ATTACHMENT H - TS3 Price TemplateV3.xlsx
XLSX spreadsheet 76 KB Posted
- Attached to
- TECH SOUTH SUPPORT SERVICES (TS3)
- Solicitation number
- HHM40225R0017
- Issued by
-
Defense Intelligence Agency
About this file
This file is a Price Template for the Tech South Support Services (TS3) contract with the Defense Intelligence Agency (DIA), covering a 5-year period from September 15, 2025 to June 14, 2030. The pricing document outlines Contract Line Item Numbers (CLINs) for three primary mission areas: Effects-Based Technology Development, Advanced Capability Development, and Technology Evaluation, which span terrestrial, maritime, and airborne domains.
The price template shows incremental budget allocations across five base periods, with total Other Direct Costs (ODC) for materials at $5,325,000 and travel expenses at $1,050,000, resulting in a total CDRL cost of $6,375,000. The pricing is structured with increasing allocations for materials and travel each period, ranging from $1,000,000 to $1,120,000 for materials and $200,000 to $220,000 for travel. The document includes an extensive list of potential ODC materials such as electronic components, tools, sensors, protective equipment, and various technological devices that may be purchased during the contract's execution.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| CLIN | Description | Hours | Total Cost |
| CLIN 0001 | Task 5.1 | 0.00 | $ - 0 |
| CLIN 0002 | Task 5.1 Surge | 0.00 | $ - 0 |
| CLIN 0003 | Task 5.2 | 0.00 | $ - 0 |
| CLIN 0004 | Task 5.2 Surge | 0.00 | $ - 0 |
| CLIN 0005 | Task 5.3 | 0.00 | $ - 0 |
| CLIN 0006 | Task 5.3 Surge | 0.00 | $ - 0 |
| CLIN 0007 | ODC- Materials | $ 5,325,000 | |
| CLIN 0008 | Travel | $ 1,050,000 | |
| CLIN 0009 | CDRL |
Total Cost $ 6,375,000
&KFF0000UNCLASSIFIED
&K01+000 &A
&KFF0000
UNCLASSIFIED
&P of &N
BP- 0-12 Mo Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2025 - 9/14/2026 | ||||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | CLIN 0009 | |||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | CDRL PoP- 5 Years | |||||||||||||
| Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | ||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | 1,000,000 | Each | $ 1.00 | $ 1,000,000 | 200,000 | Each | $ 1.00 | $ 200,000 | ||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | ||||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ 1,000,000 | $ 200,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | - 0 | - 0 | - 0 | - 0 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
&KFF0000
&P of &N
BP- 12-24Mo Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2026 - 9/14/2027 | |||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||
| Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | |
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | 1,025,000 | Each | $ 1.00 | $ 1,025,000 | 205,000 | Each | $ 1.00 | $ 205,000 | |||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ 1,025,000 | $ 205,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | - 0 | - 0 | - 0 | - 0 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
&KFF0000
&P of &N
BP-24-36Mo Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2027 - 9/14/2028 | |||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC-Material | Travel | |||||||||||||
| Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | |
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | 1,120,000 | Each | $ 1.00 | $ 1,120,000 | 220,000 | Each | $ 1.00 | $ 220,000 | |||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ 1,120,000 | $ 220,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | - 0 | - 0 | - 0 | - 0 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
&KFF0000
&P of &N
BP- 36-48Mo Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2028 - 9/14/2029 | |||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||
| Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | |
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | 1,060,000 | Each | $ 1.00 | $ 1,060,000 | 210,000 | Each | $ 1.00 | $ 210,000 | |||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ 1,060,000 | $ 210,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | - 0 | - 0 | - 0 | - 0 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
&KFF0000
&P of &N
BP- 48-60Mo Office of Advanced Technologies Intelligence (ATI), Tech South Support Services (TS3)
| 9/15/2029 - 6/14/2030 | |||||||||||||||||||
| CLIN 0001 / 0002 (surge) | CLIN 0003/ 0004 (surge) | CLIN 0005/ 0006 (surge) | CLIN 0007 | CLIN 0008 | |||||||||||||||
| Labor Categories | Totals | SOW 5.1 Effects-Based Technology Development | SOW 5.2 Advanced Capability Development | SOW 5.3 Technology Evaluation | ODC- Materials | Travel | |||||||||||||
| Hours | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | QTY | Unit | Unit Price | Plug Price | QTY | Unit | Unit Price | Plug Price | |
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | 1,120,000 | Each | $ 1.00 | $ 1,120,000 | 215,000 | Each | $ 1.00 | $ 215,000 | |||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 | |||||||||||
| 0 | 0.00 | $ - 0 | 0 | 0.00 | - 0 | 0 | 0.00 | - 0 |
| Prime Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ 1,120,000 | $ 215,000 | |
| Subcontractor Labor Total | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||
| FTE TOTALS | - 0 | - 0 | - 0 | - 0 | ||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
&KFF0000
&P of &N
Labor Rate BoE Labor Catergories BP - 0-12Mo BP - 12-24Mo BP - 24-36Mo BP - 36-48Mo BP - 48-60Mo
&A
&KFF0000
&P of &N
ODC- Material Other Direct Costs (ODC) Materials:
The following table is an example of items that would be purchased by the contractor. These are items that have been purchased in the past. This is not an all-inclusive list, and includes a mixture of Equipment, Tools, Consumables, Shipping considerations, and IT equipment. While the exact make/model purchased may be different, the general scope/use of the item should be similar to the one researched and presented below. No items should be purchased without first providing information to the Government COR and ACOR that a requirement for an ODC purchase exists.
