Amendment0003_14RP45004.pdf
PDF 32 KB Posted
- Attached to
- CGC KUKUI FY14 DRYDOCKING & REPAIRS
- Solicitation number
- HSCG85-14-R-P45004
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSCG85-14-R-P45004_Kukui_DD14_Schedule_of_Supplies_(AMD_0010).xls | XLS spreadsheet | |
| Amendment0010_14RP45004.pdf | ||
| Amendment0009_14RP45004.pdf | ||
| Amendment0008_14RP45004.pdf | ||
| FL_2605_29_2_-_G_(Q017).zip | ZIP file | |
| Amendment0007_14RP45004.pdf | ||
| 225-WLB_583_1_(Q021).zip | ZIP file | |
| Amendment0006_14RP45004.pdf | ||
| Kukui_HVAC_(Q016).zip | ZIP file | |
| 225-WLB_601_1_5_-_U_with_markup.pdf | ||
| Amendment0005_14RP45004.pdf | ||
| Amendment0004_14RP45004.pdf | ||
| KUK_Q006_225-WLB_601_2.zip | ZIP file | |
| Amendment0002_14RP45004.pdf | ||
| KUK_Q011_225B-WLB_243_1_and_2.zip | ZIP file | |
| KUK_Q002_Flooring_Pics.zip | ZIP file | |
| Amendment0001_14RP45004.pdf | ||
| HSCG85-14-R-P45004_Kukui_DD14_Solicitation.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_Specification.pdf | ||
| HSCG85-14-R-P45004_Kukui_DD14_Clarification_Request_Form.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_PP_Questionnaire.doc | DOC document | |
| HSCG85-14-R-P45004_Kukui_DD14_Schedule_of_Supplies.xls | XLS spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 23 OCT 13 21-14-854P45004
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-14-R-P45004
9B. DATE (SEE ITEM 11)
10 OCT 13
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USCGC KUKUI (WLB 203) FY14 DRYOCKING & REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
HSCG85-14-R-P45004 Amendment 0003
1. Response(s) to Request(s) for Clarification 0004, 0009 & 0010 is/are provided as Attachment A.
2. There is no change to the proposal closing date, which remains as follows:
13 NOV 13 (1100 Pacific)
A responsive proposal shall consist of the following:
a) Signed & dated SF1449 (2 pages) and any Amendments
b) Completed Provision (2) Info Regarding Responsibility Matters
c) Completed Provision (4) Prohibition…Corporate Expatriates
d) Any qualifications to FAR 52.212-3 (otherwise SFLC will consider your System for Award Management registration (formerly ORCA) current, accurate, complete, and applicable (zero pages if no qualifications). Make sure your registration in SAM.gov is current and accurate.
e) Completed Electronic Spreadsheet Schedule of Supplies (1 page – submit electronically as a spreadsheet)
As an alternative to the instructions at (17) FAR 52.212-1 INSTRUCTIONS TO OFFERORS, you are encouraged to email your proposal to the individual in Block 7.a. at james.s.altice@uscg.mil. Please economize on the size of your emailed submission and please confirm receipt.
3. Shipchecks may be arranged by contacting vessel’s Engineering Officer, CWO Jonathan Mills. He can be reached via the following methods:
Ship’s Main Switchboard (808) 842-2860 Email: Jonathan.M.Mills2@uscg.mil
Date: 10-17-13
Question No. 0004
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC KUKUI (WLB 203) FY14 DRYDOCKING AND REPAIRS
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. D-08
PARA NO.
3.2, Line 5
TITLE: Cargo Hatch (Hydraulic), Overhaul and Repair
QUESTION:
1) Item table, Line 5, requires renewal of all backing plates. Cargo hatch TP 3717 drawing D-WK- 831-2, Pc 16 (Qty = 1), associated with the lift cylinder mount, is the only part found in reference TP with “backing plate” nomenclature. Request confirmation this is the backing plate requiring renewal or clarification of what TP 3717 parts might also pertain (hatch dogging wedges, retainers, etc?)
RESPONSE:
Item 22, 23, 25 of D-WK-831-3
Date: 10/22/2013
Question No. 0009
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: Specifications PARA NO.
WORK ITEM NO. 8 PARA NO.
TITLE:
Work Item 8: Cargo Hatch (Hydraulic), Overhaul and Repair
# 5 of ¶ 3.3: For estimating purposes can a part number and the IAW drawing be supplied referencing the renewal of all of the backing plates?
# 6 of ¶ 3.3: Reference TP 3717 indicates that the hinge mounting plates are GFE. Do these components require paint stripping, NDT and re-preservation?
# 8 of ¶ 3.3: Please identify quantities and sizes of all hinge and cylinder bushings to renewed that are not identified on the drawings in TP 3717
Item 22, 23, 25 of D-WK-831-3
Hinges will be provided as GFE. Hinge mounting plates will require NDT and preservation.
All are identified in TP 3717
Date: 10/22/2013
Question No. 0010
RFP No.: HSCG85-14-R-P45004
SOLICITATION SECTION: Specifications PARA NO. All
WORK ITEM NO. 9, PARA NO.
TITLE: Propulsion Shaft Bearings & Seals
a. Is there any indication in the ships machinery record as to whether the tail shaft bearing running sleeve has been undercut and oversized staves have been installed? If so, can the Government provide an approved method of pulling and reinstalling the tail shaft and tail shaft bearing assembly at the same time?
There is no indication that the sleeve has been previously cut or oversized staves installed. If there is, best method is removing the bearing assembly at the same time by strapping the bearing assembly together and pulling it at the same time as the shaft.
File details come from the government source that posted it. Updated .