ATTACHMENT H - TS3 Cost Template10SEPTV8_9CLINS - Amendment 2.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- TECH SOUTH SUPPORT SERVICES (TS3)
- Solicitation number
- HHM40225R0017
- Issued by
-
Defense Intelligence Agency
About this file
This document is a detailed cost template for the Tech South Support Services (TS3) contract with the Defense Intelligence Agency, covering a five-year period from September 15, 2025, to September 14, 2030. The contract encompasses three primary mission areas: Effects-Based Technology Development, Advanced Capability Development, and Technology Evaluation, spanning terrestrial, maritime, and airborne domains with technologies ranging from unmanned systems to integrated payloads and platforms.
The cost template provides a comprehensive breakdown of labor categories, including senior and mid-level positions such as Program Managers, Engineers (Systems, Mechanical, Electrical, Aerospace), Maritime Operators, UAS Operators, and support roles like Logisticians and Security Specialists. The document outlines yearly budgets with increasing allocations: base year costs include $1,000,000 for Program Managers, $5,325,000 for Other Direct Costs (Materials), and $1,050,000 for Travel, with subsequent years showing incremental budget increases. The contract includes surge CLINs (Contract Line Item Numbers) for additional staffing and maintains a consistent full-time equivalent (FTE) staffing model of approximately 106 total employees across the five-year contract period.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| CLIN | Description | Hours | Total Cost |
| CLIN 0001 | Task 5.1 | 137,030 | $ - 0 |
| CLIN 0002 | Task 5.1 Surge | 5,125 | $ - 0 |
| CLIN 0003 | Task 5.2 | 232,625 | $ - 0 |
| CLIN 0004 | Task 5.2 Surge | 4,500 | $ - 0 |
| CLIN 0005 | Task 5.3 | 124,055 | $ - 0 |
| CLIN 0006 | Task 5.3 Surge | 4,500 | $ - 0 |
| CLIN 0007 | ODC- Materials | $ 5,325,000 | |
| CLIN 0008 | Travel | $ 1,050,000 | |
| CLIN 0009 | CDRL |
Total Cost $ 6,375,000
&KFF0000UNCLASSIFIED//FOUO
SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
UNCLASSIFIED//FOUO
&P of &N
Base Year Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2025 - 9/14/2026 | |||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||||
| Level | Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| Program Manager | Senior | 638 | 637 | 637 | 1,000,000 | Each | 1 | 1,000,000 | 200,000 | Each | 1 | 200,000 | |||||||||
| Systems Engineer | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Mechanical Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | 1,912 | |||||||||||||||||||
| Electrical Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Aerospace Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Radio Frequency Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Naval Architect | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Maritime Engineer | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Senior | 478 | ||||||||||||||||||||
| Reverse Engineer | Mid | 956 | 956 | ||||||||||||||||||
| Software Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Biological Scientist | Mid | 1,912 | |||||||||||||||||||
| Data Analyst | Mid | 1,912 | |||||||||||||||||||
| Fabricator | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 1,912 | 1,912 | |||||||||||||||||||
| Composites Technician | Mid | 956 | 956 | ||||||||||||||||||
| Machinist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Mechanical Technician | Mid | 956 | |||||||||||||||||||
| Electrical Technician | Mid | 956 | 1,912 | 956 | |||||||||||||||||
| Welder | Mid | 956 | 956 | ||||||||||||||||||
| Maritime Operator | Mid | 478 | 478 | 2,100 | |||||||||||||||||
| Senior | 478 | 478 | 2,100 | ||||||||||||||||||
| Able Body Seaman | Junior | 2,100 | |||||||||||||||||||
| Mid | 956 | 956 | 2,100 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| UAS Operator | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Program Manager | Mid | 1,912 | 1,912 | 478 | |||||||||||||||||
