About this file

This document is an amendment to a solicitation providing additional questions and answers for a raised access floor upgrade at the Defense Information Systems Agency Data Center in Columbus. The solicitation seeks to upgrade the raised access floor and signal reference grid. The amendment includes answers to 11 additional questions from potential offerors. Key details covered include scheduling a follow-up site visit on June 12, 2020; the government removing steel rack covers and placing fire suppression and detection systems in bypass as needed; matching the new floor elevation to the existing; allowing a contractor project trailer on site with electrical hookup; and permitting work hours of 8 hours per day, 5 days a week or 10 hours per day, 4 days a week, but not on weekends or federal holidays. Offerors must submit any remaining questions by June 11, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to DISA Data Center Columbus Raised Access Floor Upgrade, newest first.
File Type Posted
HC102820R0018 00006.pdf PDF
HC102820R0018 00005.pdf PDF
HC102820R0018 AMD0003.pdf PDF
Appendix A - Concept Plan (2020-06-03).pdf PDF
HC102820R0018 00002.pdf PDF
HC102820R0018 00001.pdf PDF
F - MIL-STD-188-124B 18Dec2000 (SRG).pdf PDF
G - SRG Grounding System Commissioning.pdf PDF
QASP.pdf PDF
A - CONCEPT DRAWINGS COL-REPLACE RAISED FLOORS-SRG.pdf PDF
D - Project Close-out.pdf PDF
E - Contractor NDA.docx DOCX document
H - 26-01 Electrical Safety Program.pdf PDF
C - Signal Reference Grid for Grounding.pdf PDF
HC102820R0018.pdf PDF
Price Worksheet.xlsx XLSX spreadsheet
B - 09 69 13 - Rigid Grid Access Flooring.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The pupose of this Amendment is to provide additional answ ers to follow -on questions from the recent Site Visit. Attached is the Questions and Answ ers contained w ithin this Amendment.

As a reminder to sources interested in proposing to this project, all Questions must be submitted NLT 11 JUNE 2020 by 1400 (2PM) CST.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC102820R0018

X 9B. DATED (SEE ITEM 11)

12-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2020

CODE

DISA/DITCO-SCOTT-PL83

2300 EAST DRIVE, BUILDING 3600

SCOTT AFB IL 62225-5406

HC1028 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HC102820R0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTION AND ANSWER (AMD 0004)

QUESTIONS AND ANSWERS:

1. QUESTION: A request for another site visit has been approved.

ANSWER: The site visit is scheduled for 0900, 12 JUNE 2020. Sources are to email their VAR requests from the original site visit Amendment (Amendment 00001).

2. QUESTION: Two Post Racks – In Room #113 (row A-D: Zone 15&16) there are two areas of two post open racks that are bolted to a power strut assembly below the access floor. In order to replace the access floor, the two-post rack covers need to be removed so that the floor and racks can be uncoupled. Will DISA remove the steel covers on the two post racks to that the work can be accomplished?

ANSWER: The removal of covers will be completed by the Government.

3. QUESTION: Construction Wall Type Below Access Floor: We noted during the walk through that there is a wall below the access floor at the glass store front walls in Room 113 and 125. The store front walls are built atop the access floor as noted in the drawings. Does the wall assembly below the access floor have a rating? 1-hour construction? Does this rating need to be retained?

ANSWER: Wall partitions below the access floor are not fire rated.

4. QUESTION: Fire Damper: We noted fire dampers in the wall construction below the access floor. How are these dampers controlled and can they be placed in bypass in order for the access floor replacement to proceed?

ANSWER: If required, DISA’s BAS system will be able to place fire dampers in by-pass.

5. QUESTION: Fire Suppression and VESDA system bypass: The clean agent fire suppression system and VESDA system should be placed in “Bypass” daily while the replacement of the access floor and SRG system is installed. Will DISA personnel operate the clean agent fire suppression and VESDA panels to place them in bypass?

ANSWER: Yes, DISA’s maintenance contractor will place VESDA system in by-pass.

6. QUESTION: Protection- Rigid Grid specifications require protection following the completion of the installation. This is unrealistic in a live data center and actually can cause safety tripping hazards if plastic or paper is to be protecting the floor for the 5-6-month duration. Should protection be excluded?

HC102820R0018

ANSWER: Appendix B, section 3.4.2 requires protection of traffic areas of the raised floor system. Traffic areas include the travel routes in and out of the data center and within the area of work. The protection is required for new raised floor panels. The contractor is responsible to develop and maintain the protection system in a safe manner. Past projects have successfully used Masonite panels.

7. QUESTION: What does DISA want the contractor to do with the removed access flooring? Turn over to DISA? Provide proof of disposal and or recycling?

ANSWER: PWS shall be updated. Contractor is required to dispose of the existing access flooring.

8. QUESTION: Cove Base – The existing cove base may be damaged or destroyed during the replacement of the access floor. Should replacing the cove base with new base, to match existing in the facility, be considered?

ANSWER: PWS shall be updated. Yes, contractor should include replacing the existing wall base and patch existing wall if damaged during removal of the existing base.

9. QUESTION: Is the new replacement floor to be the same elevation as the existing?

ANSWER: Yes, the proposed floor elevation shall match the existing elevation.

10. QUESTION: Will there be space available for office use in the DISA building or will the GC need to have onsite project trailers and is that allowed. With that, is electrical hook up available for the work site trailer?

ANSWER: No office space will be available in the building. Contractor may have project trailer on site and electrical hookup is available for the trailer. The Contractor is responsible for the electrical connection. Connection must meet electrical code and be installed by licensed electrician.

11. QUESTION: What will be the work hours, can the crew work longer days and will Saturday work be allowed?

ANSWER: Escorts can support 8 hours/day x 5 days a week or 10 hours/day x 4 days a weeks.

Escorts are limited to 40 hours per week. Escorts are not available on Saturdays, Sundays or Federal Holidays.