About this file

Section B - Schedule of Prices

View the file

Other files

File Type Posted
12.16.10 HSCG8811BPQQ017 Abstract.pdf PDF
Amendment A0006.pdf PDF
Amendment A0005.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0003.pdf PDF
Amendment A0002.pdf PDF
ATON-STD-07 2of3.pdf PDF
ATON-STD-12 1of2.pdf PDF
ATON-STD-07 3of3.pdf PDF
Appendix A _Work Windows for AOR.pdf PDF
Amendment A0001.pdf PDF
ATON-STD-07 1of3.pdf PDF
ATON-STD-13.pdf PDF
ATON-STD-12 2of2.pdf PDF
Wage_Decision_No_CA20100029.pdf PDF
Drawings.pdf PDF
Contractor's Responsibility Questionnaire.pdf PDF
Contractor's Request for Clarification.pdf PDF
Specifications.pdf PDF
Wage_Decision_No_CA20100009.pdf PDF
Invitation_For_Bid.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation For Bid Number: HSCG88-11-B-PQQ017/Amendment A0001

SECTION B

SCHEDULE OF PRICES

CLIN

NO. DESCRIPTION

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

100000

Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard in accordance with specifications and drawings for the Base Period from DATE OF AWARD to November 30, 2011

110000 IMPROPER CHARACTERISTIC TASK ORDER

111000 MOBILIZATION / DEMOBILIZATION

111001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $

111002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $

111003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

111004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

111005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

111006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

111007

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

111008

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

111009

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

112000 REMOVALS – IN WATER CONSTRUCTION

112001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02. 8 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

112002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON

STD 04. 3 EACH $ $

112003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and

ATON STD 08. 3 EACH $ $

112004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $

112005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $

112006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 2 EACH $ $

112007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials. 4 EACH $ $

112008 Remove and dispose of one NON ATON piling using vibratory method 1 EACH $ $

113000 Removals - Shore Construction

113001

Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $

113002

Remove sectional tower assembly and disassemble.

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

113003 Remove concrete foundation up to 6 Cubic Yards.

Contractor shall dispose of all other materials. 2 EACH $ $

113004 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials. 2

CUBIC

YARD $ $

114000 INSTALLATIONS

114100 IN WATER CONSTRUCTION -

INSTALLATIONS

114101

Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $

114102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $

114103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $

114104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $

114105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06.

Remove and return temporary buoy. 4 EACH $ $

114106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON

STD 08. 4 EACH $ $

114107

Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON

STD 08. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

114108 Install a concrete pedestal foundation on a break wall.

Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05. 1 EACH $ $

114109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05. 1

CUBIC

YARD $ $

114110

Install a submerged obstruction concrete foundation.

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 . 1 EACH $ $

114111

Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD

05. 1 EACH $ $

114112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $

114113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $

114114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD

06, ATON STD 09, ATON STD 10 and ATON STD

11. 16 EACH $ $

114115 Install one (1) NON ATON steel pile using the vibratory method 1 EACH $ $

114200 SHORE CONSTRUCTION - INSTALLATION

114201 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 1 EACH $ $

114202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON

STD 07. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

114203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing

ATON STD 07. 3 EACH $ $

114204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $

114205

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD

06, ATON STD 09, ATON STD 10 and ATON STD

11. 16 EACH $ $

114206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $

114207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $

120000 EMERGENCY TASK ORDERS

121000 EMERGENCY MOBILIZATION /

DEMOBILIZATION:

121001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $

121002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

121003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $

122000 REMOVALS

122001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 1 EACH $ $

122002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 1 EACH $ $

122003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

Contractor shall dispose of all other materials. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

122004

Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $

122005

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $

130000 TRANSIT COSTS

130001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM). 600 NM $ $

140000 REPAIRS

140001

Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14. 1 EACH $ $

140002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD

14. 1 EACH $ $

140003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON

STD 02, ATON STD 03, ATON STD 04, ATON STD

05, ATON STD 06, and ATON STD 11. 1 EACH $ $

150000 MATERIALS

150001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640

LINEAR

FEET $ $

150002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $

150003

Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

150004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing

ATON STD 05. 3 EACH $ $

150005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet 100

PER 10

LINEAR

FEET $ $

150006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09. 5 EACH $ $

150007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10. 3 EACH $ $

150008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11. 16 EACH $ $

150009

Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1.

Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11. 16 SET $ $

150010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06. 2 EACH $ $

150011

Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08. 3 EACH $ $

150012

Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08. 3 EACH $ $

150013

Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08. 3 EACH $ $

150014

Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 08. 3 EACH $ $

150015

Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

150016

Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10. 3 EACH $ $

150017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08. 3 SET $ $

150018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08. 3 SET $ $

150019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $

150020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $

150021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $

150022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12. 1 EACH $ $

150023 Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14. 10 EACH $ $

160000 RETURN OF GOVERNMENT MATERIALS

160001

At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order. 1 EACH $ $

170000 AS-BUILT PHOTOGRAPHS

170001

Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Task Order may be combined on one CD.) 16 EACH $ $

180000 DIVING SERVICES

180001

Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line. 5 EACH $ $

180002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings. 5 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

190000 FIELD ENGINEERING

190001 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “B”. 1 EACH $ $

190002 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “C”. 1 EACH $ $

190003 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “D”. 5 EACH $ $

191000 Labor and Materials to secure all required local, state and federal permits. 5 EACH $ $

BASE YEAR - TOTAL EVALUATED

PRICE (Line Items 100000 through 191000) $

200000 First Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the First Option Period from 1 December 2011 to 30 November 2012

210000 IMPROPER CHARACTERISTIC TASK ORDER

211000 MOBILIZATION / DEMOBILIZATION

211001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $

211002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $

211003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

211004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

211005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

211006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

211007

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

211008

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

211009

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

212000 REMOVALS – IN WATER CONSTRUCTION

212001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 8 EACH $ $

212002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 3 EACH $ $

212003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08. 3 EACH $ $

212004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $

212005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $

212006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components.

Contractor shall dispose of all other materials. 2 EACH $ $

212007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials. 4 EACH $ $

212008 Remove and dispose of one NON ATON piling using vibratory method 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

213000 Removals - Shore Construction

213001

Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $

213002

Remove sectional tower assembly and disassemble. Return all ATON hardware and reusable sectional tower components.

Contractor shall dispose of all other materials. See drawings

ATON STD 08. 3 EACH $ $

213003 Remove concrete foundation up to 6 Cubic Yards. Contractor shall dispose of all other materials. 2 EACH $ $

213004 Remove an additional 1 Cubic Yard of concrete foundation.

Contractor shall dispose of all other materials. 2

CUBIC

YARD $ $

214000 INSTALLATIONS

214100 IN WATER CONSTRUCTION - INSTALLATIONS

214101

Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $

214102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $

214103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13.

Remove and return temporary buoy. 8 EACH $ $

214104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board.

In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $

214105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy. 4 EACH $ $

214106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08. 4 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

214107 Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08. 3 EACH $ $

214108 Install a concrete pedestal foundation on a break wall. Using up to 5 Cubic Yards of concrete in accordance with drawing

ATON STD 05. 1 EACH $ $

214109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing

ATON STD 05. 1

CUBIC

YARD $ $

214110

Install a submerged obstruction concrete foundation. Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing

ATON STD 05 . 1 EACH $ $

214111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05. 1 EACH $ $

214112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $

214113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation.

Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $

214114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON

STD 01, ATON STD 02,ATON STD 03, ATON STD 04,

ATON STD 05, ATON STD 06, ATON STD 09, ATON STD

10 and ATON STD 11. 16 EACH $ $

214115 Install one (1) NON ATON steel pile using the vibratory method 1 EACH $ $

214200 SHORE CONSTRUCTION - INSTALLATION

214201 Install four “H” piles to receive a sectional tower assembly.

In accordance with drawing ATON STD 07. 1 EACH $ $

214202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 3 EACH $ $

214203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing ATON

STD 07. 3 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

214204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $

214205

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON

STD 01, ATON STD 02, ATON STD 03, ATON STD 04,

ATON STD 05 ATON STD 06, ATON STD 09, ATON STD

10 and ATON STD 11. 16 EACH $ $

214206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $

214207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $

220000 EMERGENCY TASK ORDERS

221000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

221001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $

221002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

221003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $

222000 REMOVALS

222001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02. 1 EACH $ $

222002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON

STD 04. 1 EACH $ $

222003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. 1 EACH $ $

222004

Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

222005

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $

230000 TRANSIT COSTS

230001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile

(NM). 600 NM $ $

240000 REPAIRS

240001

Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD

13 and ATON STD 14. 1 EACH $ $

240002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON

STD 12 and ATON STD 14. 1 EACH $ $

240003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, and

ATON STD 11. 1 EACH $ $

250000 MATERIALS

250001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640

LINEAR

FEET $ $

250002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $

250003 Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05.

NOTE: Steel pipe will be cost out using line item “050001”. 3 EACH $ $

250004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing ATON STD

05. 3 EACH $ $

250005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet 100

PER 10

LINEAR

FEET $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

250006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09. 5 EACH $ $

250007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10. 3 EACH $ $

250008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11. 16 EACH $ $

250009

Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11. 16 SET $ $

250010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06. 2 EACH $ $

250011

Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $

250012

Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $

250013

Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08. 3 EACH $ $

250014

Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 08. 3 EACH $ $

250015

Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10. 3 EACH $ $

250016

Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10. 3 EACH $ $

250017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing

ATON STD 08. 3 SET $ $

250018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08. 3 SET $ $

250019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON

STD 12. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED BY

UNIT PRICE)

