Section_M_-_Protocol_6-5-18.pdf
PDF 42 KB Posted
- Attached to
- Protocol Federal contract opportunity
- Solicitation number
- HQ014718R0007
- Issued by
- DOD Missile Defense Agency
About this file
Final RFP Section M
View the file
Other files for this federal contract opportunity
Show all 50
Protocol has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ0147-18-R-0007 Protocol
SECTION M: EVALUATION FACTORS FOR AWARD
M-1.0 EVALUATION METHODOLOGY AND CRITERIA
M-1.1 This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the technically acceptable proposal with the lowest evaluated price, that is deemed responsible in accordance with the FAR and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, acceptable security and OCI plans, and all other information required by Section L of this solicitation. The Government intends to select one contractor for Protocol Support Services Requirements. However, the Government reserves the right to award no contract at all, if the SSA determines it is in the Government’s best interest. Contingent proposals are not allowed, nor will they be accepted, considered or evaluated by the Government. Contingent proposals are defined herein as proposals that include terms or conditions that imply performance is contingent upon any sort of provisioning from the Government that is not set forth in the RFP.
M-1.2 It is the Government’s intent to award without discussions (except clarifications as described in FAR 15.306(a)); therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions (FPRs) will be considered in making the source selection decision. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the PCO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
M-1.3 Competitive Range
If discussions are conducted, the PCO will establish a competitive range based on the ratings of each proposal against all evaluation criteria. If the PCO determines that an offeror’s proposal should not be included in the competitive range, the proposal will be eliminated from consideration for award and written notice of the decision will be provided to the unsuccessful offeror in accordance with FAR 15.503, whereupon they may request and receive a debriefing in accordance with FAR 15.505 and 15.506, respectively.
M-1.4 Final Proposal Revisions
Final proposal revisions will be requested if discussions have been conducted. Offerors are advised that unsupported final proposal revisions may be penalized in the overall proposal evaluation, and an otherwise acceptable proposal could be placed in jeopardy. Any changes to or non-concurrence with contract terms and conditions submitted in the final proposal revision will not be subject to further discussion or negotiation and may render the offer unacceptable to the Government. This provision is not intended to restrict the offeror’s opportunity to revise figures (e.g., prices, discounts, percentage rates, etc.). Rather, it is intended to preclude any misunderstandings by the Government, which could result if new or revised terms and conditions are submitted in the final proposal revision that have not been fully disclosed, discussed and understood during discussions or negotiations. Hence, such new or revised terms and conditions are not solicited and, if submitted in the final proposal revision, may render the offer unacceptable to the Government.
M-1.5 Factors/Subfactors
The following evaluation factors and sub-factors will be used for evaluation. Award will be made to the technically acceptable proposal with the lowest evaluated price, which is deemed responsible in accordance with the FAR and whose proposal conforms to the solicitation requirements based upon an assessment of the evaluation factors and sub-factors described below.
TABLE M-1: EVALUATION FACTORS
Non-Price Evaluation Factor Factor F1: Mission Capability Subfactor MCS1: Security Plan Subfactor MCS2: Key Personnel Staffing and Qualifications Subfactor MCS3: Corporate Experience Subfactor MCS4: Small Business Plan Price Evaluation Factor Factor F2: Cost/Price
Technical acceptability will be evaluated starting with the proposal with the lowest evaluated price until two proposals are determined to be acceptable. The remaining proposals, if any, will not be evaluated further. Factor F1 will be evaluated on an “Acceptable/Unacceptable” basis using the ratings at Table M-2. Offerors assessed with an “Unacceptable” in any of the F1 subfactors will receive an “Unacceptable” rating for Factor F1. Offerors assessed with an “Unacceptable” in any of the Subfactors will not be eligible for award.
Of these two “Acceptable” proposals, the one with the lowest evaluated price will be selected for award.
TABLE M-2: Acceptable/Unacceptable Definitions
Rating Definition Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
M-2.0 FACTOR F1: Mission Capability
For evaluation purposes, the Government will limit its evaluation to the criteria stated below.
Offerors must submit information sufficient to evaluate their approach based on the detailed criteria provided. Failure to provide a complete proposal will indicate a lack of the understanding/ability to perform the work required and will result in a determination that the offeror’s proposal is unacceptable. Unacceptability of any respective subfactor under the Mission Capability factor will result in an unacceptable Mission Capability factor rating. The following subfactors will be assessed as part of this factor:
M-2.1 Subfactor MCS1: Security Plan
The Government will evaluate the offeror’s Security Plan to determine acceptability in the following areas:
To be acceptable, the offeror must meet the facility clearance requirements in accordance with the National Industrial Security Program Operating Manual and provide evidence of an approved facility clearance with their proposal. The Government will evaluate the offeror’s approach to provide personnel security clearances and cleared personnel upon completion of the contract transition period and throughout contract performance, to include short-notice change orders.
