Exhibit_C_A003_Tech_Anal_&_Rpts.docx
DOCX document 33 KB Posted
- Attached to
- DTRA - AGENCY WIDE IT SERVICE DESIGN Federal contract opportunity
- Solicitation number
- HDTRA1-18-R-0045
- Issued by
- Defense Threat Reduction Agency
About this file
This document is a Contract Data Requirements List (CDRL) for a federal contract opportunity with the Defense Threat Reduction Agency. The CDRL requires the delivery of technical analysis reports and other technical documentation to support IT service design, engineering, and solution development. Reports may be requested by the Contracting Officer's Representative and shall be submitted electronically to distribution lists to be provided at time of award. The contractor format is acceptable with approval from the COR, and as a minimum, reports must include the contract number, contractor name, data item number and title, submission date, and point of contact information. Submission dates will be directed by the COR based on analysis and technical requirements.
Exhibit C - A003 Tech Anal & Rpts
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, Contract Data Requirements List
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0049, 1049
B. EXHIBIT
C
1. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
IT Service Design
1. CONTRACT/PR NO.
HDTRA1-18-R-0045
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Technical Analysis and Reports
1. SUBTITLE
Individual Task Order (TO) Number
4. AUTHORITY (Data Acquisition Document No.)
See Block 16. REMARKS
5. CONTRACT REFERENCE
TO 1 PWS Para. 3.2, 3.3, 3.4 and 3.6 TO 2 PWS Para. 3.1 and 3.2 TO 3 PWS Para. 3.2
6. REQUIRING OFFICE
. PRICE
GROUP (if applicable)
)DTRA IT-IR
7. DD 250 REQ
XX
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16. REMARKS
14. DISTRIBUTION
See Block 16. REMARKS
8. APP CODE
N/A
| F |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
See Block 16. REMARKS
18.
ESTIMATED
TOTAL PRICE
)b. COPIES
16. REMARKS
Block 4. Contractor format is acceptable with COR approval. As a minimum, the cover page or first page shall include the contract number, Contractor name, CDRL Data Item Number (A003) with Title and Subtitle (TO Number), the submission date and the inclusion dates of each analysis report’s contents, and the ‘Submitted By’ name and point-of-contact (POC) information.
The contractor shall develop and deliver technical analyses and other technical reports as required to support the IT service design, engineering, and solutioning process, or as requested by the COR.
Blocks 12. and 13. Submission of reports for analysis and technical requirements are at the direction of the COR (whether proposed by the Contractor or the COR). The reports shall be submitted electronically to the DISTRIBUTION in Block 14.
Block 14. DISTRIBUTION will be electronic to the following names and email addresses (to be provided at time of award).
a. ADDRESSEE
DRAFT
FINAL
| Reg |
| Repro |
IT-IR COR
PM (if other than COR)
AL-CS
AL-KO
AL- Division Chief
15. TOTAL
G. PREPARED BY
Mr. John Sheffer
H. DATE
I. APPROVED BY
Mr. John Sheffer
J. DATE
File details come from the government source that posted it. Updated .