Contractor Questions and Answers_AMD2.pdf
PDF 529 KB Posted
- Attached to
- Construct 3D Printer Room
- Solicitation number
- HM157524B0001
About this file
This document contains Contractor Questions and Answers regarding Amendment 2 to a federal contract for the Construct 3D Printer Room opportunity with the National Geospatial Intelligence Agency. The key details are:
The questions and answers clarify revisions made to the construction drawings, including changes to the partition types and metal runner specifications. Specifically, Sheet A1 has been revised to only indicate Type 1 partitions, Detail 3/A-2 has been changed from Type 5A to Type 1 partition, and Details 3, 7, 8, and 9 on Sheet A2 have been revised to specify 20 gauge metal runners. These modifications were made in response to contractor questions about the partition and construction material requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
# Date Document Section Question Answer 1 7/23/2024 1.Sheet A1 indicates the new par ons are
Type 1. On Sheet A2, there is not a Type 1 partition, only a Typical Type 2.
Answer: Sheet has been revised to only indicate Type 1 par on.
2 7/23/2024 2.Detail 3/A-2 refers to a par on Type 5A. Answer: Type 5A has been revised to indicate Type 1 partition.
3 7/23/2024 3.Detail 5 refers to several others. Answer: Detail has been revised to indicate Type 1 partition.
4 7/23/2024 4.Detail 3,7,8 & 9 on A2 also have different top runner gauges 20, 22 and 16 gauge.
Answer: Details have been revised to indicate 20 gauge metal runner.
UNCLASSIFIED