A23 RFQ Attach 5 Site Vist Questions.pdf
PDF 95 KB Posted
- Attached to
- Chillers Installation and Removal
- Solicitation number
- HQ042325QE055
- Issued by
-
Defense Finance and Accounting Service
About this file
This document is a Site Visit Vendor Questions document for a chiller replacement project at the Defense Finance and Accounting Service (DFAS) Rome location. The document records four key questions and answers from a mandatory site visit on July 16, 2025, related to the HQ042325QE055 solicitation. Key details include confirmation that existing chiller pumps will remain in service, chillers must meet specific Performance Work Statement (PWS) requirements, concrete pads can be altered to accommodate larger units, and new electrical conductors must be provided from the power source to the new chiller units. A statement from the Contracting Officer's Representative (COR) indicates that for Chillers 1 and 2, piping insulation replacement for supply and return chilled water lines will include replacing insulation and elbows identified by surveyor's tape.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A23 RFQ Attach 5 Site Vist Questions.pdf | ||
| A23 RFQ Attach 1 PWS.pdf | ||
| A23 RFQ 3003026 Chillers.pdf | ||
| A23 RFQ Attach 2 Technical Certification Form.docx | DOCX document | |
| A23 RFQ Attach 3 Schedule of Items.docx | DOCX document | |
| A23 RFQ Attach 4 Full Text 25QE055.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chiller Replacement, HQ042325QE055
Site Visit Vendor Questions
16 Jul 2025
1. Are the existing chiller pumps staying.
Yes, the existing chiller pumps will remain in service
2. Are the chillers required to be Trane equipment?
Chillers will need to meet the requirements of the PWS Specification and Standard Features identified on 3.1, 3.2, and 3.3 of the PWS Requirement. Note: If the manufacturer does not provide compatible BAS systems, one shall be installed by the contractor on site. Contractor shall update Tracer ES with new chiller unit image, data, graphics, and set points. Contractor shall install new from factory new air-cooled, high efficiency chiller units 80, 90, and 130 Ton, with correct voltage design for the building.
Provide necessary electrical wiring, conduit, connections, and materials resulting in a durable and reliable power supply to the new units.
3. If the new units do not fit existing concrete pads, can the concrete pads be alters to accept a larger unit.
Yes, pads should and will be altered to accept the larger unit. Alterations will still need to meet manufacturers specifications to adequately support the equipment.
4. Is the electrical wiring to be replaced back to the power panel or can a disconnect be installed at the unit and reuse existing wire from building (power source) to new disconnect.
New conductors Will need to be provided from power source to the unit.
Statement to contractor from the COR (Jim Seamans) For Chillers 1 and 2 the piping insultation replacement for the risers of the supply and returned chilled water lines will include replacing the insulation and the elbow that were identified by the surveyors tape.