The following amendment provides an extension for proposal due date changes to the RFP and Government clarification with respect to HSBP1010R0018.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

HSBP1010R0018 - A00003

Changes

- Section H, page 30: H.5 Government Property (March 2003) Clause has been removed

- Section I, page 36: FAR 52.245-1 Government Property clause removed

- Section L.9 Instructions for the Preparation of Proposals, page 87: changed to indicate proposals are due on March 1, 2010 by 3 pm EST

- In section L.9, page 87: instructions have been modified in the fifth paragraph for proposal submission. Please reference Section L.9 page 87, paragraph five for complete proposal submission requirements

Questions and Government Response to Questions

(Received at the pre-proposal site visits and afterwards via e-mail)

1. Section 6.2 of the SOW says, in part:

6.2 Safety Considerations

The Government will not provide security services for the Contractor; however, the Government will notify the Contractor of any specific security concerns likely to impact Contractor performance. Proper safety equipment (including hard hats, protective eyewear, fire-retardant clothing, etc.) should be used at all times by Contractor personnel.

The work areas will be kept clean as suited to the needs and safety of all personnel and employees.

The following precautions shall be taken:

• All maintenance, repair, and improvement teams shall consist of at least two people.

Question: Is it your intent that all activities will include two people whether or not two are required? For example, if a grader is operating along a section of roadway, would it be expected that another individual will shadow that operator or ride along with the grader operator?

Answer: Based on section C – 6.2 of the Statement of Work in HSBP1010R0018, a minimum of two people will be required for all maintenance, repair, and improvement work requirements under the contract. Vendors should provide assumptions behind the security requirement and submit a proposal that considers the need for security while along the border conducting maintenance and repair activities.

2. Question: Could you please provide a list of Area 1 Site Visit attendees specifically?

Answer: A copy of the site visit roster was posted on 16 February 2010 to Fed Biz Opps.gov as an attachment to the Area 1 RFP HSBP1010R0018.

3. Referencing Tab B Technical Capabilities, Key Personnel –

Question: Can you provide the actual position requirement for the Program/Project Manager, Supervisor (sector) and Program Analyst?

Answer: The following is a list of descriptions to provide clarification of the roles and responsibility of the Key Personnel.

Program Analyst: Successful execution of The CTIMR contract is dependent on accurate and effective management of the myriad of required information and data. A program analyst position is required for each sector to ensure information is processed daily in support of the contractor’s project manager and sector-level supervisor or superintendent, as well as provide information required by the COTR under this contract. This support will ensure those responsible for contract execution will have objectively based information for making decisions on the administrative and programmatic aspects of the contract, including controls to prevent waste, loss, unauthorized use, or misappropriation of assets; compliance with regulations, procedures, and sound management practices; and effective utilization of contractor resources.

Specific responsibilities include at a minimum:

• Capability to become skilled in operating the contractor module of the CTIMR work management system.

• Understand and prepare the information required for the contractor-proposed Sector-level work plan.

• Understand and prepare summaries, analysis, and reports that reflect updates and changes to the proposed work plans.

• Record daily information input based on work execution, including work plan elements being worked, and summarizing any issues or highlighting key events that must be included.

• Analyze actual work execution, compared to the approved plan, highlight variances, and develop an impact analysis affecting cost estimates, delivery schedule, and potential impacts on quality.

Prepare period reports and summaries as required under this contract. Ensure all documentation is reviewed by the Contractor’s Sector level supervisor prior to submittal to the government.

Program/Project Manager: A program/project manager position is required to exercise efficient and effective management of Contractor and sub-contractor personnel, equipment and other resources to satisfy all Government requirements under this contract.

Specific responsibilities include at a minimum:

• Ensure resources are available and utilized for timely and cost-effective maintenance & repair and program management support as described in 3.1 Description of work in Section C.

• Ensure timely and accurate data entry into the Government web-based work management system, and ensure reports are timely and accurate.

• Ensure Contractor participation in the quarterly meeting with key Government personnel.

• Ensure quality control, environmental compliance and worker safety during contract execution.

• Ensure timely requests for Government Furnished Material (GFM) and proper storage and use of GFM transferred to the Contractor.

Supervisor (sector level): a Supervisor (Sector-level) position is required to exercise efficient and effective management of Contractor and sub-contractor personnel, equipment and other resources to satisfy all Government requirements under this contract for a specific Border Patrol Sector.

In addition to the responsibilities described for a Program/Project Manager (but exercised for a specific Border Patrol Sector), specific responsibilities include at a minimum:

• Effective and timely communication with the COTR in controlling work activities.

• Participate in daily stand-up meetings with the COTR.

• Ensure a Contractor representative is available to address urgent work requirements on Saturdays and Sundays.