The contractor shall provide a request for approval to the Government COR and ACOR for items valued up to $10,000. The contractor shall provide a request for approval to the Contracting Officer via the Government COR and ACOR for items valued above $10,000.
| Uninterruptable Power Supplies (UPS) |
| Gyro Compass |
| Circuit Breakers |
| Screws, Washers, Pins, Punches, Springs |
| Filament |
| Wire, Inverter, Grounding Bar, Solar Controllers |
| Rotary Switch |
| Cables and Connectors |
| Flathead Screws, Buttonhead Screw, Hex Nuts |
| Propeller, Quadcopter Kit |
| Infrared Thermal Imager Battery |
| Microcontrollers, Cables |
| Metal Enclosures Boxes |
| Connectors, Piezo, Temp Sensors |
| Power System, Batteries |
| Battery Management System, Cables |
| Cable & Module |
| Bearings, Spring Plunger, Retaining Rings, Thruster |
| Coat Parts |
| Breakers |
| Bearings, Shafts, Screws, Stainless Steel |
| Radio Frequency Amplifier |
| Fiber Optics |
| Thermal Pad, Coaxial Cable & Adapter, Tape |
| Cable Assembly |
| Steel & Conduit |
| Glue Gun, Screwdrivers, Hex Set |
| Tri-band Antennas |
| Electrical Metallic Tubing (EMT) Conduit |
| Software Defined Radio (SDR) |
| Servos |
| Wire, Test Leads |
| Tweezers, Soldering, Wire Cutters, Solvent Dispenser |
| Motherboards |
| Aluminum Sheets |
| Refrigerator |
| Personal Protective Equipment (PPE) |
| Remote Controlled Airplane, LiPo Battery |
| Radio Frequency Cable Attentuators |
| 6' Track |
| Bracket, Condensate Pump, Flex Duct, Sliding Door Roller |
| Propeller |
| Navigational Lights |
| Low Profile Very High Frequency Antenna |
| Quadcopter Components |
| Radio Frequency test equipment |
| Radio Frequency Field Strength Meter |
| Assorted Screws |
| Threaded Insert Kit |
| Gimbal camera |
| Gloves, Bleach, Drill, Allen Wrench Set |
Travel
| Origination | Destination | # of Days | # of Trips | # of FTEs |
| Cape Canaveral, FL | Augusta, GA | 5 | 3 | 3 |
| Cape Canaveral, FL | Avon Park, FL | 4 | 4 | 5 |
| Cape Canaveral, FL | Clarksburg, WV | 4 | 2 | 2 |
| Cape Canaveral, FL | Columbus, IN | 6 | 2 | 2 |
| Cape Canaveral, FL | Louisville, KY | 7 | 2 | 7 |
| Cape Canaveral, FL | Naples, FL | 5 | 2 | 4 |
| Cape Canaveral, FL | Nellis AFB, NV | 3 | 2 | 3 |
| Cape Canaveral, FL | Warsaw, Poland | 10 | 1 | 2 |
| Cape Canaveral, FL | Reston, VA | 3 | 5 | 2 |
| Cape Canaveral, FL | London, UK | 6 | 1 | 1 |
| Cape Canaveral, FL | Joint Base Anacostia-Bolling, Washington DC | 4 | 4 | 2 |
| Cape Canaveral, FL | Charlottesville, VA | 4 | 2 | 2 |
| Cape Canaveral, FL | Wright Patterson AFB, OH | 4 | 1 | 2 |
| Cape Canaveral, FL | Vietnam | 14 | 1 | 2 |
| Cape Canaveral, FL | Tampa, FL | 3 | 1 | 1 |
| Cape Canaveral, FL | Fort Liberty, NC | 6 | 1 | 1 |
| Cape Canaveral, FL | New York City, NY | 2 | 1 | 2 |
| Cape Canaveral, FL | Greenwood, SC | 5 | 2 | 3 |
| Cape Canaveral, FL | La Plata, MD | 3 | 1 | 1 |
| Cape Canaveral, FL | College Station, TX | 5 | 1 | 2 |
| Cape Canaveral, FL | Jacksonville, FL | 4 | 5 | 4 |
| Cape Canaveral, FL | Muscatatuck Training Center (MUTC) - Columbia City, IN | 6 | 1 | 5 |