Attachment_6 _RFI's___9-26-13.pdf
PDF 451 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- HQ0034-13-R-0014
- Issued by
- DOD Washington Headquarters Service
About this file
Attachment 6 Response to RFI's dated September 26 2013
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
Multiple Award Construction Contract (MACC)
HQ0034-13-R-0014
September 26, 2013
1 | P a g e
Q# Administrative Question Answer Official Date
0001 Would you please release the
Attendant Sheets for Pre-Proposal Site
Visit
The pre-proposal site visit sign-in sheet cannot be released, as it contains personal identifiable information. Ref.
Privacy Act of 1974
MC 9/16/13
0002 Price sheets shown in the Solicitation
Documents is for IDIQ contract.
Please provide the price sheet for Task
Order 0001
The Offeror’s price proposal shall include a breakdown of all costs using the same format as Attachment J-4.
Ref. Amendment 0002, Section L
MC 9/16/13
0003 Section L, Volume 2 Section C.
Does the government want every section of the SF330 filled out in its entirety
The SF330 will not be required. JH 9/24/13
0004 Does the government want a completed SF330 package for the entire design team or just the Lead
Design Firm?
0005 Does the SF330 (or the referenced appendix) have a page limit?
0006 Is the SF330 considered “reproduced section(s) of the solicitation document”? If that is the case, does that mean that it is not subject to the same font restrictions of the proposal documents?
The SF330 will not be required. JH 9/24/13
0007 Vol II – Tech Proposal Section A provides the Key personnel proposed.
Section C requires the list of Key personnel. As the page count for Vol
II is only 12 pages can this duplication be eliminated?
Technical Volume II was increased to
25 pages.
Ref. Amendment 0002, Section L
**Resumes and letters of commitment do not count toward the overall page limit required for Vol II.
The SF330 will not be required.
MC 9/24/13
0008 Vol II Section C requires at least 5 Technical Volume II was increased to MC 9/24/13
HQ0034-13-R-0014
2 | P a g e project write ups from the Offeror and
3 from the Designer. Even if these are limited to 1 page each, they would take up 8 of the 12 page limit for the
Volume. Can the project write ups be eliminated from page count?
25 pages in Amendment 0002.
0009 Vol II b) The A/E firms experience is to be presented in SF 330 format and
“made part of this Appendix” What are they other components of the
Appendix mentioned and is the
Appendix page counted?
The SF330 will not be required. With this change, there should be no appendix.
0010 Joint Venture Agreement, Volume III, Does the Joint Venture contractor also have to be a Hubzone contractor?
CFR 13 § 126.616
A joint venture may submit an offer on a
HUBZone contract if the joint venture meets all of the following requirements:
(a) HUBZone joint venture. A qualified
HUBZone SBC may enter into a joint venture with another qualified
HUBZone SBC for the purpose of submitting an offer for a HUBZone contract. The joint venture itself need not be certified as a qualified HUBZone
SBC.
(b) Size of concerns. (1) A joint venture of two or more qualified HUBZone
SBCs may submit an offer for a
HUBZone contract so long as each concern is small under the size standard corresponding to the NAICS code assigned to the contract and the
HUBZone joint venture in the aggregate may exceed the size standard provided the procurement meets the following conditions:
MC 9/20/13
HQ0034-13-R-0014
3 | P a g e
(i) For a procurement having a revenue-based size standard, the procurement exceeds half the size standard corresponding to the NAICS code assigned to the contract; and
(ii) For a procurement having an employee-based size standard, the procurement exceeds $10 million.
(2) For a procurement that does not exceed the applicable dollar amount specified in paragraph (b)(1) of this section, a joint venture of two or more qualified HUBZone SBCs may submit an offer for a HUBZone contract so long as the qualified HUBZone SBCs in the aggregate are small under the size standard corresponding to the NAICS code assigned to the contract.
(c) Performance of work. The aggregate of the qualified HUBZone SBCs to the joint venture, not each concern separately, must perform the applicable percentage of work required by 13 CFR
125.6.
[69 FR 29426, May 24, 2004] http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb
4ad57589340a0&rgn=div8&view=text
&node=13:1.0.1.1.21.6.295.17&idno=1
Offerors shall seek further guidance from the SBA HUBZone Program
Office.
http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb4ad57589340a0&rgn=div8&view=text&node=13:1.0.1.1.21.6.295.17&idno=13 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb4ad57589340a0&rgn=div8&view=text&node=13:1.0.1.1.21.6.295.17&idno=13 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb4ad57589340a0&rgn=div8&view=text&node=13:1.0.1.1.21.6.295.17&idno=13 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb4ad57589340a0&rgn=div8&view=text&node=13:1.0.1.1.21.6.295.17&idno=13 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=2577cc51bbec1e885fb4ad57589340a0&rgn=div8&view=text&node=13:1.0.1.1.21.6.295.17&idno=13
HQ0034-13-R-0014
4 | P a g e
0011 How many contractors will be chosen for the MACC contract?
This procurement consists of one solicitation with the intent to award five or more Indefinite Delivery Indefinite
Quantity (IDIQ) Construction Contracts.
MC 9/19/13
0012 How many task orders, on average, will be awarded annually?
Approximately 15-20 per year based on previous MACC.
MC 9/19/13
0013 The list of general contractors that are bidding on this project.
This is source selection information and will not be released.