250020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON

STD 12. 1 EACH $ $

250021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON

STD 12. 1 EACH $ $

250022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON

STD 12. 1 EACH $ $

250023 Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14. 10 EACH $ $

260000 RETURN OF GOVERNMENT MATERIALS

260001

At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order. 1 EACH $ $

270000 AS-BUILT PHOTOGRAPHS

270001

Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.) NOTE: All photos taken under one Task Order may be combined on one CD.) 16 EACH $ $

280000 DIVING SERVICES

280001

Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line. 5 EACH $ $

280002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings. 5 EACH $ $

290000 FIELD ENGINEERING

290001 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “B”. 1 EACH $ $

290002 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “C”. 1 EACH $ $

290003 Perform a geodetic survey as per the requirements of

POSITIONING METHOD “D”. 5 EACH $ $

291000 Labor and Materials to secure all required local, state

FIRST OPTION YEAR - TOTAL

EVALUATED PRICE (Line Items 200000 through 291000) $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

300000

Second Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the Second Option Period from 1 December 2012 to 30 November

310000 IMPROPER CHARACTERISTIC TASK ORDER

311000 MOBILIZATION / DEMOBILIZATION

311001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order. 2 EACH $ $

311002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order. 2 EACH $ $

311003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

311004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

311005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

311006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order. 2 EACH $ $

311007

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

311008

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction 1 EACH $ $

311009

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

312000 REMOVALS – IN WATER CONSTRUCTION

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

312001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02. 8 EACH $ $

312002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON

STD 04. 3 EACH $ $

312003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and

ATON STD 08. 3 EACH $ $

312004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 8 EACH $ $

312005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials. 2 EACH $ $

312006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 2 EACH $ $

312007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials. 4 EACH $ $

312008 Remove and dispose of one NON ATON piling using

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

313000 Removals - Shore Construction

313001

Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 4 EACH $ $

313002

Remove sectional tower assembly and disassemble.

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08. 3 EACH $ $

313003 Remove concrete foundation up to 6 Cubic Yards.

Contractor shall dispose of all other materials. 2 EACH $ $

313004 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials. 2

CUBIC

YARD $ $

314000 INSTALLATIONS

314100 IN WATER CONSTRUCTION -

INSTALLATIONS

314101

Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $

314102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 2 EACH $ $

314103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy. 8 EACH $ $

314104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy. 4 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

314105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06.

Remove and return temporary buoy. 4 EACH $ $

314106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON

STD 08. 4 EACH $ $

314107

Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON

STD 08. 3 EACH $ $

314108 Install a concrete pedestal foundation on a break wall.

Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05. 1 EACH $ $

314109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05. 1

CUBIC

YARD $ $

314110

Install a submerged obstruction concrete foundation.

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 . 1 EACH $ $

314111

Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD

05. 1 EACH $ $

314112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13. 2 EACH $ $

314113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

314114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD

06, ATON STD 09, ATON STD 10 and ATON STD

11. 16 EACH $ $

314115 Install one (1) NON ATON steel pile using the

314200 SHORE CONSTRUCTION - INSTALLATION

314201 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07. 1 EACH $ $

314202 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON

STD 07. 3 EACH $ $

314203 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing

ATON STD 07. 3 EACH $ $

314204 Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05. 3 EACH $ $

314205

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD

06, ATON STD 09, ATON STD 10 and ATON STD

11. 16 EACH $ $

314206 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire 3 EACH $ $

314207 Provide and install an additional 4 linear feet of fence. 10 EACH $ $

320000 EMERGENCY TASK ORDERS

321000 EMERGENCY MOBILIZATION /

DEMOBILIZATION:

321001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order. 1 EACH $ $

321002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order. 1 EACH $ $

321003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

322000 REMOVALS

322001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02. 1 EACH $ $

322002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04. 1 EACH $ $

322003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

Contractor shall dispose of all other materials. 1 EACH $ $

322004

Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials. 1 EACH $ $

322005

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. 1 EACH $ $

330000 TRANSIT COSTS

330001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM). 600 NM $ $

340000 REPAIRS

340001

Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14. 1 EACH $ $

EST.

QTY

UNIT

OF

ISSUE

UNIT

PRICE

EST TOTAL

EVALUATED

PRICE

(EST QTY

MULTIPLIED

BY UNIT

PRICE)

340002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD

14. 1 EACH $ $

340003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON

STD 02, ATON STD 03, ATON STD 04, ATON STD

05, ATON STD 06, and ATON STD 11. 1 EACH $ $

350000 MATERIALS

350001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF). 640

LINEAR

FEET $ $

350002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together. 16 EACH $ $

350003

Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”. 3 EACH $ $

350004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing

ATON STD 05. 3 EACH $ $

350005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet 100

PER 10

LINEAR

FEET $ $

350006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09. 5 EACH $ $

350007 Provide one fabricated…