This file is a visual floor plan document depicting HVAC split-unit system locations across four buildings at Joint Base Lewis-McChord. The plan identifies 16 ductless heat pump A/C system locations distributed across Buildings 9160 (East and West wings with 139 units each), 9190 (Main Floor GCR), 9934 (First Floor units G103A, G103B, G105A, G105B, G108, G109, and Second Floor units G203A, G203B, G205A, G205B), and 9983 (Second Floor G202). A specific notation indicates that Building 9934 room H120 contains two evaporators. The document serves as a reference guide for the Split-Unit HVAC Replacement solicitation (H9242126QE047) issued by United States Special Operations Command.

The accompanying solicitation requires contractors to remove and replace 16 nonfunctional ductless heat pump A/C systems with new cooling-only split A/C units across the identified facilities to maintain optimal temperatures for critical computer and communication systems. The scope includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of existing units, installing and testing new units, adding external condensation pumps, and purging and testing existing drain lines with replacement as needed. The performance period runs from September 28, 2026, through November 12, 2026. A mandatory site visit is scheduled for September 18, 2026, at 1:30 p.m. (PDT) at 9190 Cramer Ave, with written questions due by September 21, 2026, at 5:00 p.m. (EDT). The contractor will operate independently under its own supervision while remaining fully accountable to the Government for meeting all performance standards.

View the file

Other files

File Type Posted
AC INFO_update.xlsx XLSX spreadsheet
HVAC Replacement RFIs_additional (002).docx DOCX document
HVAC Replacement RFIs_all.docx DOCX document
Solicitation Amendment H9242126QE0470001 SF 30.pdf PDF
PWS_1SFG_MICC_Split Units_Updated final.docx DOCX document
HVAC Floor Plan_Split Units.pptx PPTX presentation
AC INFO.xlsx XLSX spreadsheet
FAR_52.212-1_Addendum_-_Instructions_to_Offerors_(1SFG_HVAC_Replacement).docx DOCX document
Pierce County Wage Determination.txt TXT text file
Solicitation - H9242126QE047 - CO Signed.pdf PDF
PWS_1SFG_MICC_Split Units_Updated_2.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG 9190

Main Floor

GCR

BLDG 9983

Second Floor G202

BLDG 9160 East

BLDG 9160 West

BLDG 9934

First Floor

G103A G103B H120 G108 G109 G105B G105A NOTE: Room H120 contains two evaporators

BLDG 9934

Second Floor

G205B G205A G203A G203B image1.png image2.png image3.png image4.png image5.png image6.png image7.png

File details come from the government source that posted it. Updated .