SCIPIVATCH2SCHB.pdf

PDF 35 KB Posted

Attached to
Streamlined Construction Improvement Program (SCIP) IV with the Defense Commissary Agency (DeCA)
Solicitation number
HDEC03-17-R-0002
Issued by

About this file

SCIP IV Solicitation - Attachment 2 - Schedule B

View the file

Other files

File Type Posted
Amend_0006_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0006_-_Atch_1_-_HBMS_Report_-_Altus.pdf PDF
Amend_0005_-_Atch_2_-_Questions_&_Answers__6_(Rev_1).pdf PDF
Amend_0005_-_Atch_3_-_WD20170901_-_Altus.pdf PDF
Amend_0005_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0005_-_Atch_1_-_Questions_&_Answers__5_(Rev_1).pdf PDF
Amend_0004_-_Atch_2_-_Preproposal_Conf_Sign-in_&_Business_Cards_-_Altus.pdf PDF
Amend_0004_-_Atch_1_-_Preproposal_Conf_Agenda_-_Altus.pdf PDF
Amend_0004_-_Atch_4_-_Altus_AFB_Commissary_-_Addendum_01.pdf PDF
Amend_0004_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0004_-_Atch_3_-_Questions_&_Answers__4_(Rev_1).pdf PDF
Amend_0004_-_Atch_5_-_Schedule_B_(Rev_1)_-_Altus.pdf PDF
Amend_0003_-_Atch_1_-_Q&A_3_Rev_2_-_Altus.pdf PDF
Amend_0003_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0002_-_Atch_1_-_Q&A_2_-_Altus.pdf PDF
Amend_0002_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0001_-_HDEC03-17-R-0002_-_Altus.pdf PDF
Amend_0001_-_Atch_2_-_WD20170602_-_Altus.pdf PDF
Amend_0001_-_Atch_3_-_Q&A_1_Rev_1_-_Altus.pdf PDF
Amend_0001_-_Atch_1_-_Section_C_-_Altus.pdf PDF
SCIPIVATCH1SOW.pdf PDF
HDEC03-17-R-0002_SCIP_IV_Solicitation.pdf PDF
SCIPIVATCH3SSC.pdf PDF
SCIPIVATCH5WD-Highway.pdf PDF
SCIPIVATCH4WD-Building.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HDEC03-17-R-0002

Attachment 02

26 May 2017

SECTION B – SUPPLIES OR SERVICE AND PRICES SCHEDULE

ALTUS AFB COMMISSARY FACILITY

ALTUS, OK

DeCA Project No. WE16MI02

GENERAL: The Contractor shall provide all plant, labor, equipment, materials, mobilization, and the Work and general conditions directly associated with, and necessary to accomplish DeCA Project: WE16Ml02, in accordance with the contract documents and specifications.

CLIN DESCRIPTION QTY UNIT AMOUNT

0001 COMMISSARY BUILDING CONSTRUCTION: – Contractor shall provide all plant, labor, equipment, and materials necessary to perform the work to 5 ft. outside the Commissary Building and identified as “Construction” in the drawings and specification Section 01 11 00 “SUMMARY OF WORK”, except work specifically indicated in any other CLIN.

1 JOB

002 COMMISSARY EQUIPMENT: Provide all plant, labor, equipment, and materials necessary to complete all items specifically identified as “Equipment”” in specification Section 01 11 00 “SUMMARY OF WORK”, except for requirements indicated in CLIN 0004.

1 JOB $______________

0003 COMMISSARY BLDG MAINT AND REPAIR: Provide all plant, labor, equipment and materials necessary to complete all items specifIcally identified in specifications section 01 11 00 "SUMMARY OF WORK" specified as "Facility Maintenance and Repairs…”.

1 JOB $______________

0004 MAINT & EMERG REPAIR FOR HVAC & REFRIG: Contractor shall provide all plant, labor, equipment and materials necessary to perform the requirements identified in specification Section 23 01 0 0 “Maintenance And Repair For HVAC And Refrigeration”. (NTE $10K unless approved by the CO)

TOTAL AMOUNTS FOR CLINS 0001THRU 0004

1 JOB

$_10,000.00_____

File details come from the government source that posted it. Updated .