This modification amends a solicitation for a raised access floor upgrade at the Defense Information Systems Agency Data Center in Columbus. The upgrade involves installing a signal reference grid and securing it to existing access floor pedestals using #6 conductors clamped to every pedestal. Questions were received and answered to clarify that existing access floor specifications apply, #6 conductors clamped to pedestals meet bonding requirements, and two-inch copper straps are not required. The related federal contract opportunity is for the DISA Data Center Columbus Raised Access Floor Upgrade, with responses due under solicitation number HC102820R0018. The amendment provides clarification on technical requirements for bonding the signal reference grid in an existing raised access floor configuration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102820R0018 00006.pdf | ||
| HC102820R0018 00004.pdf | ||
| HC102820R0018 AMD0003.pdf | ||
| Appendix A - Concept Plan (2020-06-03).pdf | ||
| HC102820R0018 00002.pdf | ||
| HC102820R0018 00001.pdf | ||
| HC102820R0018.pdf | ||
| Price Worksheet.xlsx | XLSX spreadsheet | |
| B - 09 69 13 - Rigid Grid Access Flooring.pdf | ||
| F - MIL-STD-188-124B 18Dec2000 (SRG).pdf | ||
| G - SRG Grounding System Commissioning.pdf | ||
| QASP.pdf | ||
| A - CONCEPT DRAWINGS COL-REPLACE RAISED FLOORS-SRG.pdf | ||
| D - Project Close-out.pdf | ||
| E - Contractor NDA.docx | DOCX document | |
| H - 26-01 Electrical Safety Program.pdf | ||
| C - Signal Reference Grid for Grounding.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to answ er additional questions submitted w ith responses and are attached herein to the Amendment titled
Questions and Answ ers.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC102820R0018
X 9B. DATED (SEE ITEM 11)
12-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jun-2020
CODE
DISA/DITCO-SCOTT-PL83
2300 EAST DRIVE, BUILDING 3600
SCOTT AFB IL 62225-5406
HC1028 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HC102820R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWER (AMD0005)
Questions and Answers
1. Question: Appendix C spec 5.3. The last line states “Configure the SRG in 2 foot by 2 foot (maximum) grids in accordance with one of the following:”
a. The following options are “Secure SRG to Subfloor (New Access-Floor Installations)” or “Secure SRG to Floor Pedestals (Existing Access –Floor)”.
b. I assume we can use the “Secure SRG to Floor Pedestals (Existing Access-
Floor)”? and can use #6 for the SRG grid and clamp to every pedestal.
Answer: Yes, we consider this existing access floor and the #6 attached to the pedestals is acceptable.
2. Question: This would also eliminate the need for 5.3.2 d. (3) where it states bond every 3rd access-floor pedestal (maximum 6 foot on centers) to the SRG with a #6 AWG concentric copper conductor since the SRG is already clamped/bonded to every pedestal, correct?
Answer: This depends on the connector you are using at the pedestals. Bonding at every 3rd pedestal is the minimum requirement, if every connector is conductive bonding clamp (UL Listed) than you exceed the minimum requirement.
3. Question: If we are using New Access, are we required to use the 2” wide copper straps and not the #6, correct?
Answer: Not applicable, we consider this an existing access floor (2” copper straps not required).
4. Question: If only the 2” wide copper strap is acceptable, is this to be placed on the floor? And not anchored?
5. Question: Drawing E-100 note 7 states “Exothermic welds are not allowed in the Facility”.
Appendix C 5.3.1 requires the 2 inch wide copper straps to be bonded at every 2’ intersection.
Are they wanting us to bolt this? Normally a cadweld exothermic welded connection is per manufacture installation guide.
HC102820R0018
(End of Summary of Changes)