• Ensure Contractor work force identifies and reports new maintenance and repair requirements.

4. Question: If a SB Subcontracting Plan is not required, does the Government still want us to address how we will utilize small businesses as part of our team?

Answer: Though this is a HUB Zone set-aside and a subcontracting plan is not required, the Government encourages offerors to provide information detailing subcontracting plans if indeed offerors have plans to subcontract.

5. Question: If we have existing CCASS's or similar Past Performance Questionnaires used on previous proposals can we submit those instead of re-soliciting our clients for a new PPQ?

Answer: No, a new Past Performance Questionnaire must be submitted for this proposal.

6. Question: Can the Government provide additional information regarding the Funding Status Report and its purpose and contents?

Answer: The Funding status report is actually part of the Monthly Summary Report, which is described in paragraph 3.2 of Section C within HSBP1010R0018.

7. Question: Should the Notional Work Plan include actual pricing?

Answer: The Notional Work Plan will be used to evaluate offerors’ technical and management approach. The Cost Assumptions spreadsheets and Guidance for Contractor Cost Proposal provide instructions for actual pricing.

8. Question: In Section L.9, is Section 1- Transmittal and Section 2 – Executive Summary and Table of Contents included in the 50 page limitation?

Answer: Yes, the Section 1- Transmittal and Section 2 – Executive Summary and Table of Contents is included in the 50 page limitation. The Government will only exclude the Subcontracting Plan, Key Personnel Resumes, and Past Performance) from the 50-page limit.

9. Question: In Tab C Past Performance and Related Experience in Section M, would the Government like us to also submit the official CCASS for the project?

Answer: No, the Defense Contract Audit Agency (DCAA) is processing pre-award audit requests.

10. Question: This statement seems to be in error: “The offeror shall prepare its estimates of costs using only the work element information and assumptions included in Attachment 3, but the overall, comprehensive approach to performing the various work elements shall be based on this guidance document as well as information included in Section C”. Can you clarify this statement?

Answer: Yes, offerors are to use Attachment 3 Guidance for Contractor Cost Proposal for the actual cost proposal but consider the Statement of Work in Section C when addressing any industry identified assumptions that offerors would like to include in their proposals.

11. Question: M3. Evaluation Criteria, Tab C – Past Performance and Related Experience- What is the submittal requirement for Section M, Factor 3 (ii) Related Experience, paragraph B? Would you like a narrative addressing Related Experience?

Answer: Yes, offerors should provide a narrative to account for Related Experience detailing the same work completed for which the Past Performance Questionnaires are providing past performance information.

12. Question: Does the Notional Work Plan count towards the 50 page limitation?

Answer: Yes. Again, the Government will only exclude the Subcontracting Plan, Key Personnel Resumes, and Past Performance) from the 50-page limit.

13. Question: Most current DBA Wage Determinations are listed of the Department of labor website (ex. General Decision number CA080001 has been updated recently on

2/12/10). Should contractors use the DBA Wage Determinations included in the RFP or the most current as listed on the Department of Labor website?

Answer: As stated on page 2 (the Standard Form 1442) of the RFP, though Wage Determinations were provided in the RFP, all offerors should continue to check all wage rates for changes at http://www.wdol.gov/.

14. Question: Section L, Tab C – Past Performance and Related Experience calls for offerors to provide 3 past performance references. Is 3 considered the maximum? That is, is additional references are provided, will only three be evaluated?

Answer: Yes, 3 past performance questionnaires is the maximum and only 3 will be evaluated.

15. Question: If a firm has up-to-date Certifications and Representations in ORCA (online), is a hand completed copy of Section K required?

Answer: No, please check block (2) (i) in Section K to utilize ORCA electronically.

[End HSBP1010R0018 – A00003] http://www.wdol.gov/

IDCode:
Page: 1
Pages: 6
AmendNo: A00003
EffDate: 02/17/10
ReqNo: 0020053725
ProjNo: N/A
IssCode:
IssuedBy: Department of Homeland Security

Customs and Border Protection 1901 South Bell Street 8th Floor Arlington, VA 20598

AdmCode:
AdminBy:
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: HSBP1010R0018
AmendDate: 02/17/10
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
ApprData: N/A
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: The purpose of this amendment is to address questions provided at the Pre-Proposal Site Visits as well as those sent in via E-mail.

The changes in the RFP and an updated version of the Area 1 RFP HSBP1010R0018 post A00003 are in the attached pages.

The proposal submission date has been extended to 1 March 2010 at 3pm EST.

SignName:
SignTitl:
ContDate:
CoName: Mindy Lea McDaniel
CoTitle: Contracting Officer
CODate:
SolChgYs: Off
SolChgNo: Off
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Yes

File details come from the government source that posted it. Updated .