ADDITIONAL_RESPONSE_TO_QUESTIONS-AMEND_0007.doc

DOC document 31 KB Posted

Attached to
USCGC SPAR (WLM 206)-FY15 Unplanned Dry Dock Repairs
Solicitation number
HSCG85-15-Q-P45P58
Issued by

About this file

AMENDMENT NO. 0007 Response to questions

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL RESPONSE TO QUESTIONS

USCG SPAR (WLB 206) FY 15 UNPLANNED DRY DOCK REPAIRS

SOLICITATION NO. HSCG85-15-Q-P45P58 –AMENDMENT NO. 0007

QUESTION NO. 1

ITEM NO. 008 – U/W Body, Preserve (Partial –Condition B)

Paragraph No. 3.2.2

Paragraph 1.1 Instructs Contractor to “Preserve up to 400 square feet of the U/W body surfaces”

Paragraph 3.2.2.1.1 instructs Contractor to “Selectively remove all existing AF top-coating from the entire underwater body”

Contractor would like to know what is the Government’s intent?

RESPONSE: USCG intent is to replace missing underbody coating system, around 400 sf is missing. Contractor would only replace missing coating system.

QUESTION NO. 2

ITEM NO. 008 – U/W Body, Preserve (Partial –Condition B)

Paragraph No. 2

Paragraph 2, References, lists Coast Guard Drawing 41 UT 0103-002, Rev A, Outboard Profile & Dk Plan, This is a 41 foot Utility Boat drawing. Is this the correct reference that the Government would like the Contractor to use for the 225 foot Spar?

Also, Paragraph 4. Notes, uses the same drawing reference for the Definitions of Partial Conditions?

RESPONSE: Disregard this reference and review Specification –REV3, dated 21 July 2015

File details come from the government source that posted it. Updated .