About this file

Attachment 5_QASP

View the file

Other files

File Type Posted
17R0020__AMD0002.docx DOCX document
HC1028-17-R-0020_0001.docx DOCX document
17R0020_QA_1_-_final.pdf PDF
Attachment_6__DD254.pdf PDF
Attachment_7_Pricing_Sheet.xlsx XLSX spreadsheet
Attachment_4__Key_Personnel_and_Minimum_Qualifications_Matrix.docx DOCX document
HC1028-17-R-0020_CAD_ENG.docx DOCX document
Attachment_2_PAR.pdf PDF
Attachment_8__Task_Scenarios.doc DOC document
Attachment_9__consolidation_D&F.pdf PDF
Attachment_1_NDA.DOCX DOCX document
Attachment_3_TAR.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title (Add contract/task order number at award): DISA MPE CAD & Engineering Services

2. Purpose:

This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

3. Roles and Responsibilities:

The following personnel shall oversee and coordinate surveillance activities.

Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.

Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Contracting Officer’s Representative (COR) and Alternate Contracting Officer Representative (ACOR) – The COR/ACOR is responsible for providing continuous technical oversight of the contractor’s performance. The COR/ACOR uses the QASP to conduct the oversight/surveillance process. The COR/ACOR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR/ACOR is responsible for reporting early identification of performance problems to the KO. The COR/ACOR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR/ACOR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

4. Primary Method of Surveillance:

Surveillance will be conducted using a combination of 100% inspections and periodic inspections. See Appendix 1 – Surveillance Matrix.

Surveillance Matrix

The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR/ACOR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR/ACOR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s/ACOR’s inspection checklist.

5. Performance Standards:

· Monthly Status Reports are accurate and on time at least 80% of the time.

· Facility surveys and reports are technically correct and completed in accordance with standard document format at least 95% of the time.

· Integrated as-built drawings are complete, accurate, and on time at least 95% of the time.

· SharePoint and network drive updates are technically correct and on time at least 95% of the time.

· Master Drawing Format files are sustained to incorporate as-built drawings which are complete, accurate, and on time at least 95% of the time.

· In-house engineering CAD drafting is complete and accurate at least 95% of the time.

· Mechanical and electrical project design engineering calculations, in-house designs, design reviews, draft documentation, cost estimates, and reports are technically correct at least 95% of the time.

· Electrical engineering calculations, in-house designs, design reviews, draft documentation, cost estimates, and reports are technically correct at least 95% of the time.

· Mechanical and electrical engineering project transition technical reports, transition and close-out documentation, ASI tracking/coordination, maintenance recommendations, design reviews, draft documents, cost estimates, CFD models, energy efficiency recommendations, and reports shall be technically correct at least 95% of the time.

· Facility documentation maintenance, updates, and recommendations for Facilities and Maintenance Standards and for Data Center Facility Equipment Technical Engineering Specifications are accurate and timely at least 95% of the time.

· Environmental engineering technical approach recommendations and reports meet technical requirements and are on time at least 95% of the time.

· Environmental engineering site visits and requirements task orders begin within 30 days from task order award 100% of the time.

· Environmental engineering submittals are accurate, complete, and on time at least 95% of the time.

· Professional engineering technical approach recommendations and reports meet technical requirements at least 95% of the time.

· Professional engineering site visits and requirements task orders begin within 30 days from task order award 100% of the time.

· Professional engineering submittals are accurate, complete, and on time at least 95% of the time.

6. Documenting Performance:

Acceptable Performance.

The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.

Unacceptable performance.

Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.

When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).

The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.

Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.

7. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO. The contractor will complete annual reporting required by DARS clause 52.237-9001, Enterprise-wide Contractor Manpower Reporting Application (eCMRA) Reporting.

8. Acceptable Quality Level (AQL):

The AQL for this contract is between 80% and 100% depending on the task. See Appendix 1 – Surveillance Matrix.

9. Evaluation Method:

The COR/ACOR will review deliverables, receive customer feedback, and perform inspections in order to evaluate the contractor’s performance. Acceptable and/or unacceptable performance will be documented and communicated to the contractor and KO according to paragraph 6 of this QASP.

10. Performance Rating

In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).

Performance Rating Criteria

Exceptional
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Appendix 1 - Surveillance Matrix

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

Tasks: 6.1, 6.2, 6.3, &

6.4 – Monthly Status Report, ensure correct and timely information availability

Performance occurs with no required re-performance or re-work at least 80% of the time. Problems that occur are minor and are re-solved in a satisfactory manner.
100% inspection of deliverable materials
Tasks: 6.2, 6.3 & 6.4 – Facility surveys and trip reports are technically correct, completed IAW standard document format.
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are re-solved in a satisfactory manner.
Periodic inspection of deliverable materials.
Subtask 6.1.1 - Integrated as- built drawings into the Master Drawings to ensure complete, correct, and timely information availability.
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials.

Subtask 6.1.1 – SharePoint (DEPS) & network drive updates shall be technically correct and timely infor mation availability.

Performance occurs with no req uired re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

100% inspection of deliverable materials.

Subtask 6.1.2 – Sustain existing Master Drawings Files by incorporating as-built drawings to ensure complete, correct, and timely information availability.

Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

100% inspection of deliverable materials.

Subtask 6.1.3 – Drafting CAD support for in house engineering design.
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials

Subtask 6.2.1 – Mechanical Engineering project design and support. Engineering calculations, in-house designs, design reviews, draft SOWs/PWSs, cost estimates, and reports shall be technically correct

Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

100% inspection of deliverable materials.

Subtask 6.2.2 – Electrical Engineering project design and support. Engineering calculations, in-house designs, design reviews, draft SOWs/PWSs, cost estimates, and reports shall be technically correct
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials.
Subtask 6.2.3 – Mechanical Engineering Project Transition. Technical reports, project transition & close-out documents, maintenance recommendations, design reviews, draft SOWs/PWSs, cost estimates, CFD models, energy efficiency recommendations, and reports shall be technically correct
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials.
Subtask 6.2.4 – Electrical Engineering Project Transition. Technical reviews, ASI tracking/coordination, project transition & close-out documents, maintenance recommendations, design reviews, draft SOWs/PWSs, cost estimates, PDU/UPS load analysis, energy efficiency recommendations, and reports shall be technically correct
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials.
Subtask 6.2.5 – Facility Documentation-Technical Writer. Maintenance, updates, and recommendations for DISA Facilities and Maintenance Standards and data center facility equipment technical engineering specifications.
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials.
Task 6.3 – TR Environmental Services (as requested). Technical approach, recommendations and reports meets technical requirements
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials
Task 6.3 – TR Environmen-tal Services (as requested). Site visit and start TR task order.
Site visit (if required) and TR task order begins within 30 days from award of contract modification.
Periodic inspection of TR process.
Task 6.3 – TR Environmen-tal Services (as requested). Submittals as required by TR.
Performance occurs with no re-quired re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials
Task 6.4 – TR Engineering Services (as requested). Technical approach, recommendations and reports meets technical requirements
Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials
Task 6.4 – TR Engineering Services (as requested). Site visit and start TR task order.
Site visit (if required) and TR task order begins within 30 days from award contract modification.
Periodic inspection of TR process.
Task 6.4 – TR Engineering Services (as requested). Submittals as required by TR.
Performance occurs with no re-quired re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
100% inspection of deliverable materials

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)

|_| NEW

|_| REPEAT

|_| NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS

Appendix 2 – Performance Assessment Report

Appendix 3 – Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 – Corrective Action Report

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

Encl 4, QASP 3Oct2016/V1