This solicitation requests proposals for an indefinite delivery/indefinite quantity contract to provide electromagnetic spectrum services, applied engineering, spectrum and electromagnetic environmental effects engineering analysis support to the Defense Spectrum Organization. Key details include the requirement to analyze equipment and systems for potential electromagnetic environmental effects issues and recommend solutions, perform radio frequency measurements, assist with acquiring host nation approval for equipment operation, and analyze national and international electromagnetic spectrum issues to advise policymakers. The period of performance is five years with an estimated start date of March 2021. Pricing is to be fixed price for labor and cost reimbursable for other direct costs and travel. The total contract value is not to exceed $36.7 million over the five-year period. Proposals are due by December 3, 2020.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Q&A INSTRUCTIONS: The purpose of these specific instructions is to expedite the process of answering questions. Please do not change the format of this document. |
| Complete the spreadsheet tab below named "Q&A" with all questions, comments, and recommendations about the RFP. Examples provided in the spreadsheet. **Please delete the examples before submitting your questions. |
COLUMN A: Complete the "Page" column. This is the page number from the RFP located in the upper right hand corner of the page. Do not include the total page number. Enter only the page number where the topic begins.
COLUMN B: Complete the "Section/Paragraph" column with the applicable section and paragraph number (if applicable) of the RFP. For example: B2, C, or L5.1.2. For a section and paragraph number reference do not place a dot between the letter and the first number. Additional subparagraph references should be separated with a dot regardless of the format in the RFP, for example, L5.1.2.a. Do not including any other extraneous identifiers or other information other then instructed here. If the reference is to a CLIN, Clause, Appendix, or Attachment etc. the entry goes in the next column. At a minimum you will always insert at least the Section letter A through J in this column.
COLUMN C: Complete the "CLIN/Clause/Other" column. Insert the CLIN, Clause, Provision, Appendix, or Attachment number. For example: CLIN 0001, 52.217-8, Appendix A, or Attachment L3. Insert the section letter only in the Column B. This column will be completed only when there is not a more precise RFP reference number. NOTES: CLINs are in Section B. Most sections contain clauses so ensure you reference the correct section.
COLUMN D: Complete the Questions/Comments/Recommendations column. Start the question by referencing the topic. This may help the sort process. For example: Minimum Qualifications Checklist or Performance Area 10. Then insert the question or comment.
olicitation
Q&A
| # | RFP Page | RFP Section/ Paragraph | CLIN/ Clause/Appendix/Attachment/Other | Questions/Comments/Recommendations | Government Response |
| 1 | 1 | SF-33, Block 9 | N/A | With two federal holidays occurring in November including a traditionally extended Thanksgiving holiday, and given industry may receive answers to questions with few days remaining until proposal submission, we request proposal due date be changed to 18 Dec 2020 at 1400 Eastern. | The Government will allow extension of proposal due date to 03 December 2020 at 1400 Eastern time. |
| 2 | 3 | B | ATT J1 - Pricing Template | Can the Government confirm that when the RFP is referencing the Labor Rate Table in Attachment #J1 it is referring to the FP Rate Sheet tab of Attachment #J1? | Correct |
| 3 | 4 | B (C) | ATT J1 - Pricing Template | Is it the Government intent that the mark-up for ODCs will be fixed for proposal purposes only and will be reimbursed at actual cost plus indirects on Task Order execution? | Correct |
| 4 | 4 | B (C) | ATT J1 - Pricing Template | Can the Government confirm where Offerors should indicate their ODC mark-up percentages since there is no subsection for ODCs in the FP Rate Sheet tab of Attachment J1 - Pricing Template? | This information can be provided in the Pricing Narrative |
| 5 | 14 | C.11.3 | 11.3 Investigation Requirements. All personnel requiring SCI, Top Secret or IT-II access under this contract shall undergo a favorably adjudicated Tier 5 investigation (formerly known as a Single Scope Background Investigation (SSBI)) as a minimum requirement. |
11.3.1 All personnel requiring Secret or IT-II access under this contract shall undergo a favorably adjudicated Tier 3 (T3) Investigation formerly known as a National Agency Check, Local Agency Check and Credit Check or Access National Agency Check and Inquiries as a minimum investigation.
11.4 Adjudication for IT-II access. Favorable Adjudication of any previous Tier 5, Tier 5R, SSBI, SBPR or PPR by any of the DoD Central Adjudication Facility or other federal adjudications facilities within a six-year period will be automatically accepted for final IT-II access.
