Addenda 03 - Work Package Pricing Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- VESSEL REPAIR - STENNIS, MISSISSIPPI
- Solicitation number
- H9224025QE028
- Issued by
-
United States Special Operations Command
About this file
This file is an Addenda 03 Work Package Pricing Sheet for vessel repair services covering multiple marine vessels for the United States Special Operations Command. The document details comprehensive repair packages for six different vessel types: 50' Ocean Sport Fisher, 38' Fountain Center Console, 24' Sailfish, 25' Boston Whaler Guardian, 25' Safe Boat SFA 29, Jet Ski, and Grady White 360 Express. Each vessel type has multiple repair work packages ranging from engine maintenance, electrical system repairs, hull and fiberglass work, trailer maintenance, propeller replacement, to upholstery renewal. Repair timelines for individual work packages vary from 2 to 120 days, with most packages taking between 10-30 days to complete.
The solicitation (H9224025QE028) is for vessel repairs near Stennis, Mississippi, with questions due by Thursday, July 17, 2025, at 5:00 PM Pacific Time. Vendors are instructed to submit questions to john.knizner@socom.mil and are advised to monitor SAM.GOV for updates and potential solicitation revisions. The pricing sheet includes placeholder evaluation pricing sections with $0.00 values, suggesting that detailed pricing will be submitted by potential contractors. Each vessel type has an "Over and Above Work" hourly labor rate marked as "TBN" (To Be Negotiated), indicating flexibility in pricing for additional or unforeseen repair work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Pacakges Addenda 03 - Work Package Pricing Sheet
| 50' OCEAN SPORT FISHER (OSF) REPAIR PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| OSF 1 – Main Engine oil/filters change and fuel filters, two engines | 3 | |||||
| OSF 2 – Recertify fixed fire extinguishing system and replace the four portable fire extinguishers | 5 | |||||
| OSF 3 – Recertify / service the emergency life raft | 15 | |||||
| OSF 4 – Haul out vessel, pressure wash / clean hull and running gear, and return to water. Includes up to 90 days on the hard | 5 | |||||
| OSF 5 – Replace all underwater zincs / anodes | 10 | |||||
| OSF 6 – Marine Gear oil/filter change, two marine gears | 2 | |||||
| OSF 7 – Polish external surfaces of hull freeboard, cabin, and deck house to remove oxidation | 15 | |||||
| OSF 8 – Generator oil/filter change and fuel filters | 2 | |||||
| OSF 9 – Scuff and prep hull, and paint hull with top quality anti-fouling hull paint (includes haul on the hard) | 30 | |||||
| OSF 10 – Straighten, groom, and polish two propellers (includes haul out, and time on the hard) | 15 | |||||
| OSF 11 – Replace propellers (includes haul out, and time on the hard) | 15 | |||||
| OSF 12 – Repair or replace marine electronics/electrical system | 15 | |||||
| OSF 13 – A/C system repair or replace to include sea water cooling pumps and house filters | 10 | |||||
| OSF 14 − Repair main engines to include haul out, rebuild or replace | 120 | |||||
| OSF 15 – Generator repair to include haul out, replace or rebuild | 45 | |||||
| OSF 16 – Repair marine gear include rebuild or replace gear | 60 | |||||
| OSF 17 – Replace strut shaft bearing include hall out and relaunch of boat | 10 | |||||
| OSF 18 – Repair hull damage and under water metals from marine environment include haul out relaunch of boat | 45 | |||||
| OSF 19 – Repair or replace hydraulic steering system and associated parts | 15 | |||||
| OSF 20 – Replace wind screen and upholstery | 25 | |||||
| OSF 21 − Repair or replace vessel sanitary system and associated parts | 15 | |||||
| OSF 22 – Repair fiberglass hull damage | 30 | |||||
| OSF STORAGE ON THE HARD- Daily Rate | NOT APPLICABLE | |||||
| OSF OVER AND ABOVE WORK FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| 38' FOUNTAIN CENTER CONSOLE (FCC) REPAIR PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| FCC 1 – Main Engine oil and filter change, three engines | 2 | |||||
| FCC 2 – Main Engine service tune up including fuel filters, lower unit lubrication fluids, spark plugs, water pumps, and belt three engines | 5 | |||||
| FCC 3 – Replace upholstery | 20 | |||||
| FCC 4 – Replace propellers | 2 | |||||
| FCC 5 – Polish external surfaces of the hull and console to remove oxidation | 10 | |||||
| FCC 6 – Replace trailer rim and tire | 5 | |||||
| FCC 7 – Replace trailer tires | 5 | |||||
| FCC 8 – Rebuild all trailer brakes with new disc, pads, springs, and associated components, replace wheel bearings | 10 | |||||
| FCC 9 − Repair or replace marine electronics/electrical system | 15 | |||||
| FCC 10 – Repair trailer electrical and lighting | 5 | |||||
| FCC 11 – Rebuild or replace up to three engines including lower units | 25 | |||||
| FCC 12 – Repair or replace hydraulic steering system and associated parts | 15 | |||||
| FCC 13 − Repair or replace vessel sanitary system and associated parts | 15 | |||||
| FCC 14 – Repair fiberglass hull damage | 30 | |||||
| FCC 15 - OVER AND ABOVE WORK - FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| 24' SAILFISH (SF) REPAIR PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| SF 1 – Main Engine oil and filter change, two engines | 2 | |||||
| SF 2 – Main Engine service tune up including fuel filters, lower unit lubrication fluids, spark plugs, water pumps, timing belt two engines | 5 | |||||
| SF 3 – Replace upholstery | 20 | |||||
| SF 4 – Replace propellers | 5 | |||||
| SF 5 – Polish external surfaces of the hull and console to remove oxidation | 10 | |||||
| SF 6 – Replace trailer rim and tire | 5 | |||||
| SF 7 – Rebuild or replace up to two engines to include lower units | 25 | |||||
| SF 8 – Rebuild all trailer brakes with new disc, pads, springs, and associated components, replace wheel bearings | 10 | |||||
| SF 9 – Replace or repair marine electronics/electrical system | 15 | |||||
| SF 10 – Repair trailer electrical and lighting | 5 | |||||
| SF 11 − Repair or replace hydraulic steering system and associated parts | 15 | |||||
| SF 12 – Replace trailer tires | 5 | |||||
| SF 13 − Vessel fiberglass repair | 30 | |||||
| SF 14 - OVER AND ABOVE WORK -FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| 25' BOSTON WHALER GUARDIAN (D404, A303, (BWG) REPAIR PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| BWG 1 – Main Engine service including fuel filters, lower unit lubrication fluids, spark plugs, water pumps, two engines | 5 | |||||
| BWG 2 – Repair or replace marine electronics/electrical system | 15 | |||||
| BWG 3– Replace propellers | 5 | |||||
| BWG 4– Replace trailer rim and tire | 5 | |||||
| BWG 5– Replace trailer tires | 5 | |||||
| BWG 6− Rebuild all trailer brakes with new disc, pads, springs, and associated components, replace wheel bearings | 10 | |||||
| BWG 7– Repair or replace hydraulic steering system and associated parts | 15 | |||||
| BWG 8– Repair trailer electrical and lighting | 5 | |||||
| BWG 9 – Rebuild or replace main engine quantity two per vessel include lower units | 25 | |||||
| BWG 10 − Polish external surfaces of the hull and console to remove oxidation | 10 | |||||
| BWG 11. – Vessel fiberglass repair | 30 | |||||
| BWG 12 - OVER AND ABOVE WORK - FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| 25' SAFE BOAT SFA 29 (SFA) WORK PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| SFA 1 – Main Engine oil filter change, two engines | 2 | |||||
| SFA 2 – Main Engine service including fuel filters,belts, lower unit lubrication fluids, spark plugs, water pumps, two engines | 5 | |||||
| SFA 3 – Repair or replace marine electronics/electrical system | 15 | |||||
| SFA 4 – Replace propellers | 5 | |||||
| SFA 5 – Replace trailer rim and tire | 5 | |||||
| SFA 6 – Replace trailer tires | 5 | |||||
| SFA 7 − Rebuild all trailer brakes with new disc, pads, springs, and associated components, replace wheel bearings | 10 | |||||
| SFA 8 – Repair or replace hydraulic steering system and associated parts | 15 | |||||
| SFA 9 – Repair trailer electrical and lighting | 5 | |||||
| SFA 10 – Rebuild or replace main engine quantity two per vessel include lower units | 25 | |||||
| SFA 11 – Replace or repair sponson | 30 | |||||
| SFA 12 – Repair aluminum hull damage | 30 | |||||
| SFA 13 – Replace upholstery | 25 | |||||
| SFA 14 - OVER AND ABOVE WORK - FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| JET SKI WORK PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| JS 1 – Main Engine oil filter change | 2 | |||||
| JS 2 – Repair or replace main engine | 25 | |||||
| JS 3 – Replace trailer tires | 5 | |||||
| JS 4 – Repack or replace trailer wheel bearings (per wheel basis) | 5 | |||||
| JS 5 – Repair/replace trailer electrical and lighting | 5 | |||||
| JS 6 – Replace main engine impeller | 3 | |||||
| JS 7 – Tune up main engine replace spark plugs, inspect/replace air filter | 2 | |||||
| JS 8 – Repair hull damage include paint, decals and buffing | 30 | |||||
| JS 9 – Replace upholstery | 15 | |||||
| JS 10 - OVER AND ABOVE WORK - FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| GRADY WHITE 360 EXPRESS (GWE) WORK PACKAGES | REPAIR TIMELINE (DAYS) | OP1 | OP2 | OP3 | OP4 | OP5 |
| GWE 1 – Main Engine oil and filter change, three engines | 2 | |||||
| GWE 2 – Main Engine service tune up including fuel filters, lower unit lubrication fluids, spark plugs, water pumps, and timing belt three engines | 5 | |||||
| GWE 3 – Replace upholstery | 25 | |||||
| GWE 4 – Polish external surfaces of the hull and console to remove oxidation | ||||||
| GWE 4A - Without wetsand treatment | 15 | |||||
| GWE 4B - With wetsand treament | 15 | |||||
| GWE 5 − Repair or replace marine electronics/electrical system | 15 | |||||
| GWE 6 – Rebuild or replace up to three engines including lower units | 25 | |||||
| GWE 7 – Repair or replace hydraulic steering system and associated parts | 15 | |||||
| GWE 8 − Repair or replace vessel sanitary system and associated parts | 15 | |||||
| GWE 9 – Recertify fixed fire extinguishing system | 5 | |||||
| GWE 10 – Recertify / service the emergency life raft | 15 | |||||
| GWE 11 – Replace all underwater zincs / anodes | 10 | |||||
| GWE 12 – Polish external surfaces of hull freeboard, cabin, and deck house to remove oxidation | ||||||
| GWE 12A - Without wetsand treatment | 15 | |||||
| GWE 12B - With wetsand treament | 15 | |||||
| GWE 13 – Generator oil/filter change and fuel filters | 2 | |||||
| GWE 14 – Scuff and prep hull, and paint hull with top quality anti-fouling hull paint (includes haul on the hard) | 30 | |||||
| GWE 15 – A/C system repair or replace to include sea water cooling pumps and house filters | 15 | |||||
| GWE 16 – Generator repair to include haul out, replace or rebuild | 10 | |||||
| GWE 17 – Repair hull damage and under water metals from marine environment include haul out relaunch of boat (per 6ft) | 30 | |||||
| GWE 18 – Replace wind screen and upholstery | 25 | |||||
| GWE 19 − Vessel fiberglass repair | 30 | |||||
| GWE 20 – Replace propellers | 5 | |||||
| GWE - STORAGE ON THE HARD - DAILY RATE | NOT APPLICABLE | |||||
| GWE 21 - OVER AND ABOVE WORK - FIXED PRICE LABOR RATE (HOURLY RATE) | TBN |
| DO NOT MODIFY PRICE EVALUATION TABLE | |
| Base Period Evaluated Price | $0.00 |
| FAR 52.217-8 Evaluated Price | $0.00 |
| TOTAL EVALUATED PRICE | $0.00 |
File details come from the government source that posted it. Updated .