J-_C14_HVAC_Maintenance_Schedule.doc
DOC document 87 KB Posted
- Attached to
- BOS, Hybla Valley and USCAAF
- Solicitation number
- HQ0034-14-R-0002
- Issued by
-
DOD Washington Headquarters Service
About this file
J-C14 HVAC Maintenance
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ0034-14-R-0002
J-C14 HVAC Maintenance Schedule
HVAC MAINTENANCE SCHEDULE/FREQUENCY
| WORK DESCRIPTION |
| FREQUENCY |
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUN |
| JUL |
| AUG |
| SEP |
| OCT |
| NOV |
| DEC |
| 1 |
| PUMP AND PUMP MOTORS INSPECTION |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 2 |
| AIR -HANDLER, SEPARATOR AND VENTILATION |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 3 |
| PLUMBING AND PLUMBING INSULATION |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 4 |
| ROOM ENVIRONMENT CONDITION |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 5 |
| WATER SOFTENER TANK |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 6 |
| DOMESTIC WATER & WATER SOFTENER |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 7 |
| STEAM & COOLER TREATMENT |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| 8 |
| HOT WATER TREATMENT |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| 9 |
| BOILER SYSTEMS CLOSED LOOP |
| BI-MONTHLY |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 10 |
| BOILER SYSTEMS OPENED LOOP |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| 11 |
| FILTERS BUILDING |
| BI-MONTHLY |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 2X |
| 12 |
| FILTERS (AIR HANDLER) BI-MONTHLY AND |
| QUARTERLY |
| X |
X
X
X
| 13 |
| FILTERS (FORCE AIR HEATER) |
| SEMI-ANNUALLY |
X
X
| 14 |
| TEST LOW WATER DEVICES |
| SEMI-ANNUALLY |
X
X
| 15 |
| TEST HIGH LIMIT & OPERATING CONTROL |
| SEMI-ANNUALLY |
X
X
| 16 |
| COMBUSTION CHAMBER ANALYSIS TEST |
| ANNUALLY |
X
| 17 |
| FILL REGULATOR (SYSTEM |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 18 |
| HEAT EXCHANGER |
| SEMI-ANNUALLY |
X
X
| 19 |
| EXPANSION TANK |
| SEMI-ANNUALLY |
X
X
| 20 |
| STRAINERS AND ACTUATOR |
| ANNUALLY |
| 21 |
| FORCED AIR HEATER |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 22 |
| AIR COMPRESSOR (SERVICE) ** |
| QUARTERLY |
X
X
X
X
| 23 |
| HOT WATER TANK ANODE |
| ANNUALLY |
X
| 24 |
| STEAM TRAPS (START ON OCTOBER) |
| SEMI-ANNUALLY |
X
X
| 25 |
| COOLING TOWER |
X
X
X
X
| 26 |
| AIR COOL CHILLER |
| QUARTERLY |
X
X
X
X
| 27 |
| HVAC HEATER RADIATOR COIL INSPECTION & CLEANING |
| ANNUALLY |
X
| 28 |
| BLOWERS, BELT, DRIVE ASSEMBLIES,FANS, VALES, INSP. |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 29 |
| BURNER ASSEMBLIES, THERMOSTAT & TEMPERATURE CONT. |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 30 |
| CONDENSATE DRIP PANS, GRILLS,EVAPORATORS, AIR FILTERS |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 31 |
| DAMPERS, CONDENSERS, COOLING COILS, PIPING PUMPS |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| DAILY |
| 32 |
| BUILDING SUMP PUMP (SERVICE) ** |
| SEMI-ANNUALLY |
X
X
| 33 |
| HEATER CHECKS (FURN AND WALLS) |
| WEEKLY |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 4X |
| 34 |
| BOILER SERVICE |
| SEMI-ANNUALLY |
X
X
| 35 |
| PNEUMATIC CONTROLS |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| 36 |
| FREQUENCY DRIVES ** |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| 37 |
| AUTOMATIC ELECTRONIC CONTROL SYSTEMS ** |
| MONTHLY |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
NOTE: ** CHECK DAILY IN ADDITION TO PERIODIC SERVICE MAINTENANCE
File details come from the government source that posted it. Updated .