11.4.1 Interim IT access. Prior to granting interim IT-II authorization, the supporting security manager will forward a written request for interim IT-II authorization to DISA PSO for approval. The request for SSBI (via e-QIP, FBI name and fingerprint check) must be submitted by DISA PSO to the Office of Personnel Management (or applicable security agency).
| Paragraphs 11.3, 11.4 and 11.4.1 seem to address the investigative requirements for IT-I access whereas paragraph 11.3.1 addresses IT-II access. If Top Secret and/or SCI is also required along with the IT-II access then the investigative requirements would apply to those levels of security clearance. Because those investigative requirements exceed the requirements for IT-II, they would meet the IT-II requirements. Are Paragraphs 11.3, 11.4 and 11.4.1 intended to address IT-I? Please clarify the investigative requirements. | Paragraphs 11.3, 11.4 and 11.4.1 are only applying to IT-II access. IT-II access is the only requirement. | |||||
| 6 | 32 | G3 TASK ORDER PROCEDURES (i) Fixed Price (FP). | RFP language: "The proposal shall identify labor categories and their respective labor rates in accordance with the Labor Rate Tables contained in Section J, Attachment B1 of the base IDIQ contract, and the number of hours required for performance of the task." | Can the Government clarify where Offerors can find Attachment B1 within the RFP package or is the intent of this language to reference the FP Rate Sheet tab of Attachment #J1 assuming that it will become part of the subsequent contract after award? | The correct reference is the FP Rate Sheet tab of Attachment #J1. | |
| 7 | 43 | H9 | ATT J5 | H9 states "A Secret Facility Site Clearance is required throughout the life of the contract." However the DD 254 Block 1.a requires a Top Secret Facility Clearance. Please clarify the Facility Clearance requirement. | Revised H9 to state that a Top Secret Facility clearance is required. | |
| 8 | 87 | L.1.E | E. Organizational and Consultant Conflict of Interest (OCCI). |
Each offeror shall specifically identify in its proposal whether or not any potential or actual OCCI, as described in Federal Acquisition Regulation (FAR) Subpart 9.5, exists for this procurement. If the offeror believes that no OCCI exists, the OCCI response shall set forth sufficient details to support such a DD254, DoD Contract Security Classification Specification. Offerors must complete Block 6 of the attached DD254 with the appropriate information for their companies. Completed DD254’s must be submitted with proposals provided in Section J, Attachment 5. Security classification requirements must be met at time of proposal submission.
| L.1.E appears to mix OCCI requirements with instructions for completing the DD254. Please clarify the two requirements. | Revised section L.1.E to clarify. | |||||
| 9 | 88 | L.1.F / Table L1 | Please identify what information is required / expected in the Transmittal Letter. | A Transmittal Letter provides basic summary or overview addressing the RFP (i.e Name of Contractor, RFP Title/Number, Contractor POC, Cage Code, address, etc..) | ||
| 10 | 88 | L.1.F / Table L1 | Only Volume V shows a Table of Contents and Glossary. Does that mean the Table of Contents and Glossary contained in Volume V is to be a Table of Contents and Glossary for the entire proposal or are Tables of Contents and Glossaries also permitted [expected] in Volumes II, III, and IV? | The Table of Contents and Glossary contained in Volume V is to be a Table of Contents and Glossary for the entire proposal. | ||
| 11 | 89 / 92 | L.1.H / L.3.7 | Do the requirements of L.1.H apply to the "readme" file specified in L.3.7 and should it be provided as a separate file or included in Volume I as an Attachment? | The readme file applies to L.1.H. It should be provided as an attachment to Volume I | ||
| 12 | 88 / 89 | L.1.F Table L1 / L.2.1(d) | Table L1 shows "Representations and Certifications" as being included in Volume V while L.2.1(d) show Section K to be part of the Price Proposal. Please clarify in which Volume Section K is to be included. | Representations and Certifications should be submitted in Vol V. Section L.2.1(d) mainly requires the section to be completed and returned with proposal submission | ||
| 13 | 89 | L.2. Specific Instructions: 1. (e) Price Reasonableness and Completeness | ATT J1 - Pricing Template | The RFP States "Information beyond that required by this instruction shall not be submitted, unless considered essential to document or support the cost/price position." Can the Government confirm that since this is FFP, they are not expecting a detailed cost buildup unless there is not sufficient competition? | Confirmed | |
| 14 | 89 | L.2. Specific Instructions | Are the subcontractors required to submit anything directly to the Government? | Subcontractors are only required to submit their pricing template if supporting a Prime contractor responding to this RFP | ||
| 15 | 89 / 91 | L.1.H / L.2.5 | L.2.5 states "(c) Typing shall not be less than 12 point Times New Roman." which appears to be inconsistent with the requirements stated in L.1.H Page Size and Format. Please clarify the Font requirement for text. | The Font may be Arial, Times New Roman, or Courier New. Section L.2.5 is revised. | ||
| 16 | 90 | L.2.3 | Please confirm the items [i - ix] listed in (b) Performance Surveys constitutes the required content of each Past Performance [3 pages each] citation submitted. | Confirmed | ||
| 17 | 89 / 90 | L.1.J / L.2.2 | ATT L4 | PART II – TECHNICAL/MANAGEMENT PROPOSAL seems to require that a completed Attachment L4 be included in Volume II however given the significant pricing content of Attachment L4, request the DISA Subcontracting Plan Review Checklist be inculded as an Attachment to Volume IV Price Narrative. | Attachment L4 - DISA Subcontracting Plan Review Checklist is to be included in Volume V | |
| 18 | 90 | L.2.3(a) | Quality and Satisfaction Rating for Contracts Performed in the Past Five Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract. Is the infromation requested in this paragraph exempt from the three page limit for each reference? | This information should be included in the three page limit. | ||
| 19 | 90 | L.2.3(b) | Performance Surveys: The Government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The Government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Is the infromation requested in this paragraph exempt from the three page limit for each reference? | This information should included in the three page limit. | ||
| 20 | 91 | L.3( c) | ATT L3 | Are Subcontractor / Teaming Partner Consent Letters to be submitted directly to the Government as a separate file in each Subcontractor's submission or is the Prime to include them in their submission to the Government? If the Prime, are they to be included as separate Attachments to Volume III? If submitted by the Prime as separate Attachments to Volume III, please confirm they are not counted against the page limits. | The Prime should include them in their submission as an Attachment to Volume III. They will not be included in the page limit. | |
| 21 | 94 | M.1.C | ATT L2 | The Performance Confidence Assessment seems to imply that the Government will be sending the Questionnaires to the identified Government customers. Please clarify who will send the Questionnaires. | the Questionaires templates have been provided so the Contractor can provide them to the customer to complete. The customer is to submit them to the Government with RFP# as reference (KO & CS identified in the RFP). | |
| 22 | 94 | M.1.C | ATT L2 | If the Offeror is to send the Questionnaires to their Government customers, when are they due to be returned to DISA/DSO? | The responses are due by the date of Proposal submission or sooner. Anything submitted after the response timeline may not be considered for evaluation. | |
| 23 | 94 | M.1.C | ATT L2 | If the Government is to send to the Offeror's customers, is the Offeror to complete the top of the form and include one for each reference in the proposal? If so, are they to be submitted as part of Volume III and if so, are they exempt from the three page limit for each reference? | (see response to Question 21) The contractor is to send to their customers for completion.The questionaire is limited to 3 page limit for each reference | |
| 24 | ATT J1 - Pricing Template | Can the Government confirm the intent of columns J through O "Blended Contract/Schedule Rate (if necessary)" located in the FP Rate Sheet tab of Attachment J1 - Pricing Template? Assuming that Offerors are to include their proposed fully burdened through fee labor rates (FBLR) for the PoP of the IDIQ base periods in columns D through H, is the intent of columns J through O for Offerors to provide their FBLR on future TO proposals? | The "FP Rate Sheet" Worksheet has been modified to eliminate the Blended Contract/Schedule Rate (if necessary)" data from this worksheet. The FP rates submitted for final proposal shall be used for TO's issued under this contract. | |||
| 25 | Page 87, 88, 89, 90 | L.1. Para A. |
L.2, 1. Part 1 Price Proposal
2. Part II Technical/Management Proposal
| 3. Part III - Past Performance Information | There are multiple references to Part I - Price Proposal, Part II – Technical/Management Proposal, and Part III - Past Performance Information, this conflicts with terminology of the structure as defined in Table L.1 - Proposal Organization. | ||||
| Question: Which response structure is correct? | Revised L.2 Specific Instructions. Table L.1 is correct | ||||
| 26 | 88 | F. Organization/Number of Copies/Page Limits. | |||
| Table L1 - Proposal Organization | "The offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table L1 below). The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 1. The contents of each proposal volume are described in the information to offerors paragraph as noted in the table below." | ||||
| Request: Please enhance section L.2 to provide Specific Instructions for Volume I Executive Summary and Volume V Contract Documentation, as outlined in Table L1. | Revised Section L.2. | ||||
| 27 | 88, 90 | Table L1 - Proposal Organization | |||
| 2. Part II Technical Management | Attachment L4 is referenced twice for response location - [Table L1], Vol V Contract Documentation: "Complete Attachment L4 - DISA Subcontracting Plan Review Checklist" and [RFP L.2.2] Vol II Subfactor 5 Small Business Participation, Complete Attachment L4 - DISA Subcontracting Plan Review Checklist | ||||
| Question: Which Volume (Volume II or Volume V) is correct? If Volume II, please confirm the checklist doesn't count towards the page limitations. | Revised. Attachment L4 - DISA Subcontracting Plan Review Checklist is to be included in Volume V | ||||
| 28 | 90, 89 | L.2.2, L.1.J | RFP L.2.2 includes specifies that Attachment L4 - DISA Subcontracting Plan Review Checklist be included in Volume II, Technical/Management. (The checklist includes pricing information. RFP L.1.J states "All cost or pricing information shall be addressed ONLY in the Cost/Price Proposal Volumes." Requests: Please confirm that the checklist is not suitable for inclusion in Volumes I, II, III or V and therefore must be a part of Volume IV or a separate Volume. Please specify the location for the DISA Subcontracting Plan Review Checklist. | Revised. Attachment L4 - DISA Subcontracting Plan Review Checklist is to be included in Volume V | |
| 29 | 90 | 3. Part III Past Performance Information, | |||
| (c) Subcontractor Consent | Question: Does the subcontractor consent count against the 3 page limit for each past performance reference? | This does not count towards the page limit. | |||
| 30 | 89 | H. Page Size and Format. | "...Pages shall be single spaced with 1.5 line spacing…." | ||
| Question: Did the government mean single spacing for text and 6pt spacing added between paragraphs? | Revised to: "Pages shall be single spaced." | ||||
| 31 | 88, 87, 91, 92 | L.1.G, L.1.K, L.1.E, L.2.3.b, L.2.4, L.3.7. | Request: Please confirm that the following items will not be considered when calculating page limits: Cover Pages, Glossary of Acronyms and Abbreviations (Per L.1.K), Table of Contents, List of Figures, List of Tables, OCCI Analysis and Supporting Information (as specified in RFP L.1.E), Teaming Arrangement Information (Per L.2.3.b), Subcontractor Consent Letters (Per RFP L.2.4), and "read me" file (Per RFP L.3.7). | Confirmed | |
| 32 | 89, 91 | L.1.H, L.2.5.(c) | L.1.H states "For tables, charts, graphs and figures, the text shall be no smaller than 10 point...". L.2.5 (c) states for Part II and III "Typing shall not be less than 12 point...". | ||
| Request: Please confirm that tables, charts, graphs and figures must be no smaller than 10 point for all portions of the proposal. | Confirmed | ||||
| 33 | 4, 33 | RFP B1(C) and RFP G(5)(i) | Section B1(C) states, "A mark-up percentage for associated indirect loadings ...shall not be applied to the ODCs." However RFP G(5)(i) states, " Profit is not allowed on ODCs for any task order; however applicable burdens are allowed IAW contractor’s accounting practices." | ||
| Question: Are the ODC plug numbers inclusive of the applicable procurement burdens? | ODC plug numbers are not inclusive of procurement burdens | ||||
| 34 | 43, 12 | RFP H9 and PWS 11.1 | RFP H9 states, "A Secret Facility Site Clearance is required throughout the life of the contract." PWS 11.1 states, "...the company must have a final Top Secret Facility Clearance (FCL) from the Defense Counterintelligence and Security Agency by time of proposal." | ||
| Request: Please confirm that a TS FCL is required at the time of submission. | Confirmed | ||||
| 35 | 93 | RFP M.A | No evaluation factors are listed for Volume I, Executive Summary. | ||
| Request: Please provide the evaluation criteria for the Volume I. | Vol I - Executive summary is not being evaluated, it should be a summary of your proposal submission | ||||
| 36 | 88 | RFP L.1 Table L1 | Request: Please confirm that the Read Me file (per L.7) can be delivered as a file attached within Volume I, Executive Summary. | Confirmed | |
| 37 | N/A | Pricing Template | The pricing spreadsheet "BP YR n" tabs include a column for "Proposed Labor Hours". Since this is an IDIQ contract, the requirements for and the quantity of the task orders is not specified. Therefore, offerors cannot accurately estimate the labor hours required. | ||
| Request: Please provide the number of hours required for each labor category for each CLIN. | See revised Attachment J1 - Pricing Template | ||||
| 38 | 94 | M.A | RFP M.A specifies "All offerors shall provide their proposed goals in terms of percentages and the total dollars planned to be subcontracted, specifying the total dollars planned to be subcontracted to the various types of small and small disadvantaged businesses." in Volume II, Technical/Management. Also M.A states " offerors shall identify by name, type of business, product/service, dollar value, ..." in Volume II, Technical/Management. RFP L.1.J states "All cost or pricing information shall be addressed ONLY in the Cost/Price Proposal Volumes." | ||
| Request: Please clarify the requirements for small business cost information in Subfactor 5 Volume II, Technical/Management. | Revised L.1.J | ||||
| 39 | N/A | Attachment L4 | Attachment L4 - DISA Subcontracting Plan Review Checklist is marked "Source Selection Sensitive" and "FOUO". | ||
| Request: Please confirm that the attachment posted on sam.gov is neither FOUO nor Source Selection Sensitive when not filled in. | Confirmed | ||||
| 40 | 88, 89 | Table L1, L.1.J | RFP Table L1 - Proposal Organization includes the Small Business Subcontracting Plan in Volime II, Technical/Management. Our Small Business Subcontracting Plans include cost and price information. RFP L.1.J states "All cost or pricing information shall be addressed ONLY in the Cost/Price Proposal Volumes." | ||
| Request: Please confirm that we are not required to include the Small Business Subcontracting Plan in Volume II and that we may supply our Small Business Subcontracting Plan as a separate Volume including cost/price data. | Revised. Attachment L4 - DISA Subcontracting Plan Review Checklist to be included in Volume V | ||||
| 41 | 94 | M.A | M.A, Subfactor 5 paragraphs 2 and 3 appear to be requirements for the Small Business Subcontracting Plan rather than evaluation factors for Subfactor 5. | ||
| Request: Please clarify how the second and third paragraph will be used to evaluate the Small Business Participation Plan. Could M.A, Subfactor 5 paragraphs 2 and 3 have been intended to be Subfactor 6? | Small Business Participation plans will be evaluated by the KO as acceptable/unacceptable based on the offeror’s explanation and justification in achieving their proposed goals. |
Paragraphs 2 & 3 are not intended to be Subfactor 6
| 42 | 70, 87 | Attachment J5 | Question: Does the Government intend to provide a fillable DD254 form for our submission? The instructions state to complete box 6 on the DD254. The DD254 form that we are to complete is locked from editing. | Attached editable version | |
| 43 | 70, 87 | Attachment J5 | Question: Does the Government want Block 13 of the DD254 filled out to replace the XXX's with "secondary place of preformance" if we have other locations to provide? | Yes, the attached is just a template example. However, recommend identifying place where the work will primarily take place | |
| 44 | 88, 92 | L.1. Specific Instructions and Table L1, | RFP Table L1 states that the completed SF 33 form should be submitted in Volume V. RFP L.2.1.a states that the completed SF 33 form needs to be submitted in Volume IV. | ||
| Question: Please advise if this form needs to be submitted in both Volumes. | The SF 33 should be submitted in Volume V. | ||||
| 45 | 88, 92 | L.1. Specific Instructions and Table L1, | RFP Table L1 states that the Representations and Certifications should be submitted in Volume V (Section K). RFP L.2.1.a states that Section I through Section K needs to be submitted in Volume IV. Please advise if Section K needs to be submitted in both Volumes. | Representations and Certifications should be submitted in Volume V | |
| 46 | 88, 94 | Table L1 and M.2 | Table L1 designates Past Performance as Factor 2. M.2 designates Price Evaluation as Factor 2. Request: Please clarify the Factor number for the Price Evaluation and the Factor number for the Performance Confidence Assessment. | M.B revised. | |
| 47 | 90 | Section L.2.3(b) | The solicitation states that "Relevant contracts may include efforts in a variety of sizes, a variety of disciplines, and varying degrees of technical complexity." | ||
| Question: Will proposal responses be deemed compliant if offerors reference work provided under an IDIQ as one of the citations in the Past Performance volume? | Yes, since the work being performed is at the order level it would be considered more in line with the scope of magnitude at the order level since no work is done at the IDIQ base level. | ||||
| 48 | 34 | G4 Contract Level Small Business Participation Plan Reporting | Question: Would a bidder be allowed to deviate from the Government defined reporting schedule for their Government Semi-Annual Subcontracting Report for Prime Contracts to align with their corporate reporting as long as reports are made semi-annually? | The bidder will have to follow the current established reporting procedures that are required: For contracts with DoD Contracts report semi-annually on the Federal Government’s fiscal year: |
▪ 1st reporting period October 1st thru March 31st
▪ 2nd reporting period October 1st thru September 30th 49 n/a n/a Request: Please provide the required validity period for the proposal. Revised.
Proposals shall be valid for 90 calendar days from the proposal due date.
| 50 | 8 | 6.3 Task 3 | The performance standard of MIL-STD-461F testing appears to be outdated and was replaced by MIL-STD-461G in 2015. Could the Government please confirm that the test standard should be MIL-STD-461G? | MIL-STD-461G is correct. | |
| 51 | 3 | B1 | The period of performance is identified as a five-year period, but no identification is given on an assumed start date for performance. Will the Government please clarify the start date for pricing purposes? | Estimated award date is March with POP starting Mar/Apr 2021 | |
| 52 | 13 | 11.2 | The security clearance table identifies under the heading "Applicable Positions" a reference to a Technician position. The Attachment J2 Labor Category Description file does not include a Technician position. Would the Government please clarify? | Attachment J2 includes all required labor categories. | |
| 53 | 13 | 11.2 | Attachment J2 | The positions listed on page 13 include: |
- Electronics Engineer/Engineering Technician/Spectrum Manager (levels: senior, mid, and entry)
- Telecommunications Specialist (mid-level)
- Information Program Manager
However, Attachment J2 Includes:
- Program Manager (Senior)
- Electrical / Electronics Engineer (senior, mid, entry)
- Telecommunications Engineer (senior, mid)
Would the Government please clarify which positions are required, as Attachment J2 and page 13 of the Solicitation do not list the same labor categories?
Are the following labor categories all required?
- Electronics Engineer (levels: senior, mid, and entry)
- Engineering Technician (levels: senior, mid, and entry)
- Spectrum Manager (levels: senior, mid, and entry)
- Telecommunications Specialist (mid-level)
- Information Program Manager
- Program Manager (Senior)
- Electrical / Electronics Engineer (senior, mid, entry)
| - Telecommunications Engineer (senior, mid) | Attachment J2 includes all required labor categories proposed by the Government. However the offeror can propose LCATS that are in line that substitute any proposed LCAT. | ||||
| 54 | Attach J1 | FP Rate Sheet | Column J-O of the FP Rate Worksheet is labeled as " Blended Contract/Schedule Rate (if necessary)." Would the Government please clarify if bidders are required to fill in rates by FY or if completing FP rates by Contract Periods (columns D-H) is sufficient and Cols J-O may be left blank? If FY rates are required, would the Government please clarify if FY refers to Government Fiscal Year or Contractor Fiscal Year? | See the answer to question #24. | |
| 55 | 90 | L.2.3(a) Quality and Satisfaction Rating for Contracts Performed in the Past Five Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract. Efforts performed more than 5 years prior to the issuance of this solicitation will not be further evaluated. | Given the current page limitation for each Past Performance submittal, would the Government please consider allowing an Appendix (with no page limit) to contain any information currently available (letters, metrics, customer surveys, independent surveys, etc.), which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract? | No | |
| 56 | 90 | L.2.3(a) In addition, explain corrective actions taken in the past, if any, for substandard performance and any | |||
| current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc. | Given the current page limitation for each Past Performance submittal, would the Government please consider allowing an Appendix (with no page limit) to contain corrective actions taken? | No | |||
| 57 | 90 | L.2.3(b-c) Performance Surveys. |
If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present relevant contracts.
(c) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past
| performance information to the prime contractor. | Given the current page limitation for each Past Performance submittal, would the Government please consider allowing an Appendix (with no page limit) to contain the Teaming Arrangement information and the Subcontractor Consent Letter? | The Teaming Arrangement information does not count towards the page count | |
| 58 | 2 | Item No 0001 - The Contractor shall provide labor to complete the requirements in accordance |
with EMS Applied Engineering, Spectrum and E3 Engineering Support PWS
| Tasks 1 - 5, individual task orders, and basic contract on an as-required basis. | CLIN 0001 states that this CLIN is on an "as-required basis" and no Level of Effort or full time equivalents for the labor categories are included in the RFP. Would the Government please clarify what Offerors are to provide with regard to price in CLIN 0001? | See revised Attachment J1 - Pricing Template | ||||
| 59 | 3 | CLIN 9999 | CLIN 9999 states that "an equal amount will be deducted from the Surge CLIN not-to-exceed amount"; however, there is no not-to-exceed amount included in attachment J1 or in schedule B. Would the Government please clarify what the Surge CLIN not-to-exceed value is for bidding purposes? | The Surge CLIN not-to-exceed amount is 20% of the contractor’s total proposed price. | ||
| 60 | 3 | CLIN 9999 | The Surge CLIN indicates it is a COST CLIN. However, the RFP states that "surge support will be provided at the same labor rates proposed and found fair and reasonable at time of contract/task order award for the applicable period of performance." Since Labor Rates are FFP, does the Government intend to execute at the FFP versus the COST of labor for the Surge CLIN? | Surge will be exercised at the FFP labor rates. | ||
| 61 | 4 | (C) ODCS | Page 4, Section C of ODCs states: "A mark-up percentage for associated indirect loadings and profit percentage for FFP task orders shall not be applied to the ODCs. These costs will be reimbursed at cost. The contractor’s mark-up percentages shall be fixed for the duration of the contract. These percentages shall be indicated on the Labor Rate Table under the ODCs." The first part of the instructions states that no mark-up percentage is to be applied to ODCs; however, the second part of the instructions states that mark-up percentages shall be fixed for the duration of the contract. Would the Government please clarify if the Offeror is or is not to include mark-up percentages on ODCs? | RFP G(5)(i) states, " Profit is not allowed on ODCs for any task order; however applicable burdens are allowed IAW contractor’s accounting practices." | ||
| 62 | 4 | (B) Labor | Attachment J2 | Page 4, Section (B) states: "(B) Labor. Attachment #J1- shall include a Labor Rate Table that represents fully burdened hourly rates for each |
skill classification." However, Attachment J1 is requesting pricing for each PWS section with no associated Level of Effort (LOE).
1. Would the Government please clarify if the Offeror is to provide a labor rate for each skill classification identified in the RFP?
| 2. Would the Government please clarify how the Offeror is to price the CLIN summary sheet? | Yes, the offeror is to provide a labor rate for each skill. See revised Attachment J1 - Pricing Template | |||
| 63 | 4 | (B) Labor | Attachment J1 | |
| Attachment J2 | Would the Government please clarify if the Offeror is to propose one full-time equivalent (FTE) for each labor category (RFP page 13 and Attachment J2, LCAT listed below) as our Attachment J1 pricing submission? |
- Electronics Engineer (levels: senior, mid, and entry)
- Engineering Technician (levels: senior, mid, and entry)
- Spectrum Manager (levels: senior, mid, and entry)
- Telecommunications Specialist (mid-level)
- Information Program Manager
- Program Manager (Senior)
- Electrical / Electronics Engineer (senior, mid, entry)
| - Telecommunications Engineer (senior, mid) | See revised Attachment J1 - Pricing Template | |||||
| 64 | 91 | Section L, Paragraph L.3 Electronic Offers | Would the Government please consider allowing electronic submission via DoD Safe, as it allows for a more secure and reliable method to send large files? | No, the offerors are to follow the RFP requirements of size submittals. Offerors can submit multiple emails to meet the size limit for submission of proposals, and recommended to follow up for confirmation of receipt. | ||
| 65 | 7 | 6.1.2 | Would the Government please clarify whether the sophisticated coupling models and interference prediction tools are provided by the Government or are Contractor developed? | they are GFE | ||
| 66 | 7 | 6.1.3 | Would the Government please clarify what Specific Sophisticated Tools? Contractor developed or existing JSC/DSO tools? | they are GFE | ||
| 67 | 7 | 6.1.4 | Would the Government please clarify whether we should use the following standards for the performance of RADHAZ analyses: DoD Instruction 6055.11, USAF TO 31Z-10-4, AFI 91-208, NAVSEA OP 3565/NAVAIR 16-1-529, IEEE Standard C95.1™2005? | The standards only provide safe criteria, not speccific RADHAZ methodology. | ||
| 68 | 10 | Performance Standards "All Tasks - Technical Support" | Attachment J2 | The RFP states on page 10 "The contractor must provide the appropriate response (in-house analytical and deployed staff) to resolve interference events." |
1. Can the USG please clarify if the response team is comprised of the labor categories cited on page 13 of the RFP and in Attachment J2?
| 2. Also, can the USG please provide a level of effort of number of hours anticipated for respond to resolve interference events? | The LCATS in J2 are current proposed LCATs being used. If the offeror proposes an alternate LCAT, it should be in line with the skills required to complete the work for the contract. | ||||
| 69 | 10 | Performance Standards "All Tasks - Technical Support" | Attachment J2 | The RFP states on page 10: "The contractor must provide the appropriate response (in-house analytical and deployed staff) to resolve interference events." |
| Could the Government please provide a level of effort or the number of hours anticipated for the response staff to resolve interference events? | All the task orders on this contract are TBD. Therefore it is impossible to predict exactly how many hours will be required to resolve interference events that are yet to be identified. See revised Attachment J1 - Pricing Template | |||
| 70 | 10 | 8. Incentives and Disincentives | The RFP states under incentives that "This is a FFP contract," and under disincentives states that "Individual Task orders will be FFP. |
| Could the Government please clarify that the IDIQ and the Task Orders are FFP? | The IDIQ and Task Orders are FFP with cost reimbursable ODC and travel CLINs. | |||
| 71 | 11 | 8. Incentives and Disincentives | The RFP states under incentives that "This is a FFP contract," and under disincentives states that "Individual Task orders will be FFP." |
| Could the Government please clarify that at the IDIQ level, the FFP is for labor rates only? | All rates and labor associated with CLIN 0001 are FFP. | |||||
| 72 | 16 | 13. Other Pertinent Information or Special Considerations section c. Identification of Non-Disclosure Requirements | The embedded attachment does not open. Would the Government please provide the Non Disclosure Agreement for DISA? | The NDA will be provided when the contract is awarded, however a template is attached as reference. | ||
| 73 | 18 | QASP 3. Roles and Responsibilities | The QASP identifies Program/Project Manager (PM) in the QASP roles and responsibilities section. Would the Government please clarify whether this position is the Government or Contractor PM position? | Contractor position | ||
| 74 | 21 | QASP 6. Unacceptable Performance | This section references Appendix 3, Customer Complaints. Could the Government please provide Appendix 3? | Appendix 3 is provided at the end of the QASP in the original Solicitation | ||
| 75 | 21 | QASP 7. Unacceptable Performance | This section states: "The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract." Would the Government please clarify when the Contractor is required to submit initial proof of compliance with regulatory and compliance items in the contract? | Within 30 days of contract award. | ||
| 76 | 32 | G3. (i) Fixed Price | This section references "Labor Rate Tables contained in Section J, Attachment B1." Could the Government please clarify that the labor rate tables are Attachment J1? | The correct reference is Attachment #J1. | ||
| 77 | 94 | M-1.A Subfactor 5 Small Business Participation | Will the Government please provide the preferred goal percentages for small business? | There is no preferred subcontracting goal. | ||
| 78 | 87 | Section L.1.E OCCI | Would the Government please clarify if the Offeror is to provide the DD254 for subcontractors as well as part of the proposal submission? | Yes, a DD254 should be submitted for each contractor | ||
| 79 | 88 | L.1.G and Table L-1 Proposal Organization | Section L.1.G states each page shall be counted except resumes. However, Table L-1 states there is a three-page maximum per resume? Could the Government please clarify that there is a three-page maximum per resume? | Revised L.1.G. Resumes are limited to three pages. | ||
| 80 | 94 | L.3.4 | Would the Government please clarify if the cover page is exempt from page count? | Cover pages are exempt from page count. | ||
| 81 | 94 | L.3.4 | Would the Government please clarify if a cover page is required for each volume? | Not required. | ||
| 82 | 92 | L.3.7 | Would the Government please clarify that the "readme" file included in Volume I is excluded from page count? | Yes | ||
| 83 | 91 | L.2 Part 3 c Subcontractor Consent | Would the Government please clarify that the subcontractor consent letters that are part of Part III Past Performance Information are excluded from page count? It is not clear how to provide this as part of the three-page per contract PP page count requirement, as this information is not contract specific. | Revised Table L1. Consent letters are excluded from the page count. | ||
| 84 | 91 | L.2.3 (b) Part II Past Performance Information | Would the Government please clarify that "If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present relevant contracts" is excluded from page count? It is not clear how to provide this as part of the three-page per contract PP page count requirement, as this information is not contract specific. | Teaming Arrangement is excluded from page count | ||
| 85 | 91 | L.2.3 (b) Part II Past Performance Information | Would the Government please clarify if this is a first-time joint effort, what information is required for the list of past and present relevant contracts? | See RFP section L.2.3 (b) Volume III Past Performance Information | ||
| 86 | 94 | M.1.0.B Factor 2 Price Evaluation | Would the Government please clarify if it is also going to evaluate an Offeror's price for realism in addition to the reasonableness? | The Government will not be evaluating for realism. | ||
| 87 | 4 | (B) Labor | Attachment J1 | |||
| Attachment J2 | Would the Government please provide the workload data to which Offerors are required to bid? | see Q37 | ||||
| 88 | N/A | Attachment L4 DISA Subcontracting Plan Review | Attachment L4 | The subcontracting plan includes a percentage breakdown of the small business status. Does the Government intend to evaluate the Offeror's small business subcontracting plan as pass or fail? | The small business subcontracting plan will be evaluated as pass or fail. | |
| 89 | N/A | Attachment L4 DISA Subcontracting Plan Review | Attachment L4 | Would the Government please provide the intended small business goal for this acquisition? | Small Business Participation plans will be evaluated as acceptable/unacceptable based on the offeror’s explanation and justification in achieving their proposed goals. | |
| 90 | 3 | CLIN 9999 | Surge Support (NTE 20%) - Would the Government please clarify if the intent is to apply the surge suppor (20%) to the quantity of personnel, productive hours, or the ceiling rate per option? | The Surge support should apply to the contractor’s total proposed price. | ||
| 91 | 90 and 91 | L.2.3(b) | Would the Government please clarify if the Offeror is allowed to provide contract details (i - ix) and the Past Performance alignment to the PWS requirements in table format? | A table format is acceptable, however it is preferred to use the template being provided in the RFP | ||
| 92 | 89 | L.1.K | Would the Government please specify whether it wants the Offeror to include the glossary of acronyms as a section inside of each volume or as a preface to volumes after the table of contents? | The glossary of acronyms may be included as a preface to the volumes. | ||
| 93 | 90 and 91 | L.2.3(b) | Could the Government please clarify if the requirement to provide "personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this procurement" is excluded from page count? It is not clear how to provide this as part of the three-page per contract PP page count requirement, as this is not contract specific. | Resumes for Key Personnel are limited to 3pg each. Any other personnel proposed as Key Personnel that is not identified can be submitted with a 3pg limit for each position. |
Past Performance submitted should follow the template informaiton and adding personnel experience is not excluded from the page count.
| 94 | 90 and 91 | L.2.3(b) | Could the Government please clarify what level of detail is required under teaming arrangements for the recent and relevant past performance with the teammate? | See attachment L3 | |
| 95 | 90 and 91 | L.2.3(b) | For teaming arrangements, could the Government please clarify what level of detail is required for the list of relevant contracts if this is an Offeror and Subcontractor teaming together for the first time? | See RFP section L.2.3 (b) Volume III Past Performance Information | |
| 96 | 90 | L.2.3(a) | Will the Government let the Offeror's subcontractors submit their quality documentation (i.e., letters, metrics, customer surveys, etc.) directly to the Government? | only Prime contractor past performance is being evaluated | |
| 97 | Page 5 of 95 | Section C, PWS | It is indicated that this will be a follow on to HC1047-16-D-0010 with Peraton Inc. What is the dollar value of the current/incumbent contract? | $41.5M | |
| 98 | Page 13 of 95 | Section C, PWS | Subsection 11.2 | The table on PWS page 13 does not indicate which applicable positions require a Top Secret clearance level. Please clarify. | Since this is an IDIQ reimbursable contract, all task orders are TBD. Therefore it is unknown a priori what specific labor cateegories (positions) will require what clearacne level. |
| 99 | 89 | Section L, L.1.H | The RFP states "Pages shall be single spaced with 1.5 line spacing." Can the USG please clarify if we are to 1.5 space the entire proposal or is Offeror allowed to use single space? 1.5 spacing greatly reduces the page count. | Revised to: "Pages shall be single spaced." | |
| 100 | 89 | Section L, L.1.H | The RFP states "Pages shall be single spaced with 1.5 line spacing." Can the USG please clarify if we can single space tables, graphs, etc? | Revised to: "Pages shall be single spaced." | |
| 101 | 89 | Section L, L.1.H | With regard to the tables, charts, etc. the instructions state that Offeror may use them for plans. Further instructions state that "Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text." With regard to addressing the understanding and approach to the PWS Section 6 tasks, may Offeror use a table to present our plan in 11 x 17 tables with the use of text? | No, only 8.5 x 11 inches are allowed | |
| 102 | 94 | Section M.1.0.B, Performance Confidence Assessment | Can the USG please clarify if Offeror is to send their PPQ to our contract customer or directly to the POCs for this solicitation? |
If we are submitting our PPQ directly to the USG as part of our proposal submission, which volume should we include them in?
| Can the USG pleae clarify there is No Page Limit for the PPQ? | Offerors are to provide the questionaire to their customers, and they are to submit to the Government before or by time of proposal due date and time. | |||||
| 103 | 2 | Section B - Supplies or Services and Prices | Is the Gov's intent for the 6-Month Extension pricing to be included within the Section B - Supplies or Services and Prices or should the Extension pricing be excluded as it is for evaluation purposes only? | The 6month extension should be included in the Pricing template, since the SF 33 currently does not include it. | ||
| 104 | 3 | Section B (A) | RFP language: "The total amount of all orders placed against all contracts resulting from this solicitation shall not exceed $36,692,424 over a five (5) year period of performance. " | Please confirm the not to exceed amount of $36,692,424 referenced in section B (A) is inclusive of the 20% surge pricing. | The not to exceed amount includes the 20% surge pricing. | |
| 105 | 3 | Section B (A) | RFP language: "The total amount of all orders placed against all contracts resulting from this solicitation shall not exceed $36,692,424 over a five (5) year period of performance. " | Please confirm, if the not to exceed amount of $36,692,424 referenced in section B (A) is excluded from the not to exceed amount? | This is the estimated value of the IDIQ for Base + all Options (Surge + 6 month extension) |
File details come from the government source that posted it. Updated .