HSCG85-11-R-P45GH2
Dockside Repairs, Main Diesel Engines Repairs, of CGC BOUTWELL (WHEC 719) Page 2 of 46 (REVISED)
SECTION B-SUPPLIES & SERVICES - PRICES
Provide all labor, materials, facility, and equipment, except as specified, to perform DOCKSIDE REPAIRS, Main Diesel Engine, of CGC BOUTWELL (WHEC 719) during the period of 13 June 2011 through 09 September 2011. All work will be performed at the cutter’s home moorage facility, San Diego, CA.
B.1
CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The bid shall be evaluated to include the bid price for each definite item.
| ITEM NO. |
| DESCRIPTION |
| AMOUNT |
| D-01 |
| Temporary Services, Provide |
| $ |
| D-02 |
| Sea Trial Performance, Provide Support |
| $ |
| D-03 |
| No. 1 Main Diesel Engines Lube Oil Coolers, Clean & Inspect for Debris |
| $ |
| D-06 |
| Main Engine Realignment |
| $ |
| TOTAL AMOUNT OF DEFINITE ITEMS |
| $ |
B.2
CLIN 0002 – OPTIONAL ITEMS
Items O-04 and O-05 will be awarded if inspection reports reveal the necessity for activation, but before 23 June 2010. See Section H “Optional Items” and Section M “Evaluation of Offers”.
| ITEM NO. |
| DESCRIPTION |
| AMOUNT |
| O-04 |
| No. 1 Main Engine Upper Crankline Repairs |
| $ |
| O-05 |
| Main Engine Lifting & Lower Crankline Repairs |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEM |
| $ |
NOTE:
Optional Item O-04 and O-05 may be activated by the contract start date of 13 June 2011. Upon activation of either optional item, additional twenty-one (21) days will be added to the performance period of the contract for each optional item and must be completed in the first twenty-one (21) days or forty-two (42) days, if both items are activated, after activation.
Other files
| File | Type | Posted |
|---|---|---|
| BOUTWELL _WHEC_378W__DS_BJR_11R2 | — | |
| Page 2 - A002.doc | DOC document | |
| Page 6 | — | |
| SF 30-A002.doc | DOC document | |
| 53712 Horizontal joint inspection 1SME upper 1 thru 12.pdf | ||
| SF3-A001.doc | DOC document | |
| BOUTWELL _WHEC_378W__DS_BJR_11R1 | — | |
| Boutwell liner visual inspection 11-2-10.pdf | ||
| Revised Page 45 of Sol..doc | DOC document | |
| 53712 Horizontal joint inspection 1SME upper 13 thru 14.pdf | ||
| Page 2 - A001.doc | DOC document | |
| Request for Clarification | — | |
| TECHNICAL EVALUATION CRTERIA.doc | DOC document | |
| NOTICE TO OFFERORS(BOUTWELL).doc | DOC document | |
| BOUTWELL _WHEC_378W__DS_BJR_11R0.pdf | ||
| Solicitation Pkg | — | |
| SF1449 -BOUTWELL.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .