A23 RFQ Attach 5 Site Vist Questions.pdf
PDF 176 KB Posted
- Attached to
- Chillers Installation and Removal
- Solicitation number
- HQ042325QE055
- Issued by
-
Defense Finance and Accounting Service
About this file
This document is a Site Visit Vendor Questions document for a Chiller Replacement project (Solicitation HQ042325QE055) at the Defense Finance and Accounting Service (DFAS) facility in Rome, New York. The document contains detailed responses to 10 technical vendor questions regarding the replacement of three RTAA chillers, addressing specifics such as equipment specifications, installation requirements, warranty terms, and technical compliance. Key details include the requirement for new air-cooled, high-efficiency chiller units (80, 90, and 130 Ton) with specific voltage designs, mandatory installation of new conductors, potential concrete pad alterations, and integration with existing Building Automation Systems.
Vendors must meet several critical requirements, including providing chillers that comply with the Performance Work Statement (PWS) specifications, installing new units with compatible BAS systems, and ensuring proper electrical and mechanical installations. The project mandates a site visit on July 16, 2025, with quotations due by July 28, 2025, at 12:00 PM EST. The contract is a small business set-aside with a total performance period of 149 days, using a Lowest Price Technically Acceptable (LPTA) evaluation method. The anticipated contract will be a firm-fixed-price award, with chillers expected to have specific warranty terms and meet ASHRAE efficiency standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A23 RFQ Attach 5 Site Vist Questions.pdf | ||
| A23 RFQ Attach 2 Technical Certification Form.docx | DOCX document | |
| A23 RFQ 3003026 Chillers.pdf | ||
| A23 RFQ Attach 1 PWS.pdf | ||
| A23 RFQ Attach 3 Schedule of Items.docx | DOCX document | |
| A23 RFQ Attach 4 Full Text 25QE055.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chiller Replacement, HQ042325QE055
Site Visit Vendor Questions
Rev. 21 Jul 2025
1. Are the existing chiller pumps staying?
Answer: Yes, the existing chiller pumps will remain in service.
2. Are the chillers required to be Trane equipment?
Answer: Chillers will need to meet the requirements of the PWS Specification and Standard Features identified on 3.1, 3.2, and 3.3 of the PWS Requirement. Note: If the manufacturer does not provide compatible BAS systems, one shall be installed by the contractor on site. Contractor shall update Tracer ES with new chiller unit image, data, graphics, and set points. Contractor shall install new from factory new air-cooled, high efficiency chiller units 80, 90, and 130 Ton, with correct voltage design for the building.
Provide necessary electrical wiring, conduit, connections, and materials resulting in a durable and reliable power supply to the new units.
3. If the new units do not fit existing concrete pads, can the concrete pads be altered to accept a larger unit.
Answer: Yes, pads should and will be altered to accept the larger unit. Alterations will still need to meet manufacturers specifications to adequately support the equipment.
4. Is the electrical wiring to be replaced back to the power panel or can a disconnect be installed at the unit and reuse existing wire from building (power source) to new disconnect.
Answer: New conductors will need to be provided from power source to the unit.
Statement to contractor from the COR (Jim Seamans) For Chillers 1 and 2 the piping insultation replacement for the risers of the supply and returned chilled water lines will include replacing the insulation and the elbow that were identified by the surveyor’s tape.
5. Current Selections have the following Options that are not included in the Scope; please confirm these are all to be included in the Chiller Package:
a. Phase Reversal Protection; liquid and discharge isolation valves.
Answer: Reference PWS Description of Service. For each unit, provide and install two new isolation valves. Liquid and discharge isolation valves are found in the current systems and is expected to be part of the replacement chillers and placed in each line per the manufacture’s installation. The contractor shall verify all specifications and dimensions.
b. The evaporator is to be covered with factory installed 0.75-inch (k=0.28) insulation.
Answer: Reference PWS 3.1 Regulatory Compliance “new insulation with aluminum shielding”
c. Factory installed foam insulation is used on the suction line.
Answer: Reference PWS 3.1 Regulatory Compliance “new insulation with aluminum shielding”
d. Power line connection type: Circuit breaker; Enclosure Type UL60335
Answer: Reference PWS Description of Service. “Provide necessary electrical wiring, conduit, connections, and materials resulting in a durable and reliable power supply to the new units” All circuit breakers shall be of an industrial / commercial grade to manage higher voltages.
Residential grade shall not be used.
e. Factory installed water strainer
Answer: Reference PWS Description of Service. “Provide and install one new Y strainer in new supply line AND 3.1 Regulatory Compliance “water strainer”
f. Bacnet ms/tp COMM Card for Integration into Trane BMS
Answer: Reference PWS., Description of Service, if manufacture does not provide compatible BAS system, one shall be installed by the contractor on site. AND 3.1 Regulatory Compliance “system control integration to the existing Building Automation System Communication Interface (BAS)”
6. Chiller are “High Ambient Operation”: OAT between 32 Deg F - 125 Deg F; confirm this is acceptable.
Answer: Outdoor Ambient Temperature (OAT) shall be acceptable. Reference PWS 3.3 Spec and Standards. “Units shall have Freeze Protection.”
7. Maximum Allowable Sound: confirm if this is acceptable.
CGAM090:
CGAM130:
CGAM080:
Answer: Product shall meet the minimum efficiency requirements of ASHRAE Standards 90.1., prerequisite in Energy and Atmosphere section.
8. Warranty: please confirm if the following is required and acceptable:
Parts whole unit: Years 2 thru 5
Labor whole unit: Years 1 thru 5 Standard warranty is PARTS only 1st Year.
Answer: Acceptable. As warranty has been identified per PWS 9.0 Warranty “The contractor shall identify all items being installed that are guaranteed or under an extended warranty…”
9. Minimum ACTUAL Tonnage at Design Conditions
Nominal 130Ton: 123.5Tons; Nominal 90Ton: 87.9 tons; Nominal 80 Tons: 78.75ton
Answer: Acceptable
10. Please confirm the “Basis of Design” and “Model” of the Chillers listed in the Statement of work:
Trane CGAM130; Trane CGAM090; Trane CGAM080
Answer: As the PWS targets no one single manufacture / brand name, Trane “Model” shall meet the Spec. and Standards Features noted in the PWS