MC 9/19/13
0014 Are the 5 past performance projects
(in addition to the 3 from the design teaming partner) to be submitted from the prime contractor only or from the team?
Section L, Vol 1.A states: The Offeror shall submit a minimum of three to a maximum of five references.
The Offeror shall submit a maximum of three references that can provide information regarding the Lead Design
Firm’s relevant past performance.
Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor.
Questionnaires shall be submitted to the
Government by the individual or the organization listed as the reference.
MC 9/19/13
0015 Is this bid bond requirement on the task order which is 1-5 million?
Yes. The bid bond amount shall be at least 20 percent of the bid price but shall not exceed $3 million.
The Offeror is to provide pricing for
Task Order 0001/Seed Project only.
MC 9/20/13
0016 SECTION 21.0
“BONDABILITY/BID BOND” states:
“For every Task Order placed on the
A bid bond is required.
MC 9/20/13
HQ0034-13-R-0014
5 | P a g e
MACC, a letter of "bondability" on the Surety's letterhead stating the offeror has the bonding capacity available is required of each proposer responding to the order. The purpose of this letter is to put the bonding company on notice that their client is proposing on a project. This letter does not require the proposer to incur cost. The bonding company will provide it upon a client's request. A bid bond in the amount of 20% for each Task Order may be required in lieu of a bondability letter.”
The TASK ORDER Submission
Requirements and Evaluation states, “A letter of bondability on the Surety's letterhead stating the offeror has the bonding capacity available is required for this proposal, per the aforementioned IDIQ MACC contract.”
The SF1442 states that a bid guarantee is required.
Please verify if a bid bond is required.
Ref. Amendment 0002-
Section 21.0, Bondability/Bid
Bond, Section L, Volume III Tab B:
Bid Bond and Letter of
Bondability, and
Attachment 2, Task Order 0001
Submission Requirements and
Evaluation
0017 Please provide instructions for correctly filling out Section B –
Supplies or Services and Prices. Each
CLIN item includes a quantity on
12,000,000 with a unit of “Lot”. Are we required to develop a Unit Price and extend that towards the “Lot” of
12,000,000? If so, what is the scope of work we are to develop the unit prices for?
Pricing should only be provided for
Task Order 0001/Seed Project. Pricing for Task Order 0001 shall be provided in Volume III-Cost/Price, Tab C.
The Offeror’s price proposal shall include a breakdown of all costs using the same format as Attachment J-4.
Ref. Amendment 0002, Section L and
Attachment 2, Task Order 0001
Submission Requirements and
Evaluation
0018 How many General Contractors will This procurement consists of one
HQ0034-13-R-0014
6 | P a g e be selected to participate in the
MACC? Is the contractor that is awarded Task Order 0001 automatically part of the short listed
GC’s for the MACC solicitation with the intent to award five or more Indefinite Delivery Indefinite
Quantity (IDIQ) Construction Contracts.
The awardee of Task Order 0001 will be to one of the five MACC awardees.
0019 Is this project tax-exempt? Ref. FAR 52.229-3 MC 9/24/13
0020 On page 106 of the RFP, “Tab B:
Letter of Bondability Each offeror shall include a notarized letter from its surety certifying the offeror’s bonding capacity. Offerors must possess a minimum aggregate bonding capacity of $50,000,000 and a minimum per-contract bonding capacity of
$10,000,000 to be eligible for award.
Offerors possessing less than the minimum bonding capacity will be considered not responsible.”
However, in clause 52.216-19, (b) (2)
“Order Limitations” you indicate that the maximum aggregate contract value for any one contractor is $10,000,000.
It is unclear why the government is requiring an aggregate bonding capacity 5 times greater than the value of contracts it can award to the contractor? Further, given that this solicitation is a HUBZone set-aside and the firm must be a small business to be HUBZone, even if the firm has a
$50 mil aggregate bonding program, selection for award would most likely tie up the selected firm’s entire bonding program which clearly would not be in the best interest of any small business and especially given the guaranteed minimum is on $10,000
The bonding capacity remains the same per Vol III, Tab B.
FAR 52.216-19(b) states, Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $10,000,000;
(2) Any order for a combination of items in excess of $10,000,000; or
(3) A series of orders from the same ordering office within 7 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
The Government is requiring a min aggregate bonding capacity of $50 million, because it is estimated that each
MACC participant will be awarded multiple task orders during the period of performance. The maximum task order amount is $10 million per task order, not the aggregate.
HQ0034-13-R-0014
7 | P a g e over five years. The untended consequence of the government’s stipulation would in affect be hampering the entities ability to develop with no promise of any work and would eliminate many otherwise qualified small HUBZone certified contractors. Therefore, we request the bond capacity of section K be reduced to $5 million single and $10 million aggregate. Please advise.
0021 Section B of the RFP requests for supplies or services and price as follow:
a. Item 0001 for base year performance period with quantity of
12,000,000 Lot
b. Item 1001 for option year 1 with quantity of 12,000,000 Lot
c. Item 1002 for option year 2 with
d. Item 1003 for option year 3 with
e. Item 1004 for option year 4 with
For this task order, Attachment 1 – SOW AF Alterations
5A324, which price items are to be filled. Please explain the quantity of
12,000,000 Lot equate to the pricing?
Pricing should only be provided for
Task Order 0001/Seed Project. Pricing for Task Order 0001 shall be provided in Volume III-Cost/Price, Tab C.
The Offeror’s price proposal shall include a breakdown of all costs using the same format as Attachment J-4.
Section B, Supplies or Services and
Prices is for the basic MACC are not to be completed by the Offeror.
0022 Page 107 of 117 of the RFP requests for 28% minority participation and
FAR 52.222-23, “Notice of
Requirements for Affirmative Action to
HQ0034-13-R-0014
8 | P a g e
6.9% female participation. Please confirm.
Ensure Equal Employment Opportunity for Construction” applies to this acquisition.
0023 May we have the sign in sheet from the site visit?
The pre-proposal site visit sign-in sheet cannot be released, as it contains personal identifiable information.
Ref. Privacy Act of 1974
MC 9/24/13
0024 Will a project that is slightly larger than $10MM ($10.6MM) be considered very relevant/relevant?
Relevant, if the effort is similar in scope and complexities to the solicitation requirements. Ref. Section M
MC 9/24/13
0025 Can each member of a JV submit 5 projects if the JV has no past performance?
No, the Offeror, which in this case would be the JV (excluding Lead
Design Firm(s)) shall submit a minimum of three to a maximum of five references total.
0026 If an Offeror is teamed and is not a
JV, can each team member submit 5 projects?
No, the Offeror and the Offeror’s team
(excluding Lead Design Firm(s)) shall submit a minimum of three to a maximum of five references total.
0027 In Volume II, Section C.a. are these 5 prime contractor projects and 3 lead design firm projects supposed to be the same as the Past Performance projects?
It is not required to be the same projects, but can be.
0028 Can the lead design firm and teamed members provide a single letter that serves both as a letter of commitment and a letter of consent?
Subcontractor consent should be provide with the past performance information.
Letters of commitment should be provided in Vol II, Section A.
You may combine them, but they shall be included in both Vol I and Vol II.
MC 9/24/13
0029 In Volume II, Section D, can the government please confirm that the
Offeror must discuss Quality Control
Yes. MC 9/24/13
HQ0034-13-R-0014
9 | P a g e paragraph c and Limiting Cost Growth paragraph c? It appears that these paragraphs requirements are repeats;
with the page limits do we need to have this section twice?
0030 Can Form J-1a and Form J-2a be converted to Word so that they can be more easily incorporated into the proposal?
You may convert these to Word Format;
however, the page count for each form shall not change.
MC 9/24/13
0031 What percentage of construction must be complete for a Lead Design Firm’s project to be considered very relevant?
*A project submitted for past performance information must satisfy all of the following criteria in order to be considered “Very Relevant”:
(1) The contract value is between
$300,000 - $10,000,000 for design-build construction project
(2) The Offeror is the prime contractor
(3) The Offeror’s lead design firm is the designer of record
(4) The effective date of the contract performance is within 36 months from the date of the proposal submission deadline.
MC 9/24/13
0032 In Section L, Volume I, Section B:
Past Performance Questionnaire, what are we supposed to be include in this section of the volume? Attachments
J-2a and J-2b questionnaires are to be submitted by the reference POCs and returned to the CO. Do you want us to include the page 1 of Attachments J-
2a and J-2b in this section or just an empty tab where the completed questionnaires can be inserted?
Include a tab for Vol I Section B. Past
Performance Questionnaires received will be inserted by the CO/CS.
MC 9/24/13
0033 According to Section L, Electronic
Copy, we are required to provide all
They may also be provided as a PDF. MC 9/24/13
HQ0034-13-R-0014
10 | P a g e files in a format readable by Word, Excel, Project, Power Point or MS
Office. Therefore we request that you provide RFP sections A through K in
Word format for Volume III, Tab A.
0034 We also request Word format for
Attachments J-1a, J-1b, and J-3.
You may convert these to Word Format;
however, the page count for each form shall not change.
0035 According to Section L, Factor 2, Subfactor A, Key Personnel, table of minimum qualifications: Does the
Program Manager or Project Manager need an active Licensed Professional
Registration in VA, MD, DC or PA IN
ADDITION TO or INSTEAD OF
CCM, PMP, or CPC certification?
Ref. Amendment 0002, Section L
0036 For Attachment J-3: Financial
Questionnaire, the instructions indicate that the financial institution
“upon completion, place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror’s address shown below”. Does this mean that
Attachment J-3 should be provided with our proposal still in the sealed envelope (from the financial institution), not in Volume III binder under Tab D?
It should be provided in the sealed envelope in Vol III, Tab D
MC 9/24/13
0037 In Amendment 0001, the page limitation for Volume II Technical is
15 pages. Considering that Section C
Experience will include potentially 8 projects total, that means almost 8 pages for that section alone. That leaves 7 pages for the organizational chart, technical approach, resources, The technical page limitation is increased to 25 pages.
HQ0034-13-R-0014
11 | P a g e quality control, scheduling, and cost control.
We request that the Volume II
Technical page limitation be increased to 25 pages.
0038 "In determining acceptability, the
Government may also consider factors including the Contracting Officer's knowledge of and previous experience with the offering firm,...."
This would seem to give unfair advantage to incumbent contractors.
Would the Government consider removing this factor in evaluating
LPTA?
The evaluation method is best value for the MACC basic. The seed project evaluation method is LPTA and does not include a past performance evaluation. The factors for the seed project are Technical and Price only.
In regards to the past performance evaluation for the MACC basic, considering the CO’s knowledge of and previous experience with the Offeror will not give an unfair advantage to incumbent contractors.
This would be equivalent to other CO’s knowledge of and previous experience with offerors that are not the incumbents.
MC 9/25/20
Technical Questions
001 Are full-time superintendent, QCM and Safety Manager mandatory?
Site Superintendent shall be on site at all times that work is being performed. Per
Multiple Award Construction Contract
Scope of Work (MACC SOW)
Requirement 8.5, “The designated QCM shall be present on the site while construction or demolition activities are occurring.” The SSHO (Safety
Manager) according to the EM 385-1-1 shall be on site at all times work is being performed. See MACC SOW
Requirement 8.1 Dual Roles for Key
JH 9/23/13
HQ0034-13-R-0014
12 | P a g e
Personnel and Safety.
002 Who provides “Cell and Safe” on
“Proposed – Furniture” of Test-Fit?
Government to provide Cell and Safe. JH 9/24/13
003 Is Display screen in the Conference
Room on “Proposed – Furniture” of
Test Fit in this contract?
Government to provide Display Screen JH 9/24/13
004 Who provides all the furniture in the conference room and two F offices?
Per the Evaluation SOW Technical
Requirements, Section 1.2 Project Scope
Item 8: “Furniture in the Conference
Room and F Offices will be provided by
Other Government Contractor (OGC).”
JH 9/23/13
005 Are new window blinds in this contract?
The blinds currently in the space shall be protected in place, or removed, protected and re-installed.
JH 9/24/13
006 Is HESKO Box in Conference Room to be provided by the contractor?
Government shall provide Hesko box. JH 9/24/13
007 Item 3 of Article 1.2 “Project Scope” on Page 1 of SOW for the Seed project states that there are three F offices. However, “Proposed –
Partition” of Test Fit shows only two
F offices. Please clarify
Refer to Proposed Furniture Test Fit
Drawing. Three F offices are part of the requirement. The third, located in Suite
Z, is combined with a hotel station. The
F Office furniture is to be provided by other Govt contractor, but all HX stations are to be contractor provided per KOP. See also Answer #009
JH 9/24/13
008 What is happening with existing
(Steelcase) furniture that is to be removed? Will it need to be put into a storage room; on-site or off? Will it be disposed of? Will any of it be reused?
Per the Evaluation SOW Technical
Requirements, Section 4.6 New
Furniture, “The Contractor shall be responsible for removal and disposal of existing furniture.”
JH 9/24/13
009 The new plan requirements for the RP Correct it is drawn as an AX. Price this JH 9/24/13
HQ0034-13-R-0014
13 | P a g e
Suite indicates (1) HX Hotel Style station. The plan on the drawing is an
AX size. We wanted to call attention to this because the price for an AX typical is more expensive than a typical hotel station.
one HX as an AX in RP Suite only.
The requirements for Suite Z calls for
(6) HX Hotel Style stations. There are
(7) on the proposed furniture drawing
(the 7th is located in the F office).
Can we provide a quote for this
7th one since it’s in the F office? We do not typically provide furniture for the F office (Not sure if they want this to match the furniture of the F office).
Yes provide a price for the HX in F
Office in Suite Z. This HX in the F
Office shall be KOP to match F Office
Furniture finishes.
JH 9/24/13
011 Task chairs: will they re-use any existing Aerons? Should we quote all new?
No re-use of furniture. D/B Contractor is to provide all new.
012 What chair should we spec for the (2) meeting areas? Caper?
Please provide a side chair similar to the chair depicted in chair description attachment.
JH 9/24/13
013 Would they like casters on the
Meeting tables or glides?
Glides are acceptable.
014 What chair should we spec for the F office guest chairs? Aeron Sled Base, Caper, Aside?
See attachment referenced in answer
#012 and provide 2 side chairs per each of three (3) F offices
015 How high are the screens between stations; single or double stack?
Single Stack JH 9/24/13
016 It looks like they are using 3h lateral Provide the lateral file only, no laminate JH 9/24/13
HQ0034-13-R-0014
14 | P a g e files as locations for printers, etc. I’d suggest we spec an additional laminate top for these files. The typical KOP
3h file is painted metal top. I know the laminate isn’t the standard KOP, but the tops will last longer if we protect the metal top top.
017 We are planning on using the
Sandstone paint color (since that’s what Air Force mostly has at the PNT) and Aggregate Screens. Finishes will need to be confirmed
Agreed that finishes will need to be confirmed. This will be done during the
DID process. See Project SOW
Technical Requirements, Section 5.2.
Refer also to Project SOW Attachment
A-Design Requirements, Item B.
Reservation Finish Standards, page 2.
JH 9/24/13
018 Suite CR & Safes are noted as Tenant provided so we will not need to spec anything there
Government Provided. JH 9/24/13
019 Will you supply a drawing so we can plan the furniture accordingly? There are some non-typical workstations due to columns.
After Contractor has signed a non-disclosure statement and is under
Contract for this Project, Microstation
.DGN files, to include all A/E disciplines of existing conditions, will be provided to the D/B Contractor.(see
MACC Sow 2.12.2) The DIDs (see
Technical Requirements SOW Section
5.2 DID Phase Req.) shall serve the
purpose of further design development and problem-solving.
For this proposal, pdf drawing files were provided in Attachment A Design
Requirements, Item E As-Built pdfs for reference.
020 What chair should we spec for the
Entrapment area?
See answer #012
HQ0034-13-R-0014
15 | P a g e
021 Is the Smart wall full height? There is one area we found that indicates they will use glass infill above. We just want to make sure we have hangers for the flippers
Yes, the smart wall is full-height.
Regardless of infill type the USP smart wall will accept overhead bins.
JH 9/24/13
022 The office in Suite Z with (2) BX stations is going to be tight. The return against the door violates ADA code and we don’t think the room is wide enough for (2) wardrobes. The proposed test fit plan shows them overlapped
See answer #019 JH 9/24/13
023 The F office in Suite Z is narrow and the space to get past the peninsula doesn’t look sufficient on their test fit plan. If we did KOP, we could use the teardrop table. If it was AO to sub for
Allsteel, the peninsula would need to change in size from the standard.
see answer #019 JH 9/24/13
024 Provide electrical and communication drawings for the job.
see answer #019 JH 9/24/13
025 Can the Govt. pls specify the types of design documents they would like to see for the seed project i.e. floor plans, submittals, etc.
See Technical Requirements SOW
Section 5.0 Design Requirements, more specifically 5.4 Design Deliverables
Table which also specifies quantities and due dates. See also MACC SOW
Section 2.0, more specifically 2.9
Design Submissions. The actual design deliverables (DAT, BOD, Reports, A/E design document packages, etc.), will be due on the dates following Notice to
Proceed for the Project Award.
026 What is the Govt estimate for the Seed
Project?
The Government estimate will not be disclosed. FAR 36.203
MC 9/19/13
027 Pls specify security requirements for
Offerors crews for work at the
Refer to Section H of the solicitation. JH 9/24/13
HQ0034-13-R-0014
16 | P a g e
Pentagon and other facilities.
028 Can a Masters Certificate in Applied
Project Management be substituted for a CCM, PMP or a CPC for either a
Program or Project Manager?
No. JH 9/24/13
029 The RFP indicates that the Program
Manager and Project Manager need to have 15 and 10 years of experience, respectively, in addition to at least one certification (CCM, PMP, CPC) and licensed in VA, MD, PA, or District of
Columbia. Is the licensure in one of the four states/territories in addition to having at least one of the professional certifications?
MACC SOW 8.0 Personnel
Requirements Chart is being amended to make the minimum qualifications more clear. Professional Licensure is an option for the Program Manager, for the
Project Manager and for the Design
Project Manager. In lieu of the Program
Manager having one of the listed certifications or professional licensure
(see revised Key Personnel Chart), the
Program Manager could instead possess
25 years of Construction Management experience. In lieu of the Project
Manager having one of the listed certifications or professional licensure
(see revised Key Personnel Chart), he could instead possess 20 years of
Construction Management experience.
Please note, the DOR or EOR stamping the drawings is the person who must be licensed in the State in which the Project is being performed. For example licensed in PA for work at Raven Rock.
030 Will having an active Licensed
Professional Registration in VA, MD, D.C., or PA meet that requirement?
See answer #029. JH 9/24/13
031 Will a licensed Professional Engineer
(PE) suffice to meet the requirements of having one certification (CCM, PMP, CPC) as indicated for the program manager and project manager in the RFP?
See answer #029 and amended Key
Personnel Chart. Each of the personnel on the chart must meet the minimum qualifications in their box.
HQ0034-13-R-0014
17 | P a g e
032 Is it a requirement under this contract that the offeror should have worked with the
Proposed design team on previous projects?
Refer to Section M- Factor 2 and
Relative Importance of the Evaluation
Factors
JH 9/24/13
033 Can the proposed project team be changes at a later time?
The project team may only change with approval by the Contracting Officer.
JH 9/24/13
034 How many full time personnel are required on task orders awarded? ( do all key personnel mentioned in the proposal requirement have to be full time)
It is at the Offeror’s discretion as to how many full time personnel are required on task orders; however, shall meet the requirements of Section 8.0.
JH 9/24/13
035 How important is it for the offeror to have design build experience?
The Government will be evaluating the degree of design/build experience, similar in scope of this requirement, of the Offeror’s team, including previous projects worked together. The degree of success from the Government’s perspective of the team’s ability to work together. (Ref. Section M- Factor II
Technical, Subfactor C)
Relative of importance:
Within Factor 2, Subfactor A will be conducted on a “Pass/Fail” basis; any offeror that fails to meet all minimum required certifications and work experience for each key personnel position will not be evaluated further.
HQ0034-13-R-0014
18 | P a g e
Subfactor’s B, C, and D are listed in descending order of importance. (Ref.
Section M)
036 Do the key personnel that we list in our proposal need to have security clearance or can that be done once the contract is awarded?
Refer to Section H of the Solicitation, under Security Requirements.
037 Reference Section 8.0. The RFP requires both the Program Manager and the Project Manager to have atleast one of the following certifications in addition to 15 and 10 years of experience: Certified
Construction Manager, Project
Manager Professional, and Certified
Professional Constructor. These certifications are not widely held in the general contractor industry. The certifications are more prominent amount large CM/PM firms. Please consider eliminating this certification requirement to increase the ability of small firms to compete.
