Attachment_J-4_Task_Order_0001_Pricing_Format.pdf

PDF 387 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
HQ0034-13-R-0014
Issued by
DOD Washington Headquarters Service

About this file

Attachment J-4 Task Order 0001 Pricing Format

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Corrected_RFI_Response_9-26-13.pdf PDF
Attachment_2-_Task_Order_0001_Submission_Requirements_and_Evaluation.pdf PDF
Attachment_6 _RFI's___9-26-13.pdf PDF
HQ0034-13-R-0014_Amendment_0002.pdf PDF
Attachment_K.pdf PDF
Attachment_4_-RRMC_Attachments.zip ZIP file
HQ0034-13-R-0014-0001.pdf PDF
Attachment_2-_Task_Order_0001_Submission_Requirements_and_Evaluation.pdf PDF
RFI's_9-11-2013.pdf PDF
Attachment_J_Electronic_Data_Standards_(EDS)_Rev._4.1_(January_25 _2006).pdf PDF
Atttachment_H-Quality_Control.zip ZIP file
Attachment_2-_Task_Order_0001_Submission_Requirements_and_Evaluation.pdf PDF
Attachment_G-_Document_Control.zip ZIP file
Attachment_I-Scheduling.zip ZIP file
Attachment_E-_Equipment_Labeling.zip ZIP file
Attachment_1-_SOW_AF_Alterations_5A324.pdf PDF
Attachment_J-3_Financial_Questionnaire.pdf PDF
Attachment_J-2b_Lead_Design_Firm's_Past_Performance_Questionnaire.pdf PDF
Attachment_J-1b_Lead_Design_Firm's__Past_Performance_Data.pdf PDF
Attachment_B-_IT_Requirements.zip ZIP file
Attachment_F-Transition.zip ZIP file
HQ0034-13-R-0014_RFP.pdf PDF
Attachment_3_Davis_Bacon_Wage_Determination.pdf PDF
Attachment_C-_Security_Requirements.zip ZIP file
Attachment_A_Design_Requirements.zip ZIP file
Attachment_D-_Commissioning.zip ZIP file
Attachment_J-2a_Offeror's_Past_Performance_Questionnaire.pdf PDF
Attachment_J-1a_Offeror's_Past_Performance_Data.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

$0

Prepared By:

Date Prepared: mm/dd/yyyy

Estimated ***CONTRACT PRICE***

MACC Contract Estimate for Air Force 5A324

DIV Amount

CONTRACTOR MANAGEMENT COSTS $0

WORKS TOTAL COSTS $0

Subtotal $0

***General Conditions***

Site Access Factor 0.00% $0

Commissioning (as needed) 0.00% $0

***General Conditions*** $0

*** Design Costs***

Design Costs (as needed) 0.00% $0

***Design Costs*** $0

*** Premium Costs***

- Off Hours Work Premium (as needed) 0.00% $0

- Difficulty Factor (as needed) TBD per. project

***Premium Hours Costs*** $0

***Bond / Insurance***

-Performance and Payment Bond 0.00% $0

-Builder's Risk Insurance 0.00% $0

-General Liability Insurance 0.00% $0

***Bonds / Insurance*** $0

***Overhead and Fee***

Contractor's Profit 0.00% $0 Contractor's Overhead 0.00% $0

***Overhead and Fee*** $0

***ESTIMATED CONTRACT PRICE*** $0

SUMMARY SHEET

SCOPE OF WORK: Air Force ALT 5A324

ITEM Air Force ALT 5A324

QTY

(as provided by the scheduler as PoP or critical path impact)

UNIT

UNIT LABOR

COST

TOTAL COST

Management Staff and Labor

Project Manager - Days -

Project Superintendent - Days -

QC Person - Days -

Safety man - Days -

Lead Designer and Office Engineer - Days -

$0.00

Management Equipment

As needed $0.00 Hrs $0.00

As needed $0.00 Hrs $0.00

As needed $0.00 Hrs $0.00

As needed $0.00 Hrs $0.00

Subtotal Labor, Materials, Equipment $0.00

DESIGN BUILD MANAGEMENT COSTS $0.00

CONTRACTOR MANAGEMENT COSTS

Management Costs

PROJECT ESTIMATED BY:

