TECHNICAL EVALUATION CRTERIA.doc
DOC document 33 KB Posted
- Solicitation number
- HSCG85-11-R-P45GH2
About this file
PAST PERFORMANCE EVALUATION CRITERIA HSCG85-11-R-P45GH2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOUTWELL _WHEC_378W__DS_BJR_11R2 | — | |
| Page 2 - A002.doc | DOC document | |
| Section B | — | |
| Page 6 | — | |
| SF 30-A002.doc | DOC document | |
| 53712 Horizontal joint inspection 1SME upper 1 thru 12.pdf | ||
| SF3-A001.doc | DOC document | |
| BOUTWELL _WHEC_378W__DS_BJR_11R1 | — | |
| Boutwell liner visual inspection 11-2-10.pdf | ||
| Revised Page 45 of Sol..doc | DOC document | |
| 53712 Horizontal joint inspection 1SME upper 13 thru 14.pdf | ||
| Page 2 - A001.doc | DOC document | |
| Request for Clarification | — | |
| NOTICE TO OFFERORS(BOUTWELL).doc | DOC document | |
| BOUTWELL _WHEC_378W__DS_BJR_11R0.pdf | ||
| Solicitation Pkg | — | |
| SF1449 -BOUTWELL.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal (RFP)
HSCG85-11-R-P45GH2
Dock Repairs, Main Diesel Engine Repairs, of CGC BOUTWELL (WHEC 719)
PAST PERFORMANCE CRITERIA
CATEGORY A: PAST PERFORMANCE
A.1 In accordance with FAR 15.305(a)(2)(1), the offeror is required to identify past or current contracts (including Federal, State, and local government and/or private) for efforts similar to the Government requirement for this availability. The government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror’s past performance. The offeror is further reminded that the source selection authority shall determine the relevance of similar past performance information. The offeror shall limit this information to no more than five contracts performed within the last three years, each listed separately. The offeror is requested to provide this information in the following format for each contract:
a. Contract number, and agency point of contact and telephone number;
b. Ship name, hull number, type, and displacement;
c. Type of availability (dry dock, dockside, etc.), description of work items, and where performed;
d. Original contract commencement and completion dates, actual commencement and completion dates, and explanation of (i.e. reasons for) schedule slippage/extensions, if any;
e. Award and final (award plus growth) contract prices, including the total number of growth work changes and scope of these changes;
f. Total number of actual man-hours expended, and how many of those hours were for additional /changed work;
g. The number of and reasons for any deficiency reports issued by the customer for each specification item. Provide copies of these reports if requested;
h. Discuss problems encountered and the offeror’s corrective actions
ATTACHMENT J.3
File details come from the government source that posted it. Updated .