SOLICITATION NO. HSCG85-15-Q-P45P58

AMENDMENT NO. 0005

SF 30 CONTINUATION SHEET

1. The purpose of this amendment is to include the revised Continuation of Combined Synopsis/Solicitation to reflect the following changes:

a. Foreseeable Cost Factors Pertaining to different shipyard location, Page 35, Paragraph (a) (3) has been changed to include the following:

(3) Facility costs to navigate vessel between its home pier and the Contractor’s offered place of performance (one way trip) is $78.37 per nautical mile. Foreseeable cost will not be applied as long as the proposed contractor facility location is en route to Long Beach, CA.

b. Based on the changes to the above paragraph of the solicitation, the attached reflects the revised continuation of the combined synopsis/solicitation.

2. The date for submission of quotes remains unchanged.

Offerors must acknowledge receipt of all amendment by completing blocks 8 and 15A through 15C.