See answer #029 JH 9/24/13
038 (Reference Section 8.0 Key
Personnel and page 110 of 117)
The RFP requires both the Program
Manager and the Project
Manager to have at least one of the following certifications in addition to 15 and 10 years of
See Answer #029
The Design Build Institute of America professional certification has now been added to the Revised Key Personnel
Chart.
HQ0034-13-R-0014
19 | P a g e experience: Certified Construction
Manager, Project Manager
Professional, Certified Professional
Constructor. Can the D e s i g n
Build Institute of America professional certification be substituted f o r the CCM, PMP, or
CPC requirement? The DBIA certification is very appl icable to t h i s s o l i c i t a t i o n and is more prevalent among design I build contracting firms.
Ref. Amendment 0002
Please provide USP Kit of Parts
Specifications for furniture items FN-
23; FN-24; FN-26; FN-26.1; FN-37.1
and item FN-40.1
See Project SOW Attachment A- Design
Requirements, Item C. Furniture KOP
Prototypicals
JH 9/24/13
040 On the proposed furniture plan, there is an item shown what would indicate it as a chair, yet it is labeled FN-19 which is a keyboard tray according the
USP Technical guide. Please verify what this object is to be.
Each workstation receives a key board tray and a task chair.
JH 9/24/13
041 The Proposed partition plan states that the drywall partitions adjacent to the corridor are to include STC-45 and
STC-50 ratings. Please provide as-built drawings of the existing partitions.
See answer #019
Also per the Project SOW, plan for renovated space to meet STC 45 throughout.
JH 9/24/13
042 Please provide as-built cross sections providing floor to floor heights and floor to ceiling heights through the area to be renovated.
See answer #019 JH 9/24/13
HQ0034-13-R-0014
20 | P a g e
043 The RFP states we are to provide 1” blinds for the windows. Please provide elevations and dimensions of the windows to receive the blinds.
See answer #005 JH 9/24/13
044 On the proposed furniture plan, the legend shows:
AX = KOP AX style workstation
BX = KOP BX style workstation
HX = KOP Hotel style workstation.
Neither the “Universal Space Plan
Manual” nor the “Furniture KOP
Prototypicals” documents show us
AX, BX, HX workstations. Instead, they show AX-1A; AX-1B; AX-1C;
AX-1D etc. Please clarify which workstation layouts are preferred.
AX, BX and HX refer to the basic size of the workstation style. AX-1A, AX-
1B, etc. refers to variations within that style. Exact styles would be determined during the DID phase and during development of the 50% design submission, by the D/B Contractor, as directed by the government.
045 No “As Built” Mechanical floorplans, schedules, or specifications have been provided. Please provide these documents and ensure they include information for the entire air handling system, not just the space being renovated.
Assume the mechanical spaces adjacent to the space to be renovated have the capacity to support any mechanical rework in the space (to include sprinkler risers). See also Answer #019.
JH 9/24/13
046 Is there electric and water utilities available on site? Who is responsible for paying the water and electric consumptions during the construction period? Please clarify.
Contractor will use building supplied electricity and water from existing panels and risers.
JH 9/24/13
047 Part 12.1 of Statement of Work –
Multiple Award Construction Contract notes that Contractor is responsible for obtaining the Pentagon Permits for those applicable activities. Is the
Contractor responsible for paying for those permits? If so, please provide the costs and time of approval.
The Pentagon Permits Process and other facilities processes will be explained by the CM/COR at kickoff for a particular
Task Order. There is no cost associated.
Lead times will be provided for various permits as necessary and will vary. The
Contractor is responsible to incorporate these lead times into their Construction
Schedule.
HQ0034-13-R-0014
21 | P a g e
048 Attachment H, section 014500.0010, part 3.4.2 indicates CQC System
Manager must be on site at all times during construction, and gives two options: 1) assigned no other duties, and 2) assigned as System Manager but may have duties as project superintendent in addition to quality control. Which is correct option?
Option #1 is correct for this proposal.
To be clear the CQC (or QCM) shall be assigned no other duties unless the Dual
Hatted Option is exercised with approval by the Government on a specific Task Order. See MACC SOW
Requirement 8.1 Dual Roles for Key
Personnel and Safety. See also MACC
SOW Requirement 8.4 Quality Control
Manager.
049 Page 63 of the RFP states that we need to provide Letters of Commitment for key personnel. Typically Letters of
Commitment are only required when the proposed key individuals are not currently employed with our firm.
Please confirm that Letters of
Commitment are not required for current employees.
Resumes are all that are needed for Key
Personnel if they meet the minimum qualifications of the Key Personnel
Chart but both Resumes and Letters of
Commitment are requ52.219-1
SMALL BUSINESS PROGRAM
REPRESENTATIONS (APR 2012)
(a)(1) The North American Industry
Classification System (NAICS) code for this acquisition is 236220 (insert
NAICS code).
(2) The small business size standard is
$33.5 million.
(3) The small business size standard for
HQ0034-13-R-0014
22 | P a g e a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) Representations.
(1) The offeror represents as part of its offer that it ( ) is, ( ) is not a small business concern.
(2) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents, for general statistical purposes, that it ( ) is, ( ) is not a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) (Complete only if the offeror concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a women-owned small business concern.