To be acceptable, the offeror must meet requirements of the DD Form 254, DoD 5220.22-M “National Industrial Security Program Operating Manual,” and DoD Manual 5200.01, Volume 3 “Protection of Classified Information.” The Government will evaluate the offeror’s approach for safeguarding classified materials (to include handling, storing, transmitting, sharing and destroying).
To be acceptable, the offeror must meet requirements of DoD Manual 5200.01, Volume 4 “Controlled Unclassified Information.” The Government will evaluate the offeror’s approach for safeguarding Controlled Unclassified Information (CUI) (to include handling, storing, transmitting, sharing and destroying).
M-2.2 Subfactor MCS2: Key Personnel Staffing and Qualifications
The Government will evaluate the offeror’s proposed key personnel staffing approach for compliance with PWS Table 3.0, Protocol Staffing, inclusive of all key personnel; and will evaluate the qualifications of the proposed key personnel requirements for compliance with Attachment L-10, TEAMS Labor Competencies. To be rated “Acceptable” for this subfactor, the offeror’s proposal must meet all the requirements for every position. Otherwise, the offeror’s proposal will be rated “Unacceptable.”
Key personnel resumes that are not submitted in accordance with Attachment L-06 will receive a rating of “Unacceptable”. Key personnel for this requirement are the Contract Program Manager, Technical Lead/Assistant and Regional Leads as defined in PWS paragraphs 3.0 and
9.0. The contractor shall specifically identify whether the CPM will perform both roles or if the Technical Lead will be performed by a separate individual.
M-2.3 Subfactor MCS3: Corporate Experience
The Government will evaluate the offeror’s L-13 submittals to determine the offeror’s corporate experience in performing the types of work identified in the PWS. Evaluation of experience does not entail an assessment of how well the firm performed. The Government will evaluate the offeror’s (including subcontractors) experience in the area of relevant protocol support as a corporation, not individual personnel experience. To be rated “Acceptable” for this subfactor, an offeror must demonstrate one 1service contract that meets all of the following criteria:
1. twelve (12) months of continuous contract performance;
2. contract performance occurred within the last 5 years from the date of the solicitation;
3. contract supported a Department of Defense organization for at least any five (5) of the following services:
i. military customs and courtesies
ii. receptions/receiving line
iii. flag display
iv. seating arrangements
v. meal selection
vi. rendering of honors
vii. sequence of events
viii. escort duties
ix. planning packages for events
x. event invitations
xi. event VIP lists
4. and contract value of at least $500,000 annually.
The Government may contact technical and/or contracting points of contact to verify information provided on attachment L-13. If an offeror fails to meet these criteria, they will be assigned an
1 Service contract as defined in FAR 37.101 Definitions
“Unacceptable” rating for Corporate Experience.
M-2.4 Subfactor MCS4: Small Business Plan
The Government will evaluate the overall Small Business Compliance Plan of each offeror as either “Acceptable” or “Unacceptable” (as defined at Table M-2).
To receive an “Acceptable” rating in this factor, the offeror’s plan must:
a. Identify a sound process to meet the 50% rule, contained in FAR 52.219-14(c)(1).
b. Demonstrate the Small Business Prime’s total labor cost is at least 50% as identified in
Table L-4 in Section L.
M-3.0 FACTOR F2: Cost/Price
The Cost/Price factor will not receive an acceptable/unacceptable rating. The Government will only calculate the total evaluated price, ensuring that the offerors propose the RFP-specified values for Travel and ODC cost, and list them in order from lowest to highest. This list will be used to determine the order of the technical evaluations. The total evaluated price is calculated as follows:
o The Offeror’s proposed prices for the firm fixed price CLINs plus;
o The Government specified amounts for the Travel and ODC CLINs plus;
o The Offeror’s proposed price for the Time and Materials Surge CLIN.
M-4.0 Other Contracting Considerations
M-4.1 The contracting officer shall review and determine whether the offeror selected for award has addressed and resolved all OCIs in its OCI Mitigation Plans before making an award. If an OCI is not adequately addressed or mitigated, the contracting officer reserves the right to notify the offeror and allow the contractor a reasonable opportunity to respond before making an award decision. The contracting officer reserves the right to reject offers from offerors which do not adequately resolve all OCIs or are inconsistent with the agency’s OCI policy. The contracting officer also reserves the right to obtain an OCI waiver and make an award when in the best interests of the United States. Notices to offerors of organizational conflict of interest issues and their responses thereto are not negotiations or discussions as those terms are used in FAR 15.306(d). See L-1.5.