HSCG47-16-R-3EFK01_Amendment_0006.pdf
PDF 316 KB Posted
- Attached to
- NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC) Federal contract opportunity
- Solicitation number
- HSCG47-16-R-3EFK01
About this file
Amendment 0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSCG47-16-R-3EFK01_Amendment_0005.pdf | ||
| HSCG47-16-R-3EFK01_Amendment_0004.pdf | ||
| HSCG47-16-R-3EFK01_Amendment_0003.pdf | ||
| Factor_1_Rev8192016.pdf | ||
| HSCG47-16-R-3EFK01_Amendment_0002.pdf | ||
| TAC_FedContractors_JRF_QA_508c.pdf | ||
| Attachment__PPQ_RMACC.docx | DOCX document | |
| ATTACHMENT_J.1.docx | DOCX document | |
| HSCG47-16-R-3EFK01_Amendment_0001.pdf | ||
| SF1442_Page_1.pdf | ||
| FINAL_NMACC_II_Solicitation2016_7-21-16.pdf | ||
| NMACC_Draft_Section_M.pdf | ||
| Draft_NMACC_SolicitationAPR2016posting.pdf | ||
| NMACC_Solicitation2016pja.docx | DOCX document | |
| Current_NMACC_Incumbents.docx | DOCX document | |
| Draft_NMACC_Solicitation2016posting.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
I) Factor 1 DELETE the following paragraph:
“Offerors are responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy and may provide additional descriptive information beyond what is required in the above list. The same project may be submitted for the different subfactors under Factor 1: Corporate Experience. One page of photographs per project may be provided with each EIF in order to provide clarity to the project description and the one page of photographs does not count against the two (2) page limit per EIF.”
REPLACE WITH:
“Offerors are responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy and may provide additional descriptive information beyond what is required in the above list. The same project may be submitted for the different subfactors under Factor 1: Corporate Experience. No more than two additional pages, to include photographs and listings of any awards/commendations, may be provided with each EIF in order to provide clarity to the project description. The two additional pages does not count against the two (2) page limit per EIF.”
Questions and Answers Continued:
97) Please confirm that the overall 56-page limit for the Phase 1 proposal only applies to Factors 1, 2, 3, 5, & 6 and that a cover letter, title page, the SF1442, Factor 1 awards/special recognition, all of Factor 4, Factor 6 organization chart, and the SAM, FAPIIS, and VET-4212 information are not counted in the overall page limit.
ANSWER: The Phase I proposal cover letter, title page, SF1442, Factor 1 awards/special recognition, all of Factor 4, Factor 6 organizational chart, the SAM, FAPIIS, and VET-4212 information DOES NOT count toward the 56 page limit.
98) Attachment J.1, EIF – There is some confusion concerning the directions on attachment J.1 (EIF), box 16. The question reads: “Attach any copies or photographs of industry awards/special recognitions, etc., received for this project. Does not apply towards page count)”.
Factor 1 reads: “One page of photographs per project may be provided with each EIF in order to provide clarity to the project description and the one page of photographs does not count against the two (2) page limit per EIF.”
Factor 1 does not address awards.
Amendment 3, Question #49 answered ‘correct’ to this statement: “include one page of photographs, awards, etc. to each EIF for a total of up to 18 pages (5 Construction, 5 Waterfront, 5 Designer, 3 D-B Team projects) that will not count towards the total page count of 40 pages listed for Factor 1 and the 56 pages total for the entire proposal.”
Question 49 seems to conflict with the J-1 instructions. It is unclear how many additional pages for awards are allowed – is it 1 page of photographs plus an unlimited number of pages for awards? Or, is it 1 page of photographs and awards for a maximum of only 18 additional pages?
(The 18 pages would include up to 5 for Construction, 5 for Waterfront, 5 for Designer, 3 for D- B Team projects.)
ANSWER: See Amendment Language.
99) Per the RFP, PPQs submitted for Factor 4: Past Performance are excluded from the page count. Would a 1-2 page summary of the PPQs to establish relevance also be exempt when included in this section?
ANSWER: A summary of the PPQs is not required
100) In several questions posted by other interested vendors a “DA 4073” form is mentioned;
however, this form cannot be found anywhere in the RFP or in any of your responses to the questions. Is this form an actual requirement? If so can you please provide?
ANSWER: The DA 4073 is not a requirement.
101) The Factor 1 revision posted with Amendment 3 states: “If an Offeror is using experience information of an affiliate, subsidiary, or parent that is not the name as exactly stated on the SF1442 or in the limited case of a key subcontractor, the proposal shall clearly demonstrate that the affiliate, subsidiary, parent firm, or key subcontractor will have meaningful involvement in the performance of the contract. No more than one project may be submitted to represent the relevant experience of an offeror’s proposed key subcontractor.” Please clarify what is considered a key subcontractor.
ANSWER: For Phase I proposals, a Key Subcontractor is defined as any subcontractor experience the Prime is submitting to meet experience under Factor 1.
102) Please clarify where an affiliate letter should be included.
ANSWER: An affiliate letter should be included behind the SF1442
103) Please clarify that award photos and letters of commendation are exempt from the page count. Also, please confirm whether the awards and commendations should follow each EIF in Factor 1 or be included in Factor 4: Past Performance after the PPQs/CPARs.
ANSWER: See Amendment Language.
END OF AMENDMENT
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0006 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: Department of Homeland Security National Multiple Award Construction Contract (NMACC) |
LAST DAY TO SUBMIT QUESTIONS IS 29 AUGUST 2016
SEE CONTINUATION PAGES
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: U.S. Coast Guard Facilities Design & Construction Center |
5505 Robin Hood Rd, Suite K Norfolk, VA 23515
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: HSCG47-16-R-3EFK01 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: |
| Pages[0]: |
| EffectiveDate[0]: 08/30/2016 |
| Dated9B[0]: 07/21/2016 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: Off |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .