About this file

Invitation For Bid

View the file

Other files

File Type Posted
12.16.10 HSCG8811BPQQ017 Abstract.pdf PDF
Amendment A0006.pdf PDF
Amendment A0005.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0003.pdf PDF
Amendment A0002.pdf PDF
ATON-STD-07 2of3.pdf PDF
ATON-STD-12 1of2.pdf PDF
ATON-STD-07 3of3.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0001.pdf PDF
Appendix A _Work Windows for AOR.pdf PDF
Amendment A0001.pdf PDF
ATON-STD-07 1of3.pdf PDF
ATON-STD-13.pdf PDF
ATON-STD-12 2of2.pdf PDF
Wage_Decision_No_CA20100029.pdf PDF
Drawings.pdf PDF
Contractor's Responsibility Questionnaire.pdf PDF
Contractor's Request for Clarification.pdf PDF
Specifications.pdf PDF
Wage_Decision_No_CA20100009.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation For Bid Number: HSCG88-10-B-PQQ017

To access pages 1 & 2 of Standard Form (SF) 1442, double-click on the above icon.

After obtaining the SF 1442, close the document and continue scrolling down from this point to obtain the remainder of the Invitation For Bid (IFB).

YOU MUST RETURN THE FOLLOWING. FAILURE TO DO SO MAY DEEM YOUR BID NON-RESPONSIVE

A. ONE (1) COMPLETE COPY OF THE STANDARD FORM 1442 (SOLICITATION OFFER AND AWARD) AND ALL AMENDMENTS

B. SECTION B (SCHEDULE OF PRICES)

C. SECTION K (REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFEROR’S)

D. CONTRACTOR’S RESPONSIBILITY QUESTIONNAIRE.

E. BID BOND (STANDARD FORM 24) IN THE AMOUNT OF $10,000

PLEASE MAIL YOUR BID TO THE FOLLOWING ADDRESS:

CONTRACTING OFFICER

IFB HSCG88-11-B-PQQ017

USCG Civil Engineering Unit 2000 Embarcadero, Suite 200 Oakland, CA 94606-5337

Please do not call to inquire about the status of your bid as this information will not be released.

NOTICE FOR FILING AGENCY PROTESTS

It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe that a Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:

Commandant (CG-9131) 2100 2nd Street, SW, Room 2606 Washington, D.C. 20593 Telephone (202) 372-3692 Fax: (202) 372-3949

SECTION B

SCHEDULE OF PRICES

CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
100000
Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard in accordance with specifications and drawings for the

Base Period from DATE OF AWARD to November 30, 2011

110000
IMPROPER CHARACTERISTIC TASK ORDER
111000
MOBILIZATION / DEMOBILIZATION
111001
Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order.
2
EACH
$
$
111002
Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.
2
EACH
$
$
111003
Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
111004
Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
111005
Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
111006
Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
111007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
111008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
111009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
112000
REMOVALS – IN WATER CONSTRUCTION
112001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
8
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
112002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
3
EACH
$
$
112003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.
3
EACH
$
$
112004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
8
EACH
$
$
112005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
2
EACH
$
$
112006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
2
EACH
$
$
112007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
4
EACH
$
$
112008
Remove and dispose of one NON ATON piling using vibratory method
1
EACH
$
$
113000
Removals - Shore Construction
113001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
4
EACH
$
$
113002
Remove sectional tower assembly and disassemble. Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
113003
Remove concrete foundation up to 6 Cubic Yards. Contractor shall dispose of all other materials.
2
EACH
$
$
113004
Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials.
2
CUBIC YARD
$
$
114000
INSTALLATIONS
114100
IN WATER CONSTRUCTION - INSTALLATIONS
114101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
114102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
2
EACH
$
$
114103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
114104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
4
EACH
$
$
114105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.
4
EACH
$
$
114106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08.
4
EACH
$
$
114107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
114108
Install a concrete pedestal foundation on a break wall. Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.
1
EACH
$
$
114109
Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.
1
CUBIC YARD
$
$
114110
Install a submerged obstruction concrete foundation. Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .
1
EACH
$
$
114111
Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.
1
EACH
$
$
114112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.
2
EACH
$
$
114113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.
1
EACH
$
$
114114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
114115
Install one (1) NON ATON steel pile using the vibratory method
1
EACH
$
$
114200
SHORE CONSTRUCTION - INSTALLATION
114201
Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
1
EACH
$
$
114202
Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
114203
Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
114204
Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05.
3
EACH
$
$
114205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
114206
Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire
3
EACH
$
$
114207
Provide and install an additional 4 linear feet of fence.
10
EACH
$
$
120000
EMERGENCY TASK ORDERS
121000
EMERGENCY MOBILIZATION / DEMOBILIZATION:
121001
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order.
1
EACH
$
$
121002
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
121003
Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order.
1
EACH
$
$
122000
REMOVALS
122001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
1
EACH
$
$
122002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
1
EACH
$
$
122003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
122004
Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
1
EACH
$
$
122005
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
1
EACH
$
$
130000
TRANSIT COSTS
130001
A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM).
600
NM
$
$
140000
REPAIRS
140001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14.
1
EACH
$
$
140002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.
1
EACH
$
$
140003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, and ATON STD 11.
1
EACH
$
$
150000
MATERIALS
150001
Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF).
640
LINEAR FEET
$
$
150002
Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.
16
EACH
$
$
150003
Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
150004
Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing ATON STD 05.
3
EACH
$
$
150005
Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet
100
PER 10 LINEAR FEET
$
$
150006
Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.
5
EACH
$
$
150007
Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.
3
EACH
$
$
150008
Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.
16
EACH
$
$
150009
Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.
16
SET
$
$
150010
Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.
2
EACH
$
$
150011
Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
150012
Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
150013
Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
150014
Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 08.
3
EACH
$
$
150015
Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
150016
Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10.
3
EACH
$
$
150017
Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.
3
SET
$
$
150018
Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.
3
SET
$
$
150019
Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
150020
Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
150021
Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
150022
Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
150023
Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14.
10
EACH
$
$
160000
RETURN OF GOVERNMENT MATERIALS
160001
At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order.
1
EACH
$
$
170000
AS-BUILT PHOTOGRAPHS
170001
Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.) NOTE: All photos taken under one Task Order may be combined on one CD.)
16
EACH
$
$
180000
DIVING SERVICES
180001
Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.
5
EACH
$
$
180002
Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.
5
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
190000
FIELD ENGINEERING
190001
Perform a geodetic survey as per the requirements of POSITIONING METHOD “B”.
1
EACH
$
$
190002
Perform a geodetic survey as per the requirements of POSITIONING METHOD “C”.
1
EACH
$
$
190003
Perform a geodetic survey as per the requirements of POSITIONING METHOD “D”.
5
EACH
$
$

