J-L1_PAST_PERFORMANCE_DATA.doc

DOC document 33 KB Posted

Attached to
BOS, Hybla Valley and USCAAF
Solicitation number
HQ0034-14-R-0002
Issued by

About this file

J-L1 Past Performance Data

View the file

Other files

File Type Posted
J-C25_RFIs_4th_1-16.xlsx XLSX spreadsheet
J-B1_--_CLIN_Summary1-16.xls XLS spreadsheet
J-B3_--_Pricing_Submission_Worksheet_1.16.xls XLS spreadsheet
HQ0034-14-R-0002-0011.pdf PDF
J-C24_RFI_Responses_(3rd).xls XLS spreadsheet
J-C1_BOS_PWS_revised_1-15.doc DOC document
HQ0034-14-R-0002-0010.pdf PDF
J-L3_Site_Visit_-Attachment.doc DOC document
J-B1_--_CLIN_Summary-1_1.13.xls XLS spreadsheet
J-C14_HVAC_Maintenance_Schedule_Revised_1-9-14.doc DOC document
HQ0034-14-R-0002-0009.pdf PDF
J-L1_PAST_PERFORMANCE_DATA_revised_12-13.doc DOC document
J-C23_RFI_Responses_(2nd_Round).xlsx XLSX spreadsheet
J-C1_BOS_PWS_revised_1-10.doc DOC document
J-B3_--_Pricing_Submission_Worksheet_1.13.xls XLS spreadsheet
HQ0034-14-R-0002-0008.pdf PDF
HQ0034-14-R-0002-0007.pdf PDF
HQ0034-14-R-0002_Amendment_0006.pdf PDF
J-C18_CBA_Service_Employees_International_Union.pdf PDF
J-C3_Historical_Data.xls XLS spreadsheet
HQ0034-14-R-0002_Solicitation_Amendment_0005.pdf PDF
J-C19_USCAAF_Floor_Drawings.pdf PDF
J-C15_HYBLA_Valley_and_USCAAF_Equipment_List.pdf PDF
J-C21_Hybla_and_USCAAF_Asset-PM_list.xls XLS spreadsheet
J-B3_--_Pricing_Submission_Worksheet.xls XLS spreadsheet
J-C20_Hybla_Valley_Floor_Drawings.pdf PDF
J-B1_--_CLIN_Summary.xls XLS spreadsheet
J-C16_RFI_Responses_12-31-13.xls XLS spreadsheet
J-C22_Boiler_Operation_Instruction_and_attachment.pdf PDF
J-C1_PWS_12-30-13.doc DOC document
J-C17_CBA_International_Union_of_Operating_Engineers.pdf PDF
J-B2_--_IQ_Coefficient_Pricing.xls XLS spreadsheet
HQ0034-14-R-0002-0004.pdf PDF
HQ0034-14-R-0002-0003.pdf PDF
HQ0034-14-R-0002-0002.pdf PDF
HQ0034-14-R-0002-0001.pdf PDF
J-C9B_VA20120106_(Davis_Bacon_Act_-_VA).doc DOC document
J-C4_--_Estimated_Building_Area_Measurement_v2.doc DOC document
J-C11b_--_USCAAF_Fire_Protection_Inventory_Redacted.pdf PDF
J-B3_--_Pricing_Submission_Worksheet.xls XLS spreadsheet
J-C8_--_Operational_Jurisdiction.pdf PDF
J-C6_--_Snow_ _Ice_Removal_Information.pdf PDF
J-C9A_DC20120002_(Davis_Bacon_Act_-_DC).doc DOC document
J-C11a_--_HVFB_Fire_Protection_Inventory.pdf PDF
J-C9H_WD_2005-2104.docx DOCX document
J-C1_BOS_PWS.doc DOC document
J-C7_--_Service_Location_with_Hour_Requirements.xls XLS spreadsheet
J-_C14_HVAC_Maintenance_Schedule.doc DOC document
HQ0034-14-R-0002.pdf PDF
J-B2_--_IQ_Coefficient_Pricing.xls XLS spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-L1

HQ0034-14-R-0002

PAST PERFORMANCE DATA

(Note: Offerors are not to change the spatial structure of this form, i.e. borders, block size, etc.)

1. Complete Name of Reference (Government agency, commercial firm, or other organization)

2. Complete Address of Reference

3. Contract Number or other control number

4. Date of contract

5. Date work was begun

6. Date work was completed

7. Contract type, initial contract price, estimated cost and fee, or target cost and profit or fee

8. Final amount invoiced or amount invoiced to date

9a. Reference/Technical point of contact (name, title, address, telephone no. and email address)

9b. Reference/Contracting point of contact (name, title, address, telephone no. and email address)

10. Location of work (country, state or province, county, city)

11. Current status of contract (choose one):

[ ] Ongoing

[ ] Complete

[ ] Terminated for Convenience

[ ] Terminated for Default

[ ] Other (explain)

12. Provide brief information describing the contract and the relevancy of the effort to be performed in accordance with the SOW and requirements of the solicitation. Provide an estimated % of relevancy of the referenced contract to the requirements set forth in this solicitation. Relevance shall address the following areas: Provision of layberth facility and associated services. Relevance can be discussed in further detail on the attached summary description as set forth in block 14 below.

13. Provide a summary description of contract work, not to exceed two pages in length. Describe the nature and scope of work, its relevancy to this contract, and a description of any problems encountered and your corrective actions. Attach the explanation to this form.

Created 10/03/2013

File details come from the government source that posted it. Updated .