(4) Women-owned small business
(WOSB) concern eligible under the
HQ0034-13-R-0014
23 | P a g e
WOSB Program. [Complete only if the offeror represented itself as a women-owned small business concern in paragraph (b)(3) of this provision.] The offeror represents as part of its offer that--
(i) It ( ) is, ( ) is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility;
and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13
CFR part 127, and the representation in paragraph (b)(4)(i) of this provision is accurate for each
WOSB concern eligible under the
WOSB Program participating in the joint venture. [The offeror shall enter the name or names of the WOSB concern eligible under the WOSB
Program and other small businesses that are participating in the joint venture: ----
------.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB
HQ0034-13-R-0014
24 | P a g e representation.
(5) Economically disadvantaged women-owned small business
(EDWOSB) concern. [Complete only if the offeror represented itself as a women-owned small business concern eligible under the WOSB Program in
(b)(4) of this provision.] The offeror represents as part of its offer that--
(i) It ( ) is, ( ) is not an EDWOSB concern eligible under the WOSB
Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13
CFR part 127, and the representation in paragraph (b)(5)(i) of this provision is accurate for each
EDWOSB concern participating in the joint venture. [The offeror shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ----
------.] Each EDWOSB concern participating in the joint venture shall
HQ0034-13-R-0014
25 | P a g e submit a separate signed copy of the
EDWOSB representation.
(6) (Complete only if the offeror concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a veteran-owned small business concern.
(7) (Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph
(b)(6) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a service-disabled veteran-owned small business concern.
(8) (Complete only if the offeror concern in paragraph (b)(1) of this provision.) The offeror represents, as part of its offer, that--
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of
Qualified HUBZone Small Business
Concerns maintained by the Small
Business Administration, and no
HQ0034-13-R-0014
26 | P a g e material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with
13 CFR Part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR Part 126, and the representation in paragraph (b)(8)(i) of this provision is accurate for each
HUBZone small business concern participating in the HUBZone joint venture. [The offeror shall enter the names of each of the HUBZone small business concerns participating in the
HUBZone joint venture: --------.] Each
HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
(c) Definitions. As used in this provision--
“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent
HQ0034-13-R-0014
27 | P a g e directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business concern eligible under the WOSB Program.
Service-disabled veteran-owned small business concern--
(1) Means a small business concern--
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent
HQ0034-13-R-0014
28 | P a g e caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C.
101(16).
"Small business concern," means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR
Part 121 and the size standard in paragraph (a) of this provision.
Veteran-owned small business concern means a small business concern--
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
HQ0034-13-R-0014
29 | P a g e
(2) The management and daily business operations of which are controlled by one or more veterans.
"Women-owned small business concern," means a small business concern --
(1) That is at least 51 percent owned by one or more women; in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and
(2) Whose management and daily business operations are controlled by one or more women.
“Women-owned small business
(WOSB) concern eligible under the
WOSB Program (in accordance with 13
CFR part 127)”, means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.
HQ0034-13-R-0014
30 | P a g e
(d) Notice.
(1) If this solicitation is for supplies and has been set aside, in whole or in part, for small business concerns, then the clause in this solicitation providing notice of the set-aside contains restrictions on the source of the end items to be furnished.
(2) Under 15 U.S.C. 645(d), any person who misrepresents a firm's status as a business concern that is small, HUBZone small, small disadvantaged, service-disabled veteran-owned small, economically disadvantaged women-owned small, or women-owned small eligible under the WOSB Program in order to obtain a contract to be awarded under the preference programs established pursuant to section 8, 9, 15, 31, and 36 of the Small Business Act or any other provision of Federal law that specifically references section 8(d) for a definition of program eligibility, shall—
(i) Be punished by imposition of fine, imprisonment, or both;
(ii) Be subject to administrative remedies, including suspension and
HQ0034-13-R-0014
31 | P a g e debarment; and
(iii) Be ineligible for participation in programs conducted under the authority of the Act.
(End of provision) ired from proposed individuals not currently employed by the D/B
Contractor.
050 Page 65 of the RFP states that
Architectural and Engineering firm design experience shall be presented on a Standard Form 330 and made part of the appendix. Please confirm that the appendix is outside of the page limitations.
051 Per Attachment A - Item A, the
Proposed Partition Legend drawing indicates “U/R = Provide Universal
Rail on corridor walls in bay/ suite as noted.” Please specify the material in which the railing will be composed of?
The Universal Rail is a purchased metal component. See Project SOW
Attachment A- Design Requirements, Item H. USP Technical Volume.
JH 9/24/13
Per Attachment A- Item A, the
Proposed Partition Legend states that there will be “ceiling mounted projection screens” installed in Suite
RP and Suite CR. Please specify the
Projection Screens are Government provided.
HQ0034-13-R-0014
32 | P a g e type and dimensions for these projection screens.
052 Page 7 of 14 of attachment 1 calls for photoluminescence (PL) to be provided within the project areas per
Universal Space Plan (USP). USP does not mention any detail where the
PL is required. Typically PL is used in the dark room and/or exit egress corridors. If this PL is required, where will it needs within proposed spaces?