BASE YEAR - TOTAL EVALUATED PRICE (Line Items 100000 through 190003)

200000
First Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the First Option Period from 1 December 2011 to 30 November 2012
210000
IMPROPER CHARACTERISTIC TASK ORDER
211000
MOBILIZATION / DEMOBILIZATION
211001
Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order.
2
EACH
$
$
211002
Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.
2
EACH
$
$
211003
Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
211004
Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
211005
Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
211006
Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
211007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
211008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
211009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
212000
REMOVALS – IN WATER CONSTRUCTION
212001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
8
EACH
$
$
212002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
3
EACH
$
$
212003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.
3
EACH
$
$
212004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
8
EACH
$
$
212005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
2
EACH
$
$
212006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
2
EACH
$
$
212007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
4
EACH
$
$
212008
Remove and dispose of one NON ATON piling using vibratory method
1
EACH
$
$
213000
Removals - Shore Construction
213001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
4
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
213002
Remove sectional tower assembly and disassemble. Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.
3
EACH
$
$
213003
Remove concrete foundation up to 6 Cubic Yards. Contractor shall dispose of all other materials.
2
EACH
$
$
213004
Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials.
2
CUBIC YARD
$
$
214000
INSTALLATIONS
214100
IN WATER CONSTRUCTION - INSTALLATIONS
214101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
214102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
2
EACH
$
$
214103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
214104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
4
EACH
$
$
214105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.
4
EACH
$
$
214106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08.
4
EACH
$
$
214107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08.
3
EACH
$
$
214108
Install a concrete pedestal foundation on a break wall. Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
214109
Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.
1
CUBIC YARD
$
$
214110
Install a submerged obstruction concrete foundation. Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .
1
EACH
$
$
214111
Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.
1
EACH
$
$
214112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.
2
EACH
$
$
214113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.
1
EACH
$
$
214114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
214115
Install one (1) NON ATON steel pile using the vibratory method
1
EACH
$
$
214200
SHORE CONSTRUCTION - INSTALLATION
214201
Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
1
EACH
$
$
214202
Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
214203
Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
214204
Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05.
3
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
214205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
214206
Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire
3
EACH
$
$
214207
Provide and install an additional 4 linear feet of fence.
10
EACH
$
$
220000
EMERGENCY TASK ORDERS
221000
EMERGENCY MOBILIZATION / DEMOBILIZATION:
221001
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order.
1
EACH
$
$
221002
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
221003
Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order.
1
EACH
$
$
222000
REMOVALS
222001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
1
EACH
$
$
222002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
1
EACH
$
$
222003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials.
1
EACH
$
$
222004
Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
222005
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
1
EACH
$
$
230000
TRANSIT COSTS
230001
A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM).
600
NM
$
$
240000
REPAIRS
240001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON STD 12, ATON STD 13 and ATON STD 14.
1
EACH
$
$
240002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.
1
EACH
$
$
240003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, and ATON STD 11.
1
EACH
$
$
250000
MATERIALS
250001
Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF).
640
LINEAR FEET
$
$
250002
Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.
16
EACH
$
$
250003
Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.
3
EACH
$
$
250004
Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing ATON STD 05.
3
EACH
$
$
250005
Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06. Priced per 10 linear feet
100
PER 10 LINEAR FEET
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
250006
Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.
5
EACH
$
$
250007
Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.
3
EACH
$
$
250008
Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.
16
EACH
$
$
250009
Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.
16
SET
$
$
250010
Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.
2
EACH
$
$
250011
Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
250012
Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
250013
Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON STD 08.
3
EACH
$
$
250014
Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 08.
3
EACH
$
$
250015
Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10.
3
EACH
$
$
250016
Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing ATON STD 10.
3
EACH
$
$
250017
Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.
3
SET
$
$
250018
Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.
3
SET
$
$
250019
Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
250020
Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
250021
Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
250022
Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
1
EACH
$
$
250023
Provide a manufactured cable type Safety Climb Device. In accordance with drawing ATON STD 14.
10
EACH
$
$
260000
RETURN OF GOVERNMENT MATERIALS
260001
At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order.
1
EACH
$
$
270000
AS-BUILT PHOTOGRAPHS
270001
Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.) NOTE: All photos taken under one Task Order may be combined on one CD.)
16
EACH
$
$
280000
DIVING SERVICES
280001
Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.
5
EACH
$
$
280002
Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.
5
EACH
$
$
290000
FIELD ENGINEERING
290001
Perform a geodetic survey as per the requirements of POSITIONING METHOD “B”.
1
EACH
$
$
290002
Perform a geodetic survey as per the requirements of POSITIONING METHOD “C”.
1
EACH
$
$
290003
Perform a geodetic survey as per the requirements of POSITIONING METHOD “D”.
5
EACH
$
$

