Amendment A0004.pdf
PDF 46 KB Posted
- Solicitation number
- HSCG88-11-B-PQQ017
About this file
Amendment A0004 - Extend the due date for bid submission and provide responses to questions from prospective bidders
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A0004 6 Dec 2010 PSN 3206279
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer USCG CEU Oakland 2000 Embarcadero, Suite 200 Oakland, CA 94606
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE BIDDERS
X HSCG88-11-B-PQQ017
9B. DATE (SEE ITEM 11)
5 Nov 2010
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to extend the due date for bid submission and provide responses to questions from prospective bidders
A. SEALED OFFERS ARE DUE AT THE PLACE SPECIFIED IN ITEM 8 OF THE STANDARD FORM 1442
BY 2:00 P.M. LOCAL TIME ON 15 DECEMBER 2010.
B. Responses to Questions:
QUESTION: 01 35 29, Section 1.02 and bid item “91000” We assume the permitting requirement is per ATON structure. Please confirm.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JANICE M. PRESTON
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Invitation for Bid HSCG88-11-B-PQQ017 Amendment A0004 6 December 2010
ANSWER: The permitting requirements are per task order location. Permitting for separate structures may be required if in different geographic locations (to be confirmed with state and local permit authorities by contractor).
QUESTION: I would like to see a list, from the US Coast Guard Light List, of the ATONs proposed for replacement.
As I understand this is not an exact quantity but one that will be assessed as the project moves forward. With that in mind, perhaps a list of the ATONs to be evaluated?
ANSWER: As Per Section 01 10 00 1.04 and 1.14, aids can be replaced within these three Geographic Regions. The Government shall not provide a list of LLNRs that need to be rebuilt, but assume that there will be aids rebuilt between the LLNRs between 4255 and 7165.
Surveying costs are associated with range structures. These structures will not be determined as a rebuilt item until the task order is issued.
The contractor will not have to evaluate materiel condition at any of the aids. The general scope of the contract is to remove, fabricate, and rebuild aids as specified in task orders from the base contract.
A0004