Attachment 7 Scenario Technical Requirement

View the file

Other files

File Type Posted
HC1028-14-T-0149-0003.pdf PDF
JA_DHQCSD14MPA0210R.docx DOCX document
HC1028-14-T-0149-0002.pdf PDF
RAPIDGate-Company-Enrollment-Form.docx DOCX document
Attach_1_-_PWS.doc DOC document
Attach_8_-_VAR_Info.docx DOCX document
HC1028-14-T-0149-0001.pdf PDF
PWS_-_DECC_PAC_security_system.doc DOC document
Attachment_4_-_DHQCSD14MPA0210_-_Bid_format_sheet.xlsx XLSX spreadsheet
HC1028-14-T-0149.docx DOCX document
PP_REFERENCES.docx DOCX document
Attach_5_Evaluation_Table.docx DOCX document
QASP_-_DHQCSD14MPA0210.docx DOCX document
Attachment_8_VAR_Info.docx DOCX document
Attachment_6_Call_History.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Work Requirement |_| Statement of Objectives (SOO) / |X| Statement of Work (SOW)

Project: SCENARIO General security changes in Facility Location:

Date:

Technical Requirement (TR) Number: xx-xx-xxxx Type of Funding: |_| Facilities |_| Raised Floor |X| BOS Military Interdepartmental Purchase Request (MIPR) Number:

Suggested Contract CLIN for Work Request: 4 Required Operational Date: xx/xx/xxxx

Government Technical Points of Contact

Primary Point of Contact:

Secondary Point of Contact:

Specific Work Requirements Section

1. Run conduit to new door. 50ft

1. Purchase and install new equipment listed below:

0. BMS for door

0. PTZ camera

0. Magnetic Lock

0. IDS keypad

0. 2 weatherproof ACS card readers

1. Program new equipment into existing system and test for functionality.

1. Update CAD drawings and configuration management files to reflect these additions.

General Work Requirements Section

1. Equipment, circuits, and enclosure boxes shall be labeled IAW the labeling specification in the DISA Facilities Standards.

2. All work shall be supported by an Energized Electrical Work Permit signed by the site Director or his/her appointed designee prior to any energized work. Ongoing, similar, and repetitive electrical work may be covered by an ongoing Permit at the discretion of the site Director.

3. The Contractor shall provide redline drawings indicating actual installed paths followed by each circuit to the building Facility Manager and to DISA Computing Services – Facilities Engineering Team.

4. The Contractor shall maintain a clean work area and, after each day’s work, clean the construction site. Projects may require that the Contractor provide additional roll-off or other rubbish receptacles specifically for project use. After completion of the job, the Contractor shall ensure that ALL dust and construction materials are removed from the project site. All excess materials and residue left over from the performance of this contract shall be removed from the building and removed from the facility, and shall be disposed of off base. The Contractor shall be responsible for cleaning and vacuuming any dust, trash and any water on the floor for which he is responsible during the course of this contract. NO residual material shall be left on the premises.

5. Any damage to the facility incurred by the Contractor during a project shall be repaired by the Contractor at the Contractor’s expense.

Technical Work Requirement Page 1 of 2