About this file

Amendment A0006 - Response to question from prospective bidder

View the file

Other files

File Type Posted
12.16.10 HSCG8811BPQQ017 Abstract.pdf PDF
Amendment A0005.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0003.pdf PDF
Amendment A0002.pdf PDF
ATON-STD-07 2of3.pdf PDF
ATON-STD-12 1of2.pdf PDF
ATON-STD-07 3of3.pdf PDF
SECTION B - Schedule of Prices_Amendment_A0001.pdf PDF
Appendix A _Work Windows for AOR.pdf PDF
Amendment A0001.pdf PDF
ATON-STD-07 1of3.pdf PDF
ATON-STD-13.pdf PDF
ATON-STD-12 2of2.pdf PDF
Wage_Decision_No_CA20100029.pdf PDF
Drawings.pdf PDF
Contractor's Responsibility Questionnaire.pdf PDF
Contractor's Request for Clarification.pdf PDF
Specifications.pdf PDF
Wage_Decision_No_CA20100009.pdf PDF
Invitation_For_Bid.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A0006 8 Dec 2010 PSN 3206279

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG CEU Oakland 2000 Embarcadero, Suite 200 Oakland, CA 94606

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE BIDDERS

X HSCG88-11-B-PQQ017

9B. DATE (SEE ITEM 11)

5 Nov 2010

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide responses to questions from prospective bidders

A. Response to Question:

QUESTION: I have talked with Fiberglass grating manufacturers and they have said that they do not have a molded 1 ½” x 1 ½” x 1 ½” fiberglass grating that will meet the .37 deflection. The largest clear span is 54” with a .42 deflection. They also said that changing the resins will not strengthen. Can we go with a 54” open span with a .42 or add a beam or change to a protruded grating that will meet the deflection spec.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JANICE M. PRESTON

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Invitation for Bid HSCG88-11-B-PQQ017 Amendment A0006 8 December 2010

ANSWER: Change to Section 06 71 00, Paragraph 2.01.A:

Change:

"For Four-pipe pile 10ft x 10ft platform, grating shall be chosen based on a 60 inch clear span using a 50 lb/ft2 Uniform Live Load with deflection in accordance with code ACI 318-9.5."

To:

"For Four-pipe pile 10ft x 10ft platform, grating shall be chosen based on a 60 inch clear span using a 50 pounds per square foot load, where the mesh does not exceed a deflection of more than 0.45 inches. The mesh may be no less than 1-1/2" x 1-1/2" x 1-1/2"."

A0006