About this file

Amendment A0001 (Standard Form 30)

View the file

Other files

File Type Posted
12.16.10 HSCG8811BPQQ017 Abstract.pdf PDF
Amendment A0006.pdf PDF
Amendment A0005.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0003.pdf PDF
Amendment A0002.pdf PDF
ATON-STD-07 2of3.pdf PDF
ATON-STD-12 1of2.pdf PDF
ATON-STD-07 3of3.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0001.pdf PDF
Appendix A _Work Windows for AOR.pdf PDF
ATON-STD-07 1of3.pdf PDF
ATON-STD-13.pdf PDF
ATON-STD-12 2of2.pdf PDF
Wage_Decision_No_CA20100029.pdf PDF
Drawings.pdf PDF
Contractor's Responsibility Questionnaire.pdf PDF
Contractor's Request for Clarification.pdf PDF
Specifications.pdf PDF
Wage_Decision_No_CA20100009.pdf PDF
Invitation_For_Bid.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A0001 22 Nov 2010 PSN 3206279

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG CEU Oakland 2000 Embarcadero, Suite 200 Oakland, CA 94606

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE BIDDERS

X HSCG88-11-B-PQQ017

9B. DATE (SEE ITEM 11)

5 Nov 2010

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to: extend the due date for bid submission, provide responses to questions from prospective bidders, revise Section B, revise paragraph M.2 and change the header information.

A. SEALED OFFERS ARE DUE AT THE PLACE SPECIFIED IN ITEM 8 OF THE STANDARD FORM 1442

BY 2:00 P.M. LOCAL TIME ON 14 DECEMBER 2010.

B. Responses to Questions:

QUESTION: It appears the following drawings are missing from the existing packet of drawings; ATON STD 07, ATON STD 12, ATON STD 13. Can we get these drawings prior to bid?

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JANICE M. PRESTON

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Invitation for Bid HSCG88-11-B-PQQ017 Amendment A0001 22 November 2010

ANSWER: Drawings ATON STD 07, ATON STD 12 and ATON STD 13 are attached.

QUESTION: The specification states that the contractor shall obtain all necessary local state, and federal permits (1) What permits are required? (2) Is this project exempt from C.E.Q.A?

ANSWER: (1) Permits may include, but are not limited to: Recreation and Conservation Districts for the work area, U.S. Department of Army Corps Nationwide Permits, California State Water Resource Control Board Certification for NWP, California Coastal Commission Negative Determination, U.S. Fish and Wildlife/National Marine Fisheries Serve, and Zoning District Permits. (2) No

QUESTION: The specification states any costs with permits shall be part of the bid. Under what bid item do we add the cost for obtaining permits?

ANSWER: Line items 191000, 291000, 391000, 491000 and 591000. The attached revised “ Section B - Schedule of Prices” includes the line item for obtaining permits.

QUESTION: The specification Item C mentions Appendix A. Is Appendix A available for download, since we have yet to locate it?

ANSWER: In-Water Work Windows may include, but are not limited to those found in Appendix A (Attached).

Contractor is responsible to determine proper in-water work window after issuance of the task order through the permit process.

QUESTION: Bid items refer to land work. Will land work be accessible by vehicle? Or will it require boats or other means of transport to access land work?

ANSWER: Not all land work will be accessible by vehicle. Some Aids to Navigation are on islands or spits of land that must be accessed by barge/boat (other means of transportation)

QUESTION: Plan pages numbering appears to be incorrect. Plans we printed had multiple pages numbered ATON- STD-05, ATON-STD-06 and ATON-STD-08. However, there was no 07, 12, or 13. This was difficult when trying to reference plan pages called out on the bid list.

ANSWER: Drawings ATON STD 07, ATON STD 12 and ATON STD 13 are attached.

QUESTION: Approximate or average depth for single pile structures below water?

ANSWER: Average Depth for Single Pile Structures from MLLW to Mudline is 30 feet.

QUESTION: Depth below water for tri-pile structures?

ANSWER: Average Depth for Multi Pile Structures from MLLW to Mudline is 45 feet.

QUESTION: Ok to leave concrete structures below water? For fallen/submerged ATON Structures.

ANSWER: All material associated with a fallen/submerged structure (including concrete) shall be recovered.

Invitation for Bid HSCG88-11-B-PQQ017 Amendment A0001 22 November 2010

C. Paragraph M.2 Bid Evaluation is revised to read:

For evaluation purposes only, the Government will determine the low bid based on the TOTAL EVALUATED AMOUNT FOR ITEMS 10000 thru 591000 (Base Year and Options Years 1,2,3 and 4).

D. Change the header information for pages 4 – 87 to read “Invitation For Bid Number: HSCG88-11-B-

PQQ017”

8 ATTACHMENTS;

(1) Drawing ATON STD 07 1 of 3

(2) Drawing ATON STD 07 2 of 3

(3) Drawing ATON STD 07 3 of 3

(4) Drawing ATON STD 12 1 of 2

(5) Drawing ATON STD 12 2 of 2

(6) Drawing ATON STD 13

(7) Section B – Schedule of Price (Page 4 of 87 to page 47 of 87)

(8) Appendix A

A0001