QASP_-_DHQCSD14MPA0210.docx

DOCX document 34 KB Posted

Attached to
Security Systems Maintenance at DECC PAC
Solicitation number
HC1028-14-T-0149
Issued by

About this file

Attachment 2 QASP

View the file

Other files

File Type Posted
HC1028-14-T-0149-0003.pdf PDF
JA_DHQCSD14MPA0210R.docx DOCX document
HC1028-14-T-0149-0002.pdf PDF
RAPIDGate-Company-Enrollment-Form.docx DOCX document
Attach_1_-_PWS.doc DOC document
Attach_8_-_VAR_Info.docx DOCX document
HC1028-14-T-0149-0001.pdf PDF
PWS_-_DECC_PAC_security_system.doc DOC document
Attachment_4_-_DHQCSD14MPA0210_-_Bid_format_sheet.xlsx XLSX spreadsheet
HC1028-14-T-0149.docx DOCX document
PP_REFERENCES.docx DOCX document
Attach_5_Evaluation_Table.docx DOCX document
Attachment_7_Scenario_TR.docx DOCX document
Attachment_8_VAR_Info.docx DOCX document
Attachment_6_Call_History.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: Security System Maintenance at DECC PAC

2. Work Requirements:

6.1. Task 1: Preventative Maintenance Services

6.2. Task 2: Emergency Maintenance Services (24x7)

6.3 Task 3: Unscheduled Maintenance and Repair Service Calls

6.4. Task 4: Realignment, Additions and Modification to Existing Equipment

3. Primary Method of Surveillance:

The method of surveillance varies by task with 100 percent inspection for critical emergency repairs, service reports, and AQ forms; random sampling for routine on-going maintenance, and periodic inspection for infrequent tasks, to be recorded at frequencies defined by the deliverables section of the PWS.

· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.

· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.

· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished.

The facility manager or alternate facility representative should know when Contractor personnel are performing services in support of the facility, whether routine, emergency, or in support of a Technical Requirement (TR). The Contractor personnel shall sign in to the supported facility in accordance with established security and visitor protocols, and shall physically notify the facility manager or alternate facility representative of their arrival and departure. As a QA representative for the Government, the facility manager may, for any service visit, request the Contractor personnel to demonstrate what work was accomplished during the visit, discuss the condition of the serviced equipment, and/or inspect with the Contractor personnel the services rendered for compliance with guidance and instructions for the specific services. All demonstration/inspections shall be documented with a signed QA (CD521-2178) form. (Security escort personnel are not authorized and may not be delegated to inspect or sign as complete work accomplished under this contract.)

4. Scope of Performance:

An overview of the work to be provided under this contract follows. The Contractor shall:

· Provide scheduled preventative maintenance services to the integrated access control system (ACS), intrusion detection system (IDS), and closed circuit television (CCTV) system.

· Provide emergency repair/sustainment services, as necessary, for the integrated security system.

· Provide response to unscheduled service calls of minor maintenance and repair (non-emergency) which may occur between scheduled preventative maintenance visits.

· Provide services to realignment, additions, and modification, of components to the security system as required during the lifetime of the contract.

· Document the system layout and connectivity, and provide complete Configuration Management of the system(s) through the life of the contract.

· Ensure that the system meets all security and safety guidance and requirements of section 12 and 14 of this contract.

Analog layout plans of the facilities indicating the layout of existing security equipment are available solely to bidding vendors through the contracting office. These informational layout diagrams are restricted for security reasons and will not be disseminated through other channels. Digital (CAD) layout plans of the facilities, generally without existing security equipment and communications layout information, will be provided at time of award to the successful bidder.

Associated equipment and hardware such as electronic door strikes, magnetic locks, panic/crash bars, door hardware (including hinges, handle sets, lock sets, power openers, & latch guard plates), X-09 (and similar) high-security locksets, strobe lights & switches, legacy emergency backup batteries, controller units and enclosures, and control & power wiring for the system is also present and included in the scope of this agreement. The Contractor will be responsible for maintenance and repair of these additional components. Doors in the facility that do not have security devices on them are excluded from the scope (although they may be added to the scope by the addition of security system equipment).

The Contractor is responsible for surveying the existing building and security systems to confirm the number, location, and type of installed equipment and the support requirements for each. All new conductors (power and data) are required to be installed into conduit (not free-run). Where existing (legacy) equipment is used, retrofit of existing conductors into conduit is not required until that legacy equipment is replaced. Proposals and designs shall explicitly indicate where legacy free-run conductors (power and data) are located. Where legacy equipment is replaced, conductors shall be replaced and installed into conduit (not free-run).

5. Performance Standards:

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

Task 6.1. PM Services. (Task 1) Subtask 6.1.1. Provide semi-annual scheduled PM for the Access Control and Intrusion Detection security systems.

Security system equipment is properly working at least 95% of time.
Random Sampling inspection of deliverable products and services.
Subtask 6.1.2. Provide semi-annual scheduled PM for the CCTV system.
System equipment is properly working at least 95% of time.
Random Sampling inspection of deliverable products and services.
Subtask 6.1.3. Databases shall be backed up and stored in a secure offsite location at least quarterly.
100% of database backed up and stored offsite quarterly.
Periodic inspection of deliverable products and services.
Subtask 6.1.4. Databases shall be cleaned and optimized semi-annually by the contractor.
Databases shall be cleaned and optimized semi-annually.
Periodic inspection of deliverable products and services.
Subtask 6.1.5. Provide two hundred (200) proximity cards and four (4) printer ribbons during each performance
Materials provided with no deficiencies within 30 calendar days of the OY Notice to Proceed.
100 Percent Inspection of deliverable products and services.
Subtask 6.1.6. PM service shall be completed within 30 days of contract award and again approximately every six months minimum, as scheduled and coordinated with the site Security Manager.
PM completed within 30 calendar days of contract NTP and every six months minimum, as scheduled and coordinated with the site Security Manager.
Random Sampling inspection of deliverable products and services.
Subtask 6.1.7. Contractor shall notify the Government on necessary repairs and improvements to the security system.
Notification within 15 calendar days of findings 100% of the time.
100 Percent Inspection of deliverable products and services.
Subtask 6.1.8.1. Software/Firmware patches and releases shall be installed on all security system IT equipment.
Software and firmware are updated when upgrades, updates, patches, and similar are available 100% of the times within 30 calendar days of release.
Periodic inspection of deliverable products and services.
Subtask 6.1.8.2. OS anti-virus programs and all installed applications are kept up-to-date.
Anti-virus programs updates are available 100% of the time.
Periodic inspection of deliverable products and services.
Subtask 6.1.8.3. Premium Software Support agreement with the integrated security system software manufacturer.
All necessary licenses are provided along with software authorizations and training certificates to operate and maintain that system.
Periodic inspection of deliverable products and services.
Subtask 6.1.8.4. Training is provided to Security Managers when software has been updated during ongoing PM services.
Training is provided 100% of the time with no deficiencies at the time of the upgraded software installation.
Periodic inspection of deliverable products and services.
Subtask 6.1.8.5. STIG requirements are updated during ongoing PM services.
STIG update services are performed with no deficiencies at the time of the PM services.
Periodic inspection of deliverable products and services.
Subtask 6.1.9. Service Report on tasks performed, software and firmware releases (to include STIGs) installed, any findings relating to equipment condition and/or recommendations to improve the condition of the system. .
Report of services performed is provided to the COR and site Security Manager concurrently not more than 15 calendar days following completion of PM services in electronic format.
100 Percent inspection of deliverable products and services.
Subtask 6.1.10. QA Surveillance Form shall be used to record observations and certify that all onsite services are completed as required at every onsite service.
OA form is signed and provided to the site Technical Representative 100% of the time indicating completion and acceptance of services rendered shall be provided to the COR not more than 15 calendar days following the completion of PM services in electronic format..
100 Percent inspection of deliverable products and services.
Subtask 6.1.12.2.CM Equipment List: The CM system shall be supported by an electronic organization tool (spreadsheet is acceptable)
CM equipment lists are 100% accurate and shall be provided at the completion of any work which alters the inventory, not more than 15 calendar days following the completion of the service.
100 Percent inspection of deliverable products and services.
Subtask 6.1.12.3. CM Drawings: The contractor shall maintain a Record Drawing of the security system fully compliant with the Record Drawing CM e in AutoCAD 2010 or more recent .dwg format only
CM drawings are 100% accurate and shall be provided at the completion of any system upgrade, and again at the conclusion of any work which alters the inventory, not more than 15 calendar days following the completion of the service.
100 Percent inspection of deliverable products and services.

Task 6.2. Emergency Maintenance Services (24x7) (Task 2) Subtask 6.2.1. Emergency calls shall be worked continuously “around the clock” until completed. Estimated completion date/times and progress reports shall be provided to the Security Manager at least three times per workday.