QUANTITY MATERIALS LABOR EQUIPMENT

QUANTITY UNIT $ PER MH/ UNIT

DESCRIPTION OF WORK UNITS MEAS. UNIT SUBTOTAL UNIT / HRS SUBTOTAL RATE SUBTOTAL TOTAL

Architectural Install Chair Rail in Conference Room 0 FT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Install Carpet Tiles 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Install Broadloom Carpet 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Doors New 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Frames 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Ceiling Installed 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Ceiling Conference Room Installed 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

New Partitions 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

New Walls 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Base 0 LFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Security Door 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

External Single Door 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Paint Walls 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Finish External Walls 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Finish Doors 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Special Glass 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dumpster 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Bulk Heads 0 FT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Partitions 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Doors 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Remove Carpeting 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Remove Door and Close Opening 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Ceiling 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUB TOTAL MATERIALS $0.00

TOTAL LABOR $0.00

TOTAL EQUIPMENT $0.00

TOTAL MATERIALS, LABOR, & EQUIPMENT $0.00

Air Force Alt 5A324

DATE PREPARED: mm/dd/yyyy

ESTIMATE VALID THROUGH:

QUANTITY UNIT $ PER MH/ UNIT

DESCRIPTION OF WORK UNITS MEAS. UNIT SUBTOTAL UNIT / HRS SUBTOTAL RATE SUBTOTAL TOTAL

Furniture

AX 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

BX 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

HX 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

F 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

CR 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Conference Room Chairs 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Conference Room Table 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dumpster 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MATERIALS $0.00

TOTAL HOURS $0.00

TOTALS EQUIPMENT $0.00

$0TOTAL

Air Force Alt 5A324

QUANTITY UNIT $ PER MH/ UNIT

DESCRIPTION OF WORK UNITS MEAS. UNIT SUBTOTAL UNIT / HRS SUBTOTAL RATE SUBTOTAL TOTAL

MECHANICAL

Sprinkler Piping 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sprinkler heads 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Hangers 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Testing/Outages 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Duct Reducers 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

VAV Box 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Duct Work 0 FT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Hangers 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Outage/Testing 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Grills 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Flexible Duct 0 LNFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Thermostat 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Balancing 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Refrigerated Piping 0 LNFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Server room AC Unit 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dumpster 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Electrical HVAC 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Sprinkler Heads 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo Sprinkler 0 FT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Demo HVAC 0 SQFT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL MATERIALS $0.00

TOTAL LABOR $0.00

TOTAL EQUIPMENT $0.00

TOTAL $0.00

Air Force Alt 5A324

QUANTITY UNIT $ PER MH/ UNIT

DESCRIPTION OF WORK UNITS MEAS. UNIT SUBTOTAL UNIT / HRS SUBTOTAL RATE SUBTOTAL TOTAL

ELECTRICAL

Workstation Drops #1 0 EA $0.00 $0.00 $0.00 $0.00 $4.00 $0.00

Workstation Drops #2 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Workstation Drops #3 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Workstation Drops #4 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Workstation Drops #5 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Printer 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fax 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Copier 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

EQ 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TV 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Rack 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

C9 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

R 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Display Screens 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Power Distribution Section 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Universal Rail 0 FT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Lighting 2x 4 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Card Swipes 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Column Boxes 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LED Lights 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Lighting Whips/Conn/Box 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Electrical Connections 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dumpster 0 EA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTALS MATERIALS $0.00

TOTAL HOURS $0.00

TOTAL EQUIPMENT $0.00

TOTAL $0

Air Force Alt 5A324

ESTIMATES SHEETS MATERIALS LABOR EQUIPMENT TOTAL

SUMMARY

Architectural $0.00 $0.00 $0.00 $0.00

Furniture $0.00 $0.00 $0.00 $0.00

Mechanical $0.00 $0.00 $0.00 $0.00

Electrical $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

TOTAL $0.00

Air Force ALT 5A324

ESTIMATE VALID THROUGH: 9/30/2013

File details come from the government source that posted it. Updated .