| Logistician | Mid | 1,912 | 1,912 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Finance/Accounting Specialist | Mid | 478 | 478 | ||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Administrative Assistant | Mid | 478 | 478 | 478 | |||||||||||||||||
| Information System | |||||||||||||||||||||
| Security Officer | Senior | 956 | 956 | ||||||||||||||||||
| Safety Specialist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Security Specialist | Mid | 478 | 478 | 478 | |||||||||||||||||
| Procurement Specialist | Junior | 478 | 478 | ||||||||||||||||||
| Mid | 478 | ||||||||||||||||||||
| SURGE CLINs 0002/ 0004/ 0006 | |||||||||||||||||||||
| Systems Engineer | Mid | 200 | 0.00 | $ - 0 | 200 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| UAS Operator | Mid | 0 | 0.00 | $ - 0 | 275 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| Maritime Operator | Mid | 400 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 500 | 0.00 | - 0 | |||||||||||
| Fabricator | Mid | 425 | 0.00 | $ - 0 | 425 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | 28,431 | $ - 0 | 47,425 | $ - 0 | 25,711 | $ - 0 | $ 1,000,000 | $ 200,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | 106.24 | 29.74 | 49.61 | 26.89 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
Year 2 Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2026 - 9/14/2027 | |||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||||
| Level | Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| Program Manager | Senior | 638 | 637 | - 0 | 637 | 1,025,000 | Each | $ 1.00 | $ 1,025,000 | 205,000 | Each | $ 1.00 | $ 205,000 | ||||||||
| Systems Engineer | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Mechanical Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | 1,912 | |||||||||||||||||||
| Electrical Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Aerospace Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Radio Frequency Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Naval Architect | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Maritime Engineer | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Senior | 478 | ||||||||||||||||||||
| Reverse Engineer | Mid | 956 | 956 | ||||||||||||||||||
| Software Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Biological Scientist | Mid | 1,912 | |||||||||||||||||||
| Data Analyst | Mid | 1,912 | |||||||||||||||||||
| Fabricator | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 1,912 | 1,912 | |||||||||||||||||||
| Composites Technician | Mid | 956 | 956 | ||||||||||||||||||
| Machinist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Mechanical Technician | Mid | 956 | |||||||||||||||||||
| Electrical Technician | Mid | 956 | 1,912 | 956 | |||||||||||||||||
| Welder | Mid | 956 | 956 | ||||||||||||||||||
| Maritime Operator | Mid | 478 | 478 | 2,100 | |||||||||||||||||
| Senior | 478 | 478 | 2,100 | ||||||||||||||||||
| Able Body Seaman | Junior | 2,100 | |||||||||||||||||||
| Mid | 956 | 956 | 2,100 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| UAS Operator | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Program Manager | Mid | 1,912 | 1,912 | 478 | |||||||||||||||||
| Logistician | Mid | 1,912 | 1,912 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Finance/Accounting Specialist | Mid | 478 | 478 | ||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Administrative Assistant | Mid | 478 | 478 | 478 | |||||||||||||||||
| Information System | |||||||||||||||||||||
| Security Officer | Senior | 956 | 956 | ||||||||||||||||||
| Safety Specialist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Security Specialist | Mid | 478 | 478 | 478 | |||||||||||||||||
| Procurement Specialist | Junior | 478 | 478 | ||||||||||||||||||
| Mid | 478 | ||||||||||||||||||||
| SURGE CLINs 0002/ 0004/ 0006 | |||||||||||||||||||||
| Systems Engineer | Mid | 200 | 0.00 | $ - 0 | 200 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| UAS Operator | Mid | 0 | 0.00 | $ - 0 | 275 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| Maritime Operator | Mid | 400 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 500 | 0.00 | - 0 | |||||||||||