Emergency response is within 4-hours of call by trained, proficient operations and repair contractor personnel (report to site or as directed by site representative). Response to and completion of corrective work is timely with required updates provided 90% of the time.
100 Percent inspection of deliverable products and services.
Subtask 6.2.2. Critical parts for the security system shall be obtained within a reasonable timeframe of 72 hours.
Response to and completion of corrective work is timely with updates on material parts status provided within 72 hours of initial call.
Random Sampling inspection of deliverable products and services.
Subtask 6.2.3. Service Report on tasks performed, any findings relating to equipment condition and/or recommendations to improve the condition of the system.
Report of services performed is provided to the COR and site Security Manager concurrently not more than 15 calendar days following completion of emergency services in electronic format.
100 Percent inspection of deliverable products and services.
Subtask 6.2.4. QA Surveillance Form shall be used to record observations and certify that all onsite services are completed as required at every onsite service.
OA form is signed and provided to the site technical representative 100% of the time indicating completion and acceptance of services rendered shall be provided to the COR not more than 15 calendar days following the completion of emergency services in electronic format..
100 Percent inspection of deliverable products and services.

Task 6.3. Unscheduled Maintenance and Repair Service Calls. (Task 3) Subtask 6.3.1. Service Call report shall be provided on tasks performed, software and firmware repairs or installs, any findings relating to equipment condition and/or recommendations to improve the condition of the system.

Report of services performed is provided to the COR and site Security Manager concurrently not more than 15 calendar days following completion of emergency services in electronic format.
100 Percent inspection of deliverable products and services.
Subtask 6.3.2. QA Surveillance Form shall be used to record observations and certify that all onsite services are completed as required at every onsite service.
QA form is provided 100% of the time with cost information to the Contracting Office and site Security Manager concurrently not more than 15 calendar days following completion of services in electronic format.
100 Percent inspection of deliverable products and services.
Subtask 6.3.2. Cost reports of each service call shall be provided to the COR with a total of the accruing costs tracked throughout the performance period.
Accruing costs of the service calls on a monthly basis are provided 100% of the time to the COR and site technical point of contact within 5 calendar days after completion of the month which work occurred
100 Percent inspection of deliverable products and services.

6.4. Realignment, Additions, and Modification to Existing Equipment (Task 4) Subtask 6.4.1. Prepare Technical Requirement (TR) cost estimates of hardware/software and labor hours to complete such an installation.

Technical requirement proposals are prepared and provided to the COR within the 10 calendar days of the government request.
Periodic inspection of deliverable products and services
Subtask 6.4.2. Technical Submittal information from the OEM on equipment installed shall be provided.
Equipment technical information is provided 100% of the time to the COR in electronic format not more than 15 calendar days following the system change.
Periodic inspection of deliverable products and services
Subtask 6.4.3. Drawings: The contractor shall maintain a Record Drawing of the security system fully compliant with the Record Drawing CM e in AutoCAD 2010 or more recent .dwg format only
CM drawings are 100% accurate and shall be provided at the completion of any system upgrade, and again at the conclusion of any work which alters the inventory, not more than 15 calendar days following the completion of the service.
Periodic inspection of deliverable products and services.
Subtask 6.4.4. Service Report on tasks performed, software and firmware releases (to include STIGs) installed, any findings relating to equipment condition and/or recommendations to improve the condition of the system. .
Report of services performed is provided to the COR and site Security Manager concurrently not more than 15 calendar days following completion of TR services in electronic format.
100 Percent inspection of deliverable products and services.
Subtask 6.4.5. QA Surveillance Form shall be used to record observations and certify that all onsite services are completed as required at every onsite service.
OA form is signed and provided to the site Technical Representative 100% of the time indicating completion and acceptance of services rendered shall be provided to the COR not more than 15 calendar days following the completion of TR services in electronic format..
100 Percent inspection of deliverable products and services.

6. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer’s Representative (COR) and the contracting officer (KO) will evaluate the initial submission. The COR and KO will conduct ad hoc reviews of the contractor’s compliance throughout the remainder of the contract. The statutory or regulatory compliance items that are part of the contract such as combating trafficking in persons, EEO, wage determinations, intellectual property, subcontracting plan compliance, etc. (see the COR handbook) will be monitored. The COR must notify the Contracting Officer if there are any potential or actual non compliance issues with federal statues, laws, or regulations, since the KO is the only person that can resolve these noncompliance issues related to law or regulations.

7. Acceptable Quality Level (AQL):

The AQL is described in the performance threshold information in the tables in section 5 above.

8. Evaluation Method:

The COR will document the time of verbal notification to the contractor. The on-site government representative will document and notify the COR and the contractor on the following:

· Random sampling of Preventive Maintenance and 100% inspect of the summary reports of Preventive Maintenance (PM) performed and notification of all firmware updates.

· 100% inspection of all Emergency Maintenance Services with the official time and date of notification on the Maintenance Call Record.

· Periodic inspection of all Unscheduled Maintenance and Repair Service Calls.

· Site government representative will acknowledge and concur on a QA Surveillance Form with 100% inspection on all technical requirements work performed for realignment, additions and modifications to security system equipment.

The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the system is restored to full operational status. The COR will confirm the date and time of problem resolution in the record.

9. Incentives (Positive and/or Negative): None.