Amendment0005_14RP45004.pdf
PDF 335 KB Posted
- Attached to
- CGC KUKUI FY14 DRYDOCKING & REPAIRS
- Solicitation number
- HSCG85-14-R-P45004
About this file
Amendment 0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSCG85-14-R-P45004_Kukui_DD14_Schedule_of_Supplies_(AMD_0010).xls | XLS spreadsheet | |
| Amendment0010_14RP45004.pdf | ||
| Amendment0009_14RP45004.pdf | ||
| Amendment0008_14RP45004.pdf | ||
| FL_2605_29_2_-_G_(Q017).zip | ZIP file | |
| Amendment0007_14RP45004.pdf | ||
| 225-WLB_583_1_(Q021).zip | ZIP file | |
| Amendment0006_14RP45004.pdf | ||
| Kukui_HVAC_(Q016).zip | ZIP file | |
| 225-WLB_601_1_5_-_U_with_markup.pdf | ||
| Amendment0004_14RP45004.pdf | ||
| KUK_Q006_225-WLB_601_2.zip | ZIP file | |
| Amendment0003_14RP45004.pdf | ||
| Amendment0002_14RP45004.pdf | ||
| KUK_Q011_225B-WLB_243_1_and_2.zip | ZIP file | |
| KUK_Q002_Flooring_Pics.zip | ZIP file | |
| Amendment0001_14RP45004.pdf | ||
| HSCG85-14-R-P45004_Kukui_DD14_Solicitation.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_Specification.pdf | ||
| HSCG85-14-R-P45004_Kukui_DD14_Clarification_Request_Form.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_PP_Questionnaire.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_Schedule_of_Supplies.xls | XLS spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0005 24 OCT 13 21-14-854P45004
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-14-R-P45004
9B. DATE (SEE ITEM 11)
10 OCT 13
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USCGC KUKUI (WLB 203) FY14 DRYOCKING & REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
HSCG85-14-R-P45004 Amendment 0005
1. Response(s) to Request(s) for Clarification 0013 - 0015 is/are provided as Attachment A.
2. Offerors shall note the addition of subparagraph f) in paragraph 3. below.
3. There is no change to the proposal closing date, which remains as follows:
13 NOV 13 (1100 Pacific)
A responsive proposal shall consist of the following:
a) Signed & dated SF1449 (2 pages) and any Amendments
b) Completed Provision (2) Info Regarding Responsibility Matters
c) Completed Provision (4) Prohibition…Corporate Expatriates
d) Any qualifications to FAR 52.212-3 (otherwise SFLC will consider your System for Award Management registration (formerly ORCA) current, accurate, complete, and applicable (zero pages if no qualifications). Make sure your registration in SAM.gov is current and accurate.
e) Completed Electronic Spreadsheet Schedule of Supplies (1 page – submit electronically as a spreadsheet)
f) Completed Provision (21) Pre-Award Drydock Certifications….Calculations
As an alternative to the instructions at (17) FAR 52.212-1 INSTRUCTIONS TO OFFERORS, you are encouraged to email your proposal to the individual in Block 7.a. at james.s.altice@uscg.mil. Please economize on the size of your emailed submission and please confirm receipt.
4. Shipchecks may be arranged by contacting vessel’s Engineering Officer, CWO Jonathan Mills. He can be reached via the following methods:
Ship’s Main Switchboard (808) 842-2860 Email: Jonathan.M.Mills2@uscg.mil
Date: 10-23-13
Question No. 0013
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC KUKUI (WLB 203) FY14 DRYDOCKING AND REPAIRS
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. O-65 PARA NO. 3.2
TITLE: Deck Covering (Interior Wet/Dry), Renew
QUESTION:
Par. 3.2, Table 1, requires flooring renewal in Passageway 02-57-01-L. CG GA drawing 225-WLB- 601-001, Rev. U (as received with solicitation) appears to show 02-57-01-L as the Commanding Officer’s cabin. Request review and clarification (Note: Passageway appears as 02-61-2-L on GA received).
RESPONSE:
See drawing 225-WLB_601_1_5_-_U with markup, furnished as an attachment to Amendment 0005.
Date: 10-23-013
Question No. 0014
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. 0-63
PARA NO.
3.2.1
TITLE: Decks upper level bow thruster preserve
In item O-63 parg. 3.2.1 can the Coast Guard supply a picture of the fwd bulkhead that shows the kick plate that is to be removed or supply drawings that show it?
There is approximately 14 ft, (~7 feet fwd of each HPU). Please see attached photos.
Date: 10-24-13
Question No. 0015
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. D-77 PARA NO. 1.1
TITLE: Vent Duct Systems, Renew
Par. 1.1: Where table description uses the following language: “Renew Airlift Gooseneck and Spool from deck Spool…” contractor notes referenced drawings received do not appear to show inline spool pieces above deck pen’s and requests confirmation scope is to renew gooseneck & deck pen spool piece.
The intent is to replace the spool pieces and goosenecks as indicated in the table.
The attached drawing 512‐12 sheet 13 shows typical deck or bhd spool assembly.
File details come from the government source that posted it. Updated .