This document contains a set of questions and answers related to a federal contract opportunity to construct a 3D printer room for the National Geospatial Intelligence Agency. Key details include:

The solicitation number is HM157524B0001. Clarifications are provided regarding the building height, HVAC controls manufacturer, and fire rating of the new wall. Respondents are informed that details can be found in revised drawings A1, A2, and specification section 09 22 00. Respondents are also directed to the solicitation document for information on required provisions and clauses to be completed. The project appears to be tax-exempt. No life safety drawing is currently available.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

# Date Document Section Question Answer 1 8/6/2024 I am searching for the RFP “Clauses and

Provisions”, the Offeror’s shall complete fill-in(s) on all applicable provisions. in the documents provided. Could you let me know what attachment I can find this information at?

Please let me know at your earliest convenience.

These may be found in the solicitation document titled

HM157524B0001.

2 8/1/2024 Is this project state sales tax exempt? (Typically they are but in a very few they have not been.

And I’ve went through solicitation documents a few times and can not find where it states it IS or IS NOT).

Our projects are tax exempt.

3 8/1/2024 In Amendment 0002, Attachment L – Revised Drawing, in Detail 3 it shows AFF to Structural Deck to be an elevation of 11’ 7”. But in Amendment 0003 Q&A it states: “Height from finished floor to the bo om of the roof deck is

9.2 meters.” This is a significant elevation difference.

a. Which elevation is correct/accurate for this room?

b. If 9.2 meters is accurate, then the 20 ga metal studs specified in drawing A2 will not be sufficient. Please advise?

Please see revised drawings A1, A2 and spec 09 22 00 for updated details and clarification. Height from finished floor to bottom of the roof deck is 9.2m.

4 8/1/2024 What is Arnold MO station’s/building supplier/manufacturer for HVAC Controls/BMS?

Commonly this is Johnson Controls. Sut sometimes Siemens.

It is Johnson Controls (JCI).

5 8/2/2024 Can you provide/publish a life safety drawing for this project? According to the single partition tag, the new wall is not fire rated.

Please see revised drawings A1, A2 and spec 09 22 00 for updated details and clarification.