Under the D/B Contract the DOR will develop design documents to include PL for egress requirements per WHS –
Building Code for installation. (See
Attachment A-Design Requirements, Item J. WHS-BC and Item H. USP
Technical Volume for Space Type)
053 Based on the 4500 SF area given in the RFP, we assume that the basic use of the space will be Business. If the conference room is considered an
Unconcentrated Assembly use, this may push the occupancy count over
50 for the suite. If this is the case, the swing of the suite entry/exit doors will have to be reversed. Is the door on the far plan east wall considered an exit egress door? Where does this door go? What is the fire rating of the wall between suites?
The provided Test Fits are schematic designs provided by the Tenant to illustrate basic design requirements.
Under the D/B Contract the DOR shall develop the appropriate code compliant design. Refer to Architectural pdfs in
Attachment A-Design Requirements, Item E. Existing Drawing for additional information.
054 Will STC-45 gypsum board soffits be required in this space per the USP
Workbook?
Yes.
055 Is there a Life Safety Analysis available for the rest of the floor?
The D/B Contractor drawings will be reviewed during Govt. review periods after design submissions to be sure they meet building egress requirements.
056 Amendment 1, Page 9 of 76 –
Statement of Work, section 2.2.2
After Contractor has signed a non-
HQ0034-13-R-0014
33 | P a g e indicates a requirement of 20% spare capacity for the new electrical panel.
What is the spare capacity for the existing panel?
Contract, this information will be provided to the D/B Contractor. Assume there is adequate spare electrical capacity to satisfy this Scope of Work.
057 Per attachment A: Design
Requirement:
a. Which doors do not require security hardware? Will there be a hardware schedule provided?
b. Which walls are demountable, and which ones are gypsum boards?
c. Please provide the location and quantity of the “smart walls”.
d. There does not appear to be enough distance between the partitions at the Entrapment Area to fulfill ADA door opening requirements.
e. ADA turning space within offices do not appear to be sufficient. ADA clearances at doors to open office areas in both suites appear to be insufficient.
f. Are the partitions between the systems furniture in “Suite RP” full-height? If the required ports and outlets could be provided within the systems furniture, would these walls still be desirable?
g. Please verify that all doors will be
1 ¾” solid wood paint grade.
a. Per the “proposed partition plan” and accompanying legend provided in the Project SOW
Attachment A. Design
Requirements, Item A. Test Fit, the doors with security are noted.
The hardware schedule will be developed by the D/B Contractor during Design Development.
b. The perimeter walls are gypsum and the demising walls between the RP, CR and Z Suites are gypsum.
c. See proposed partition plan and legend.
d. The D/B Contractor will develop
Code Compliant design documents to fulfill ADA requirements. The test fit drawings are schematic designs provided by the Tenant for general design layout.
e. See answer to #057d above.
f. See Project SOW Attachment A-
Design Requirements, Item C. Furniture
KOP Prototypicals and Item H. USP
HQ0034-13-R-0014
34 | P a g e
Technical Volume. Systems furniture is not part of USP.
g. Yes per the Project SOW Attachment
A-Design Requirements, Item H. USP
Technical Volume.
058 Page 12 of 14 of attachment 1, section
7.3 EMCS System notes “The existing
Energy Management and Control
System (EMCS) will be provided as an OGC (Other Government
Contractors). Johnson Controls is currently used by the Building
Management for EMCS and shall be engaged on this project as an OGC.
All changes and additions to the
EMCS systems must integrate with the existing systems.” Who is responsible for paying the cost for the tie-in with
Johnson Control?
The D/B Contractor is responsible to pay the cost.
059 Per the purposed partition plan of attachment 1, section 4.5 Doors and
Hardware states to provide new doors and hardware and rough-in security pathways for card swipes and X09 locks. Are there any specific manufacturers or specifications for the card readers and cypher locks that match the existing?
Card Swipes and X09 locks are provided by OGC.
060 Per the proposed partition plan of attachment 1 in the Test Fit section, the drawing shows three wall partitions for the smart walls (two with solid infill above and one with glass infill above) that have defined characteristics above. Can you clarify if these are the only locations for
See answer to #062. JH 9/24/13
HQ0034-13-R-0014
35 | P a g e smart walls?
061 How many SCIF areas are required in the new plan?
None. Per page 3 of Attachment 1
Technical Requirements SOW Section
4.2 Open Storage Secure, the entire
finish space will be Open Storage with
STC 45 ratings throughout.
JH 9/24/13
062 Doors from corridor reverse swing.
Are these all new doors?
It is the D/B Contractors responsibility to develop the design and propose the appropriate solution(s). See Attachment
1 Technical Requirements SOW Section
5.2 Design Intent Document Phase
Requirements. The DID Phase will serve this purpose.
JH 9/24/13
063 Door on left side is shown on proposed plan. Is this a new door?
See answer to #062. JH 9/24/13
064 Conference room is shown with smart walls, is this correct?
No CR will be gypsum wallboard with
Chair rail, service mounted raceway and drops as noted on legend for proposed partition plan.
JH 9/24/13
065 What size boxes are required, Full or half size A or B for smart walls?
For A zone boxes and B zone boxes, refer to proposed furniture layout and
USP Technical Volume for Smart Wall
Configuration in A zones and B zones.
In the USP Volume reference some information on utility connections in
Chapter 02, specifically Chapter 02.7.
JH 9/24/13
066 What kind of electrical connections are required at work stations? Typ A or B
See Answer to #065 JH 9/24/13
067 Work stations call out A-x or B-x.
There are multiple workstation types.
Which specific ones…