Amendment0003_13RP30T85.pdf

PDF 32 KB Posted

Attached to
CGC SEQUOIA FY13 DRYDOCKING & REPAIRS Federal contract opportunity
Solicitation number
HSCG85-13-R-P30T85
Issued by
Department of Homeland Security US Coast Guard

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to CGC SEQUOIA FY13 DRYDOCKING & REPAIRS, newest first.
File Type Posted
HSCG85-13-R-P30T85_Sequoia_Schedule_of_Supplies_(AMD_0009).xls XLS spreadsheet
225B-WLB_512_12_57_-_-.dwf DWF file
Work_Item_88_Main_Diesel_Engines _Alignment_Check.pdf PDF
Amendment0009_13RP30T85.pdf PDF
225B-WLB_512_12_56_-_-.dwf DWF file
Amendment0008_13RP30T85.pdf PDF
SEQ_Q018_WI-077_Drawings.zip ZIP file
SEQ_Q020_WI-047_Drawings.zip ZIP file
SEQ_Q022_WI-071_Drawings.zip ZIP file
Amendment0007_13RP30T85.pdf PDF
HSCG85-13-R-P30T85_Sequoia_Specification_(AMD_0007).pdf PDF
HSCG85-13-R-P30T85_Sequoia_Schedule_of_Supplies_(AMD_0007).xls XLS spreadsheet
Amendment0006_13RP30T85.pdf PDF
SEQ_Q015_WI-064_225B_WLB_509_1.zip ZIP file
Amendment0005_13RP30T85.pdf PDF
SEQ_Q013_WI-057_225_WLB_561_5.zip ZIP file
Amendment0004_13RP30T85.pdf PDF
225B-WLB_512_Dwgs.zip ZIP file
Amendment0002_13RP30T85.pdf PDF
tp3548EandG.zip ZIP file
SFLCStdSpec3101.pdf PDF
Amendment0001_13RP30T85.pdf PDF
HSCG85-13-R-P30T85_Sequoia_Specification.pdf PDF
HSCG85-13-R-P30T85_Sequoia_PP_Questionnaire.doc DOC document
HSCG85-13-R-P30T85_Sequoia_Solicitation.doc DOC document
HSCG85-13-R-P30T85_Sequoia_Schedule_of_Supplies.xls XLS spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 02 NOV 12 21-13-853P45T85

6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER

SURFACE FORCES LOGISTICS CENTER C&P2

1301 CLAY ST. STE 807N

OAKLAND, CA 94612-5217

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

HSCG85-13-R-P30T85

9B. DATE (SEE ITEM 11)

18 OCT 12

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

USCGC SEQUOIA (WLB 215) FY13 DRYDOCKING REPAIRS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2

HSCG85-13-R-P30T85 Amendment 0003

1. Response(s) to Request(s) for Clarification 0004 – 0007 is/are provided as Attachment A.

2. Due to administrative error, Amendment 0002 indicated “0001” in Block 2 of that amendment. Offeror’s shall pen and ink or electronically edit Block 2 of that amendment to indicate “0002.”

3. There is no change to the proposal closing date, which remains as follows:

14 NOV 12 (1100 Pacific)

A responsive proposal shall consist of the following:

a) Signed & dated SF1449 (2 pages) and any Amendments

b) Completed Provision (26) Pre-Award Drydock Certs & Calcs

c) Completed Provision (33) Place of Performance (1 page)

d) Completed Provision (3) Info Regarding Responsibility Matters

e) Completed Provision (5) Prohibition…Corporate Expatriates

f) Any qualifications to FAR 52.212-3 (otherwise SFLC will consider your ORCA registration current, accurate, complete, and applicable (zero pages if no qualifications). Make sure your registration in SAM.gov is current and accurate.

g) Completed Electronic Spreadsheet Schedule of Supplies (1 page - submit electronically as a spreadsheet)

In addition to the requirements at (22) FAR 52.212-1 INSTRUCTIONS TO OFFERORS, you are encouraged to email a scanned copy of your proposal to the individual in Block 7.a.

at james.s.altice@uscg.mil. Please economize on the size of your emailed submission and please confirm receipt.

4. Shipchecks may be arranged by contacting vessel’s Engineering Officer, CWO Wendy Titensor. She can be reached via the following methods:

Ship’s Main Switchboard (671) 355-4885 Cell Phone (671) 688-0741 Email: Gwendolyn.A.Titensor@uscg.mil

ATTACHMENT A

Date: 11/1/12

Question No. 0008

REQUEST FOR CLARIFICATION

SHIP & HULL No.: CGC SEQUOIA (WLB 215) FY13 DRYDOCKING

RFP No.: HSCG85-13-R-P30T85

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 46 PARA NO. 3.2.1

TITLE: U/W Body, Preserve “Partial Condition C

QUESTION:

The contractor is to lightly clean the designated surfaces by water jetting (SSPC-SP-12/NACE No. 5 or abrasive off blasting SSPC-SP-7 NACE No. 4 to move all visible oil, grease, dirt, loose mill scale.

Loose rust and loose antifouling. For estimating what percentage of the under water hull will require blasting?

Condition B covered 100% of the underwater hull by water jetting (SSPC-SP-12/NACE No. 5 or Abrasive off blasting SSPC-SP-7 NACE No. 4

RESPONSE:

For condition “C”, assume that up to 100% of the underbody AF coating will require at least a brush blast to remove all contaminants from the tightly adhered AF prior to application of new coating.

Condition B differs in that it requires the removal of all AF coating down to the AC layer whereas Condition C is less intrusive but the square footage remains similar but with a less aggressive blast required.

Question No. 0009

RFP No.: HSCG85-13-R-P30T85

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 50 PARA NO. 3.2

TITLE: DRY DOCKING

SFLC STANDARD SPECIFICATION 8634 Paragraph 3.4.4.2. Requires the contractor to remove all marine growth from the entire underwater hull. Cleaning shall be supplemented with stiff bristle brushes and scrapers as necessary to remove all visible marine growth. For estimating can the ship supply any picture showing marine growth or what percentage of underwater hull will require scraping to remove marine growth?

Generally, hard marine growth requiring scraping is limited to a 4-6ft area around the circumference of the ship along the water line. There is generally less hard marine growth underneath that band.

Question No. 0010

RFP No.: HSCG85-13-R-P30T85

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 62 PARA NO. 3.2.1

TITLE:

Bilge (machinery space) stern thruster Machinery room preserve

For estimating what percentage of the bilge will require water jetting (SSPC-SP-12 NACE N0.5) or power tool cleaning (SSPC-SP-11) ?

100% of bilge surfaces, including adjacent structural framing and deck plates require SSPC-SP-11 or SSPC-SP12 preparation. Areas to be preserved include those at deck plate level and below.

File details come from the government source that posted it. Updated .