FIRST OPTION YEAR - TOTAL EVALUATED PRICE (Line Items 200000 through 290003)

CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
300000
Second Option Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the San Francisco Bay and Surrounding Waters for the US Coast Guard for the Second Option Period from 1 December 2012 to 30 November 2013
310000
IMPROPER CHARACTERISTIC TASK ORDER
311000
MOBILIZATION / DEMOBILIZATION
311001
Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order.
2
EACH
$
$
311002
Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.
2
EACH
$
$
311003
Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
311004
Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
311005
Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
311006
Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.
2
EACH
$
$
311007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
311008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
311009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
1
EACH
$
$
312000
REMOVALS – IN WATER CONSTRUCTION
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
312001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
8
EACH
$
$
312002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions. Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
3
EACH
$
$
312003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.
3
EACH
$
$
312004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
8
EACH
$
$
312005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
2
EACH
$
$
312006
Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
2
EACH
$
$
312007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
4
EACH
$
$
312008
Remove and dispose of one NON ATON piling using vibratory method
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
313000
Removals - Shore Construction
313001
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.
4
EACH
$
$
313002
Remove sectional tower assembly and disassemble. Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.
3
EACH
$
$
313003
Remove concrete foundation up to 6 Cubic Yards. Contractor shall dispose of all other materials.
2
EACH
$
$
313004
Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials.
2
CUBIC YARD
$
$
314000
INSTALLATIONS
314100
IN WATER CONSTRUCTION - INSTALLATIONS
314101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
314102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
2
EACH
$
$
314103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
8
EACH
$
$
314104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
4
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
314105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.
4
EACH
$
$
314106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08.
4
EACH
$
$
314107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08.
3
EACH
$
$
314108
Install a concrete pedestal foundation on a break wall. Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.
1
EACH
$
$
314109
Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.
1
CUBIC YARD
$
$
314110
Install a submerged obstruction concrete foundation. Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .
1
EACH
$
$
314111
Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.
1
EACH
$
$
314112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.
2
EACH
$
$
314113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
314114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON STD 03, ATON STD 04, ATON STD 05, ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
314115
Install one (1) NON ATON steel pile using the vibratory method
1
EACH
$
$
314200
SHORE CONSTRUCTION - INSTALLATION
314201
Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
1
EACH
$
$
314202
Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
314203
Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
3
EACH
$
$
314204
Install a concrete pedestal foundation on a land location. As per drawing ATON STD 05.
3
EACH
$
$
314205
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 ATON STD 06, ATON STD 09, ATON STD 10 and ATON STD 11.
16
EACH
$
$
314206
Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire
3
EACH
$
$
314207
Provide and install an additional 4 linear feet of fence.
10
EACH
$
$
320000
EMERGENCY TASK ORDERS
321000
EMERGENCY MOBILIZATION / DEMOBILIZATION:
321001
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order.
1
EACH
$
$
321002
Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order.
1
EACH
$
$
321003
Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order.
1
EACH
$
$
CLIN NO.
DESCRIPTION
EST. QTY
UNIT OF ISSUE
UNIT PRICE
EST TOTAL EVALUATED PRICE (EST QTY MULTIPLIED BY UNIT PRICE)
322000
REMOVALS
322001

This is the start of the file's text. The full file is on GovTribe.