHORE CONSTRUCTION - INSTALLATION
214201 Install four “H” piles to receive a sectional tower assembly.
In accordance with drawing ATON STD 07. 1 EACH $ $
214202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 3 EACH $ $
214203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing ATON
STD 07. 3 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
214204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $
214205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON
STD 01, ATON STD 02, ATON STD 03, ATON STD 04,
ATON STD 05 ATON STD 06, ATON STD 09, ATON STD
10 and ATON STD 11. 16 EACH $ $
214206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $
214207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $
220000 EMERGENCY TASK ORDERS
221000 EMERGENCY MOBILIZATION / DEMOBILIZATION:
221001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $
221002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
221003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $
222000 REMOVALS
222001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
STD 02. 1 EACH $ $
222002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON
STD 04. 1 EACH $ $
222003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. 1 EACH $ $
222004
Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
222005
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $
230000 TRANSIT COSTS
230001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile
(NM). 600 NM $ $
240000 REPAIRS
240001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD
13 and ATON STD 14. 1 EACH $ $
240002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON
STD 12 and ATON STD 14. 1 EACH $ $
240003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, and
ATON STD 11. 1 EACH $ $
250000 MATERIALS
250001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640
LINEAR
FEET $ $
250002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $
250003 Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05.
NOTE: Steel pipe will be cost out using line item 250001. 3 EACH $ $
250004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing ATON STD
05. 3 EACH $ $
250005
Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet 100
PER 10
LINEAR
FEET $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
250006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09. 5 EACH $ $
250007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10. 3 EACH $ $
250008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11. 16 EACH $ $
250009
Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11. 16 SET $ $
250010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06. 2 EACH $ $
250011
Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $
250012
Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $
250013
Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $
250014
Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 08. 3 EACH $ $
250015
Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10. 3 EACH $ $
250016
Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10. 3 EACH $ $
250017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing
ATON STD 08. 3 SET $ $
250018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08. 3 SET $ $
250019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON
STD 12. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED BY
UNIT PRICE)
250020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON
STD 12. 1 EACH $ $
250021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON
STD 12. 1 EACH $ $
250022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON
STD 12. 1 EACH $ $
250023 Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14. 10 EACH $ $
260000 RETURN OF GOVERNMENT MATERIALS
260001
At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order. 1 EACH $ $
270000 AS-BUILT PHOTOGRAPHS
270001
Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.) NOTE: All photos taken under one Task Order may be combined on one CD.) 16 EACH $ $
280000 DIVING SERVICES
280001
Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line. 5 EACH $ $
280002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings. 5 EACH $ $
290000 FIELD ENGINEERING
290001 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “B”. 1 EACH $ $
290002 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “C”. 1 EACH $ $
290003 Perform a geodetic survey as per the requirements of
POSITIONING METHOD “D”. 5 EACH $ $
291000 Labor and Materials to secure all required local, state
FIRST OPTION YEAR - TOTAL
EVALUATED PRICE (Line Items 200000 through 291000) $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
300000
Second Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the Second Option Period from 1 December 2012 to 30 November
310000 IMPROPER CHARACTERISTIC TASK ORDER
311000 MOBILIZATION / DEMOBILIZATION
311001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $
311002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $
311003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
311004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
311005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
311006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $
311007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 313000 Removals Shore Construction and 314200 Shore Construction 1 EACH $ $
311008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 313000 Removals Shore Construction and 314200 Shore Construction 1 EACH $ $
311009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 313000 Removals Shore Construction and 3142000 Shore Construction 1 EACH $ $
312000 REMOVALS – IN WATER CONSTRUCTION
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
312001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
STD 02. 8 EACH $ $
312002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON
STD 04. 3 EACH $ $
312003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and
ATON STD 08. 3 EACH $ $
312004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $
312005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $
312006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 2 EACH $ $
312007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
Contractor shall dispose of all other materials. 4 EACH $ $
312008 Remove and dispose of one NON ATON piling using
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
313000 Removals - Shore Construction
313001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $
313002
Remove sectional tower assembly and disassemble.
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08. 3 EACH $ $
313003 Remove concrete foundation up to 6 Cubic Yards.
Contractor shall dispose of all other materials. 2 EACH $ $
313004 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials. 2
CUBIC
YARD $ $
314000 INSTALLATIONS
314100 IN WATER CONSTRUCTION -
INSTALLATIONS
314101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $
314102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $
314103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $
314104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
314105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06.
Remove and return temporary buoy. 4 EACH $ $
314106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON
STD 08. 4 EACH $ $
314107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON
STD 08. 3 EACH $ $
314108 Install a concrete pedestal foundation on a break wall.
Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05. 1 EACH $ $
314109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05. 1
CUBIC
YARD $ $
314110
Install a submerged obstruction concrete foundation.
Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 . 1 EACH $ $
314111
Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD
05. 1 EACH $ $
314112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $
314113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
314114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON
STD 03, ATON STD 04, ATON STD 05, ATON STD
06, ATON STD 09, ATON STD 10 and ATON STD
11. 16 EACH $ $
314115 Install one (1) NON ATON steel pile using the
314200 SHORE CONSTRUCTION - INSTALLATION
314201 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 1 EACH $ $
314202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON
STD 07. 3 EACH $ $
314203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing
ATON STD 07. 3 EACH $ $
314204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $
314205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON
STD 03, ATON STD 04, ATON STD 05 ATON STD
06, ATON STD 09, ATON STD 10 and ATON STD
11. 16 EACH $ $
314206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $
314207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $
320000 EMERGENCY TASK ORDERS
321000 EMERGENCY MOBILIZATION /
DEMOBILIZATION:
321001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $
321002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $
321003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
322000 REMOVALS
322001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 1 EACH $ $
322002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 1 EACH $ $
322003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
Contractor shall dispose of all other materials. 1 EACH $ $
322004
Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $
322005
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $
330000 TRANSIT COSTS
330001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM). 600 NM $ $
340000 REPAIRS
340001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14. 1 EACH $ $
NO. DESCRIPTION
EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE
EST TOTAL
EVALUATED
PRICE
(EST QTY
MULTIPLIED
BY UNIT
PRICE)
340002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD
14. 1 EACH $ $
340003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON
STD 02, ATON STD 03, ATON STD 04, ATON STD
05, ATON STD 06, and ATON STD 11. 1 EACH $ $
350000 MATERIALS
350001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640
LINEAR
FEET $ $
350002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $
350003
Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item 350001. 3 EACH $ $
350004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing