This amendment modifies a solicitation for a raised access floor upgrade at a Defense Information Systems Agency data center in Columbus, Ohio. The upgrade includes replacing existing raised flooring in rooms A, B, and C with new floor panels that meet specified thickness, load rating, and material requirements as defined in the original performance work statement and Appendix B. The amendment provides responses to vendor questions about square footage requirements, finished floor heights, load ratings, panel thickness, room entrances and layout, delivery schedules, and the period of performance. An updated copy of Appendix A including the concept drawings is also attached.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102820R0018 00006.pdf | ||
| HC102820R0018 00005.pdf | ||
| HC102820R0018 00004.pdf | ||
| Appendix A - Concept Plan (2020-06-03).pdf | ||
| HC102820R0018 00002.pdf | ||
| HC102820R0018 00001.pdf | ||
| HC102820R0018.pdf | ||
| Price Worksheet.xlsx | XLSX spreadsheet | |
| B - 09 69 13 - Rigid Grid Access Flooring.pdf | ||
| E - Contractor NDA.docx | DOCX document | |
| H - 26-01 Electrical Safety Program.pdf | ||
| C - Signal Reference Grid for Grounding.pdf | ||
| G - SRG Grounding System Commissioning.pdf | ||
| QASP.pdf | ||
| A - CONCEPT DRAWINGS COL-REPLACE RAISED FLOORS-SRG.pdf | ||
| D - Project Close-out.pdf | ||
| F - MIL-STD-188-124B 18Dec2000 (SRG).pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to answ er questions in the attached Question and Answ er document. All other terms and conditions of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC102820R0018
X 9B. DATED (SEE ITEM 11)
12-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jun-2020
CODE
DISA/DITCO-SCOTT-PL83
2300 EAST DRIVE, BUILDING 3600
SCOTT AFB IL 62225-5406
HC1028 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HC102820R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWER
QUESTIONS AND ANSWERS:
1.) How many square feet of raised flooring are you looking to get a quote on for rooms A,B,C?
SEL42 Response: See PWS (HC102820R0018.pdf) section 6.2.1.3.
2.) What is the finished floor height that you are looking to have for each room? (Note: the finished floor height is the measurement from the concrete slab to the top of the new false floor)
SEL42 Response: The replacement raised floor height shall match the existing height, approximately 24”.
3.) What is the correct PSI load rating that you are needing? Note: I saw that the specifications required 2500
PSI for solid raised floor panels but then the perforated panels only required a 1250 PSI. These are 2 different concentrated load ratings and if you need the concreted load rates to exceed 1500 PSI, then the perforated panels would not work. If a standard 1250 PSI works, then would it be ok to proceed with a quote on raised flooring material that has a standard PSI load rating of 1250? Also, I know room A is a computer room, but what is room B and C?
SEL42 Response: The correct PSI load requirements are listed in Appendix B. The two different floor panels have two different PSI loading requirements.
4.) High Pressure Laminate sheets on a concrete raised floor panel comes in a standard thickness of 1/16" not
1/8". 1/8" is considered a customized thickness. Are you sure that you need a 1/8" thickness on a high pressure laminate sheet?
SEL42 Response: Please follow the requirements listed in Appendix B (1/8” thickness required).
5.) How many entrances (doors) are in each room?
SEL42 Response: Varies by room, see Concept Plan (Appendix A).
6.) How many ramps and/or steps are you needing for each entrance?
SEL42 Response: None required, see Concept Plan (Appendix A).
7.) I also was having trouble opening the drawings, can you please send me a copy of the drawings, so that I can see the layout?
SEL42 Response: Yes, we can provide new PDF for the Concept Drawings (Appendix A). Appendix A is attached to this Amendment 00003.
8.) How many perforated panels are you needing for each room?
SEL42 Response: See PWS (HC102820R0018.pdf) section 6.2.1.3.
9.) When are you looking to purchase this material and when do you need this material delivered?
SEL42 Response: See PWS (HC102820R0018.pdf) section 10, period of performance is one-year (12 months).
Material delivery and installation shall be as per contractor’s approved installation plan (PWS section 6.1.8).