| Fabricator | Mid | 425 | 0.00 | $ - 0 | 425 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | 28,431 | $ - 0 | 47,425 | $ - 0 | 25,711 | $ - 0 | $ 1,025,000 | $ 205,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | 106.24 | 29.74 | 49.61 | 26.89 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
Year 3 Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2027 - 9/14/2028 | |||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||||
| Level | Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| Program Manager | Senior | 638 | 637 | 637 | 1,060,000 | Each | $ 1.00 | $ 1,060,000 | 210,000 | Each | $ 1.00 | $ 210,000 | |||||||||
| Systems Engineer | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Mechanical Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | 1,912 | |||||||||||||||||||
| Electrical Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Aerospace Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Radio Frequency Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Naval Architect | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Maritime Engineer | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Senior | 478 | ||||||||||||||||||||
| Reverse Engineer | Mid | 956 | 956 | ||||||||||||||||||
| Software Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Biological Scientist | Mid | 1,912 | |||||||||||||||||||
| Data Analyst | Mid | 1,912 | |||||||||||||||||||
| Fabricator | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 1,912 | 1,912 | |||||||||||||||||||
| Composites Technician | Mid | 956 | 956 | ||||||||||||||||||
| Machinist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Mechanical Technician | Mid | 956 | |||||||||||||||||||
| Electrical Technician | Mid | 956 | 1,912 | 956 | |||||||||||||||||
| Welder | Mid | 956 | 956 | ||||||||||||||||||
| Maritime Operator | Mid | 478 | 478 | 2,100 | |||||||||||||||||
| Senior | 478 | 478 | 2,100 | ||||||||||||||||||
| Able Body Seaman | Junior | 2,100 | |||||||||||||||||||
| Mid | 956 | 956 | 2,100 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| UAS Operator | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Program Manager | Mid | 1,912 | 1,912 | 478 | |||||||||||||||||
| Logistician | Mid | 1,912 | 1,912 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Finance/Accounting Specialist | Mid | 478 | 478 | ||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Administrative Assistant | Mid | 478 | 478 | 478 | |||||||||||||||||
| Information System | |||||||||||||||||||||
| Security Officer | Senior | 956 | 956 | ||||||||||||||||||
| Safety Specialist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Security Specialist | Mid | 478 | 478 | 478 | |||||||||||||||||
| Procurement Specialist | Junior | 478 | 478 | ||||||||||||||||||
| Mid | 478 | ||||||||||||||||||||
| SURGE CLINs 0002/ 0004/ 0006 | |||||||||||||||||||||
| Systems Engineer | Mid | 200 | 0.00 | $ - 0 | 200 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| UAS Operator | Mid | 0 | 0.00 | $ - 0 | 275 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| Maritime Operator | Mid | 400 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 500 | 0.00 | - 0 | |||||||||||
| Fabricator | Mid | 425 | 0.00 | $ - 0 | 425 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | 28,431 | $ - 0 | 47,425 | $ - 0 | 25,711 | $ - 0 | $ 1,060,000 | $ 210,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | 106.24 | 29.74 | 49.61 | 26.89 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
Year 4 Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2028 - 9/14/2029 | |||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||||
| Level | Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| Program Manager | Senior | 638 | 637 | 637 | 1,120,000 | Each | $ 1.00 | $ 1,120,000 | 215,000 | Each | $ 1.00 | $ 215,000 | |||||||||
| Systems Engineer | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Mechanical Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | 1,912 | |||||||||||||||||||
| Electrical Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Aerospace Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Radio Frequency Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Naval Architect | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Maritime Engineer | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Senior | 478 | ||||||||||||||||||||
| Reverse Engineer | Mid | 956 | 956 | ||||||||||||||||||
| Software Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Biological Scientist | Mid | 1,912 | |||||||||||||||||||
| Data Analyst | Mid | 1,912 | |||||||||||||||||||
| Fabricator | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 1,912 | 1,912 | |||||||||||||||||||
| Composites Technician | Mid | 956 | 956 | ||||||||||||||||||
| Machinist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Mechanical Technician | Mid | 956 | |||||||||||||||||||
| Electrical Technician | Mid | 956 | 1,912 | 956 | |||||||||||||||||
| Welder | Mid | 956 | 956 | ||||||||||||||||||
| Maritime Operator | Mid | 478 | 478 | 2,100 | |||||||||||||||||
| Senior | 478 | 478 | 2,100 | ||||||||||||||||||
| Able Body Seaman | Junior | 2,100 | |||||||||||||||||||
| Mid | 956 | 956 | 2,100 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| UAS Operator | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Program Manager | Mid | 1,912 | 1,912 | 478 | |||||||||||||||||
| Logistician | Mid | 1,912 | 1,912 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Finance/Accounting Specialist | Mid | 478 | 478 | ||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Administrative Assistant | Mid | 478 | 478 | 478 | |||||||||||||||||
| Information System | |||||||||||||||||||||
| Security Officer | Senior | 956 | 956 | ||||||||||||||||||
| Safety Specialist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Security Specialist | Mid | 478 | 478 | 478 | |||||||||||||||||
| Procurement Specialist | Junior | 478 | 478 | ||||||||||||||||||
| Mid | 478 | ||||||||||||||||||||
| SURGE CLINs 0002/ 0004/ 0006 | |||||||||||||||||||||
| Systems Engineer | Mid | 200 | 0.00 | $ - 0 | 200 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| UAS Operator | Mid | 0 | 0.00 | $ - 0 | 275 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| Maritime Operator | Mid | 400 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 500 | 0.00 | - 0 | |||||||||||
| Fabricator | Mid | 425 | 0.00 | $ - 0 | 425 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | 28,431 | $ - 0 | 47,425 | $ - 0 | 25,711 | $ - 0 | $ 1,120,000 | $ 215,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | 106.24 | 29.74 | 49.61 | 26.89 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
Year 5 Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2029 - 9/14/2030 | |||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||||
| Level | Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| Program Manager | Senior | 638 | 637 | 637 | 1,120,000 | Each | $ 1.00 | $ 1,120,000 | 220,000 | Each | $ 1.00 | $ 220,000 | |||||||||
| Systems Engineer | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Mechanical Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | 1,912 | |||||||||||||||||||
| Electrical Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Aerospace Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Radio Frequency Engineer | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Naval Architect | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Maritime Engineer | Mid | 478 | 478 | 1,912 | |||||||||||||||||
| Senior | 478 | ||||||||||||||||||||
| Reverse Engineer | Mid | 956 | 956 | ||||||||||||||||||
| Software Engineer | Mid | 1,912 | |||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Biological Scientist | Mid | 1,912 | |||||||||||||||||||
| Data Analyst | Mid | 1,912 | |||||||||||||||||||
| Fabricator | Mid | 1,912 | 1,912 | 956 | |||||||||||||||||
| Senior | 1,912 | 1,912 | |||||||||||||||||||
| Composites Technician | Mid | 956 | 956 | ||||||||||||||||||
| Machinist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Mechanical Technician | Mid | 956 | |||||||||||||||||||
| Electrical Technician | Mid | 956 | 1,912 | 956 | |||||||||||||||||
| Welder | Mid | 956 | 956 | ||||||||||||||||||
| Maritime Operator | Mid | 478 | 478 | 2,100 | |||||||||||||||||
| Senior | 478 | 478 | 2,100 | ||||||||||||||||||
| Able Body Seaman | Junior | 2,100 | |||||||||||||||||||
| Mid | 956 | 956 | 2,100 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| UAS Operator | Mid | 956 | 1,912 | ||||||||||||||||||
| Senior | 1,912 | ||||||||||||||||||||
| Program Manager | Mid | 1,912 | 1,912 | 478 | |||||||||||||||||
| Logistician | Mid | 1,912 | 1,912 | ||||||||||||||||||
| Senior | 956 | 956 | |||||||||||||||||||
| Finance/Accounting Specialist | Mid | 478 | 478 | ||||||||||||||||||
| Senior | 956 | ||||||||||||||||||||
| Administrative Assistant | Mid | 478 | 478 | 478 | |||||||||||||||||
| Information System | |||||||||||||||||||||
| Security Officer | Senior | 956 | 956 | ||||||||||||||||||
| Safety Specialist | Mid | 956 | 956 | 956 | |||||||||||||||||
| Security Specialist | Mid | 478 | 478 | 478 | |||||||||||||||||
| Procurement Specialist | Junior | 478 | 478 | ||||||||||||||||||
| Mid | 478 | ||||||||||||||||||||
| SURGE CLINs 0002/ 0004/ 0006 | 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| Systems Engineer | Mid | 200 | 0.00 | $ - 0 | 200 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| UAS Operator | Mid | 0 | 0.00 | $ - 0 | 275 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| Maritime Operator | Mid | 400 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 500 | 0.00 | - 0 | |||||||||||
| Fabricator | Mid | 425 | 0.00 | $ - 0 | 425 | 0.00 | - 0 | 200 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | 28,431 | $ - 0 | 47,425 | $ - 0 | 25,711 | $ - 0 | $ 1,120,000 | $ 220,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | 106.24 | 29.74 | 49.61 | 26.89 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
Labor Rate BoE
| Labor Catergories | 9/15/2025 - 9/14/2026 | 9/15/2026 - 9/14/2027 | 9/15/2027 - 9/14/2028 | 9/15/2028 - 9/14/2029 | 9/15/2029 - 9/14/2030 | ||
| Program Manager | Senior | ||||||
| Systems Engineer | Mid | ||||||
| Senior | |||||||
| Mechanical Engineer | Mid | ||||||
| Senior | |||||||
| Electrical Engineer | Mid | ||||||
| Aerospace Engineer | Mid | ||||||
| Radio Frequency Engineer | Mid | ||||||
| Senior | |||||||
| Naval Architect | Mid | ||||||
| Maritime Engineer | Mid | ||||||
| Senior | |||||||
| Reverse Engineer | Mid | ||||||
| Software Engineer | Mid | ||||||
| Senior | |||||||
| Biological Scientist | Mid | ||||||
| Data Analyst | Mid | ||||||
| Fabricator | Mid | ||||||
| Senior | |||||||
| Composites Technician | Mid | ||||||
| Machinist | Mid | ||||||
| Mechanical Technician | Mid | ||||||
| Electrical Technician | Mid | ||||||
| Welder | Mid | ||||||
| Maritime Operator | Mid | ||||||
| Senior | |||||||
| Able Body Seaman | Junior | ||||||
| Mid | |||||||
| Senior | |||||||
| UAS Operator | Mid | ||||||
| Senior | |||||||
| Program Manager | Mid | ||||||
| Logistician | Mid | ||||||
| Senior | |||||||
| Finance/Accounting Specialist | Mid | ||||||
| Senior | |||||||
| Administrative Assistant | Mid | ||||||
| Information System | |||||||
| Security Officer | Senior | ||||||
| Safety Specialist | Mid | ||||||
| Security Specialist | Mid | ||||||
| Procurement Specialist | Junior | ||||||
| Mid | |||||||
| SURGE CLINs 0002/ 0004/ 0006 | |||||||
| Systems Engineer | Mid | ||||||
| UAS Operator | Mid | ||||||
| Maritime Operator | Mid | ||||||
| Fabricator | Mid |
&KFF0000UNCLASSIFIED//FOUO
SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&K01+000 &A
&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104
&P of &N
ODC- Material Other Direct Costs (ODC) Materials:
The following table is an example of items that would be purchased by the contractor. These are items that have been purchased in the past. This is not an all-inclusive list, and includes a mixture of Equipment, Tools, Consumables, Shipping considerations, and IT equipment. While the exact make/model purchased may be different, the general scope/use of the item should be similar to the one researched and presented below. No items should be purchased without first providing information to the Government COR and ACOR that a requirement for an ODC purchase exists.
The contractor shall provide a request for approval to the Government COR and ACOR for items valued up to $10,000. The contractor shall provide a request for approval to the Contracting Officer via the Government COR and ACOR for items valued above $10,000.
| Uninterruptable Power Supplies (UPS) |
| Gyro Compass |
| Circuit Breakers |
| Screws, Washers, Pins, Punches, Springs |
| Filament |
| Wire, Inverter, Grounding Bar, Solar Controllers |
| Rotary Switch |
| Cables and Connectors |
| Flathead Screws, Buttonhead Screw, Hex Nuts |
| Propeller, Quadcopter Kit |
| Infrared Thermal Imager Battery |
| Microcontrollers, Cables |
| Metal Enclosures Boxes |
| Connectors, Piezo, Temp Sensors |
| Power System, Batteries |
| Battery Management System, Cables |
| Cable & Module |
| Bearings, Spring Plunger, Retaining Rings, Thruster |
| Coat Parts |
| Breakers |
| Bearings, Shafts, Screws, Stainless Steel |
| Radio Frequency Amplifier |
| Fiber Optics |
| Thermal Pad, Coaxial Cable & Adapter, Tape |
| Cable Assembly |
| Steel & Conduit |
| Glue Gun, Screwdrivers, Hex Set |
| Tri-band Antennas |
| Electrical Metallic Tubing (EMT) Conduit |
| Software Defined Radio (SDR) |
| Servos |
| Wire, Test Leads |
| Tweezers, Soldering, Wire Cutters, Solvent Dispenser |
| Motherboards |
| Aluminum Sheets |
| Refrigerator |
| Personal Protective Equipment (PPE) |
| Remote Controlled Airplane, LiPo Battery |
| Radio Frequency Cable Attentuators |
| 6' Track |
| Bracket, Condensate Pump, Flex Duct, Sliding Door Roller |
| Propeller |
| Navigational Lights |
| Low Profile Very High Frequency Antenna |
| Quadcopter Components |
| Radio Frequency test equipment |
| Radio Frequency Field Strength Meter |
| Assorted Screws |
| Threaded Insert Kit |
| Gimbal camera |
| Gloves, Bleach, Drill, Allen Wrench Set |
Travel
| Origination | Destination | # of Days | # of Trips | # of FTEs |
| Cape Canaveral, FL | Augusta, GA | 5 | 3 | 3 |
| Cape Canaveral, FL | Avon Park, FL | 4 | 4 | 5 |
| Cape Canaveral, FL | Clarksburg, WV | 4 | 2 | 2 |
| Cape Canaveral, FL | Columbus, IN | 6 | 2 | 2 |
| Cape Canaveral, FL | Louisville, KY | 7 | 2 | 7 |
| Cape Canaveral, FL | Naples, FL | 5 | 2 | 4 |
| Cape Canaveral, FL | Nellis AFB, NV | 3 | 2 | 3 |
| Cape Canaveral, FL | Warsaw, Poland | 10 | 1 | 2 |
| Cape Canaveral, FL | Reston, VA | 3 | 5 | 2 |
| Cape Canaveral, FL | London, UK | 6 | 1 | 1 |
| Cape Canaveral, FL | Joint Base Anacostia-Bolling, Washington DC | 4 | 4 | 2 |
| Cape Canaveral, FL | Charlottesville, VA | 4 | 2 | 2 |
| Cape Canaveral, FL | Wright Patterson AFB, OH | 4 | 1 | 2 |
| Cape Canaveral, FL | Vietnam | 14 | 1 | 2 |
| Cape Canaveral, FL | Tampa, FL | 3 | 1 | 1 |
| Cape Canaveral, FL | Fort Liberty, NC | 6 | 1 | 1 |
| Cape Canaveral, FL | New York City, NY | 2 | 1 | 2 |
| Cape Canaveral, FL | Greenwood, SC | 5 | 2 | 3 |
| Cape Canaveral, FL | La Plata, MD | 3 | 1 | 1 |
| Cape Canaveral, FL | College Station, TX | 5 | 1 | 2 |
| Cape Canaveral, FL | Jacksonville, FL | 4 | 5 | 4 |
| Cape Canaveral, FL | Muscatatuck Training Center (MUTC) - Columbia City, IN | 6 | 1 | 5 |
File details come from the government source that posted it. Updated .